Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DMX.V ·

District Samples up to 253.0 g/t Silver, 22.8% Zinc, and 8.6% Lead on the Svardsjo Property

Drill Results Sampling & Geoscience Results

District Samples up to 253.0 g/t Silver, 22.8%

Zinc, and 8.6% Lead on the Svardsjo Property

Vancouver, British Columbia--(Newsfile Corp. - January 10, 2022) -

District Metals Corp. (TSXV:

DMX) (FSE: DFPP); ("District" or the "Company")

is pleased to report on assay results from grab

and chip rock samples recovered from geological fieldwork carried out in late-2021 at its polymetallic

Svärdsjö Property in the Bergslagen Mining District of south-central Sweden. This fieldwork consisted of

reconnaissance prospecting and geochemical sampling at some of the historical mines and showings

along a four kilometer mineralized trend within the 1,037 hectare Svärdsjö Property.

Garrett Ainsworth, CEO of District, commented: "These assay results from Svärdsjö show very high

grades of polymetallic mineralization which supports the exceptional potential of the property.

Significant

mineralization remains open beneath and southwest of the historic Svärdsjö and Kompanigruvan Mines,

which represents walk up drill targets.

Also importantly, numerous other historic mines and showings are

strewn across the Svärdsjö Property that appear to have seen little to no modern work.

In particular, the

Stormyrgruvan showing returned exceptionally high silver-zinc-lead values from a mine dump rock

sample, which is especially impressive given the location and size of this showing where no records of

modern exploration exist.

We are keen to obtain the interpreted data from our recently flown SkyTEM

312 HP electromagnetic and magnetic survey at Svärdsjö, which will provide important layers of

information to advance existing targets and identify new targets."

Rock Sample Assay Highlights

Chip sampling from outcrop at the Kompanigruvan Pit returned

37.3%

ZnEq

1

(253.0 g/t Ag,

22.8% Zn, 8.6% Pb, 0.1 g/t Au, and 0.02% Cu)

.

Kompanigruvan is a southwest extension of the

historic Svärdsjö Mine where mine maps show that polymetallic mineralization at Kompanigruvan

remains open at depth and to the southwest.

Grab sampling from mine dumps at the Stormyrgruvan showing returned

29.0%

ZnEq

1

(133.0 g/t

Ag, 15.7% Zn, 7.8% Pb, 0.1 g/t Au, and 1.0% Cu)

.

Stormyrgruvan remains open in all directions

with no record of historic drilling.

Grab sampling from a historic pit at the Hagsfallgruvan showing returned

18.3%

ZnEq

1

(58.2 g/t

Ag, 9.8% Zn, 7.1% Pb, 0.1 g/t Au, and 0.2% Cu)

.

Hagsfallgruvan remains open in all directions

with no record of historic drilling.

Rock sample locations are shown in Figure 1, and rock assay results are shown in Table 1.

Historical records show that mining on the Svärdsjö Property commenced during the 15

th

century, and

the Svärdsjö deposit itself was mined from the mid-1700's until 1989. There is excellent potential for

extensions of the known polymetallic mineralization at the Svärdsjö and Kompanigruvan mines, and for

new mineralization to be discovered within the Svärdsjö Property

2

.

Exploration drilling was conducted by Boliden at the Svärdsjö Mine after it closed in 1989, which

revealed a continuation of the Svärdsjö deposit and Kompanigruvan at depth and to the southwest as

two separate polymetallic bodies named the Fäbodgruvan and Vilnäset zones (Figure 2).

The

polymetallic mineralization at these zones consists of sphalerite (zinc), galena (lead and silver), and

chalcopyrite (copper and gold), which remains open

2

.

In November 2021, District Metals retained SkyTEM Surveys ApS based out of Denmark to undertake a

detailed heliborne SkyTEM312 HP (transient electromagnetic - high power) and magnetic survey over

the Svärdsjö Property.

Electromagnetic and magnetic data from this airborne survey is currently being

interpreted and will be reported on when completed.

This is the first step of exploration at Svärdsjö that

will be followed by detailed geological fieldwork in order to prioritize drill targets.

Figure 1: Rock Sample Locations and Assays on Svärdsjö Property

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/7971/109509_af3a3d8fc46b4b3a_002full.jpg

Table 1: Svärdsjö Rock Assay Results

Mine or

Showing

Sample

Type

Comments

Ag (g/t)

Zn (%)

Pb (%)

Au (g/t)

Cu (%)

AgEq (g/t)

ZnEq (%)

Stormyrgruvan

Grab

Historic mine waste pile with

massive sulphide rich

boulders dominated by

pyrrhotite-sphalerite-galena-

chalcopyrite.

133.00

15.65

7.84

0.12

1.04

1,123.12

28.97

Boviksgruvan

Grab

Historic pit with weak

mineralization including

trace/disseminated pyrite-

chalcopyrite along main

foliation. Host rock is skarned

with some amphibole-

garnets.

7.90

0.14

0.02

0.11

0.77

101.61

2.62

Kompanigruvan

Grab

Massive sulphide rock with

galena and pyrite-pyrrhotite

disseminations/impregnations

and sphalerite.

54.70

11.95

4.73

0.04

0.10

694.09

17.90

Kompanigruvan

Chip

Contact between fine grained

felsic volcanic ash-chlorite

schist/talc-mineralized zone

impregnations of pyrite-

chalcopyrite-skarn after

limestone-marble.

Mineralization is at contact

with chlorite schist with

massive galena-sphalerite.

253.00

22.80

8.64

0.11

0.02

1,446.86

37.32

Koppargruvan

Grab

Multiple dumps and small

mine workings. Mainly

magnetite-pyrrhotite

dominated as semi-massive

or veins. Local boulder with

disseminated chalcopyrite

associated with massive

pyrrhotite-magnetite.

3.60

0.14

0.01

0.16

0.76

101.07

2.61

Hagfallsgruvan

Grab

Historic pit 4 m x 4 m with

significant galena and lesser

chalcopyrite in amphibole

skarn.

58.20

9.75

7.10

0.10

0.21

711.12

18.34

Martengasgruvan

Grab

Historic mine waste pile with

disseminated pyrrhotite-

chalcopyrite hosted by a

mafic rock with local garnets.

16.25

0.09

0.02

0.02

0.93

113.72

2.93

Notes:

Grab samples were recovered from mine dump piles, and chip samples were recovered from outcrop.

Rock grab samples are selective samples by nature and as such are not necessarily representative of the mineralization

hosted across the Property.

Metal prices used in USD for the AgEq and ZnEq calculations were based on Ag $15.00/oz, Au $1650/oz, Cu $2.15/lb, Zn

$0.85/lb, and Pb $0.75/lb.

AgEq equals = Ag g/t + (Au g/t × 110) + (Cu% × 98.286) + (Zn% × 38.857) + (Pb% × 34.286)

ZnEq = Zn% + (Ag g/t × 0.0257) + (Au g/t x 2.831) + (Cu% × 2.529) + (Pb% × 0.882)

The use of AgEq and ZnEq is for exploration purposes, and no adjustments were made for metal recovery.

Figure 2: Cross Section Facing Northeast at the Fäbodgruvan and Vilnäset Zones

2

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/7971/109509_af3a3d8fc46b4b3a_003full.jpg

References

1

Metal prices used in USD for the ZnEq calculation were based on Ag $15.00/oz, Au $1650/oz, Cu $2.15/lb, Zn $0.85/lb, and Pb $0.75/lb.

ZnEq

equals = Zn% + (Ag g/t × 0.0257) + (Au g/t x 2.831) + (Cu% × 2.529) + (Pb% × 0.882).

The use of ZnEq is for exploration purposes, and no

adjustments were made for metal recovery.

2

A. Fahlvik, 2018: Hydrothermal alteration and lithogeochemical marker units at the Svärdsjö Zn-Pb-Cu deposit, Bergslagen, Sweden, and their

implication for exploration.

Technical Information

All scientific and technical information in this news release has been prepared by, or approved by

Garrett Ainsworth, PGeo, President and CEO of the Company.

Mr. Ainsworth is a qualified person for

the purposes of National Instrument 43-101 -

Standards of Disclosure for Mineral Projects.

The grab and chip samples reported in this news release were recovered from mine dump piles and

outcrops, respectively.

A total of seven rock samples were transported to ALS Geochemistry in Malå,

Sweden for preparation, and subsequently pulps were sent to ALS Geochemistry in Ireland (an

accredited mineral analysis laboratory) for analysis.

Samples were analyzed using a multi-element ultra

trace method combining a four-acid digestion with ICP-MS analytical package ("ME-MS61"). Over limit

sample values were re-assayed for: (1) values of copper >1%; (2) values of zinc >1%; (3) values of lead

>1%; and (4) values of silver >100 g/t using the high-grade material ICP-AES analytical package ("ME-

OG62").

Additional over limit sample values were re-assayed for: (1) values of zinc >30%; (2) values of

lead >20% using the high precision analysis of base metal ores AAS analytical package ("Zn, Pb-

AAORE").

Gold, platinum, and palladium were analyzed using the 30 g lead fire assay with ICP-AES

finish analytical package ("PGM-ICP23"). Certified standards, blanks, and duplicates were inserted into

the sample shipment to ensure integrity of the assay process. Selected samples were chosen for

duplicate assay from the coarse reject and pulps of the original sample. No QA/QC issues were noted

with the results reported.

Some of the data disclosed in this news release is related to historical drilling results. District has not

undertaken any independent investigation of the sampling nor has it independently analyzed the results

of the historical exploration work in order to verify the results. District considers these historical drill

results relevant as the Company is using this data as a guide to plan exploration programs. The

Company's current and future exploration work includes verification of the historical data through drilling.

Mr. Ainsworth has not verified any of the information regarding any of the properties or projects referred

to herein other than the Svärdsjö Property. Mineralization on any other properties referred to herein is not

necessarily indicative of mineralization on the Svärdsjö Property.

About District Metals Corp.

District Metals Corp. is led by industry professionals with a track record of success in the mining

industry. The Company's mandate is to seek out, explore, and develop prospective mineral properties

through a disciplined science-based approach to create shareholder value and benefit other

stakeholders.

The advanced exploration stage Tomtebo Property is located in the Bergslagen Mining District of south-

central Sweden is the Company's main focus. Tomtebo comprises 5,144 ha and is situated between the

historic Falun Mine and Boliden's Garpenberg Mine that are located 25 km to the northwest and

southeast, respectively. Two historic polymetallic mines and numerous polymetallic showings are located

on the Tomtebo Property along an approximate 17 km trend that exhibits similar geology, structure,

alteration and VMS/SedEx style mineralization as other significant mines within the district.

Mineralization that is open at depth and along strike at the historic mines on the Tomtebo Property has

not been followed up on, and modern systematic exploration has never been conducted on the Property.

For further information on the Tomtebo Property, please see the technical report entitled "NI 43-101

Update Technical Report on the Tomtebo Project, Bergslagen Region of Sweden" dated effective

October 15, 2020 and amended and restated on February 26, 2021, which is available on SEDAR at

www.sedar.com

.

On Behalf of the Board of Directors

"

Garrett Ainsworth

"

President and Chief Executive Officer

(604) 288-4430

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

Cautionary Statement Regarding "Forward-Looking" Information.

This news release contains certain statements that may be considered "forward-looking information"

with respect to the Company within the meaning of applicable securities laws. In some cases, but not

necessarily in all cases, forward-looking information can be identified by the use of forward-looking

terminology such as "plans", "targets", "expects" or "does not expect", "is expected", "an opportunity

exists", "is positioned", "estimates", "intends", "assumes", "anticipates" or "does not anticipate" or

"believes", or variations of such words and phrases or statements that certain actions, events or

results "may", "could", "would", "might", "will" or "will be taken", "occur" or "be achieved" and any

similar expressions. In addition, any statements that refer to expectations, predictions, indications,

projections or other characterizations of future events or circumstances contain forward-looking

information. Statements containing forward-looking information are not historical facts but instead

represent management's expectations, estimates and projections regarding future events.

Forward-

looking statements in this news release relating to the Company include, among other things,

statements relating to the Company's planned exploration activities, including its drill target strategy

and next steps for the Tomtebo Property; the company's interpretations and expectations about the

mineralization of the Tomtebo Mine; the Company's belief that the numerous gravity high anomalies

identified at the historic Tomtebo Mine provide immense expansion potential; the Company's belief

that the modeled gravity high anomalies at the historic Tomtebo Mine could correspond with

polymetallic and/or iron sulphide mineralization, or a mafic unit; and the Company's belief that the

gravity high anomaly located one kilometer to the northeast of the Tomtebo Mine represents a

potential grassroots discovery opportunity with a modeled tonnage that compares with the historic

production tonnage from the historic Falun Mine.

These statements and other forward-looking information are based on opinions, assumptions and

estimates made by the Company in light of its experience and perception of historical trends, current

conditions and expected future developments, as well as other factors that the Company believes are

appropriate and reasonable in the circumstances, as of the date of this news release, including,

without limitation, assumptions about the reliability of historical data and the accuracy of publicly

reported information regarding past and historic mines in the Bergslagen district; the Company's

ability to raise sufficient capital to fund planned exploration activities, maintain corporate capacity and

satisfy the

exploration expenditure requirements required by the definitive purchase agreement

between the Company and the vendor of the Tomtebo Property (the "

Tomtebo Purchase

Agreement

") by the times specified therein; and stability in financial and capital markets.

Forward-looking information is necessarily based on a number of

opinions, assumptions and

estimates that, while considered reasonable by the Company as of the date such statements are

made, are subject to known and unknown risks, uncertainties, assumptions and other factors that may

cause the actual results, level of activity, performance or achievements to be materially different from

those expressed or implied by such forward-looking information, including but not limited to risks

associated with the following: the reliability of historic data regarding the Tomtebo Property; the

Company's ability to raise sufficient capital to finance planned exploration (including incurring

prescribed exploration expenditures required by the Tomtebo Purchase Agreement, failing which the

Tomtebo Property will be forfeited without any repayment of the purchase price); the Company's

limited operating history; the Company's negative operating cash flow and dependence on third-party

financing; the uncertainty of additional funding; the uncertainties associated with early stage

exploration activities including general economic, market and business conditions, the regulatory

process, failure to obtain necessary permits and approvals, technical issues, potential delays,

unexpected events and management's capacity to execute and implement its future plans; the

Company's ability to identify any mineral resources and mineral reserves; the substantial

expenditures required to establish mineral reserves through drilling and the estimation of mineral

reserves or mineral resources; the Company's dependence on one material project, the Tomtebo

Property; the uncertainty of estimates used to calculated mineralization figures; changes in

governmental regulations; compliance with applicable laws and regulations; competition for future

resource acquisitions and skilled industry personnel; reliance on key personnel; title matters; conflicts

of interest; environmental laws and regulations and associated risks, including climate change

legislation; land reclamation requirements; changes in government policies; volatility of the

Company's share price; the unlikelihood that shareholders will receive dividends from the Company;

potential future acquisitions and joint ventures; infrastructure risks; fluctuations in demand for, and

prices of gold, silver and copper; fluctuations in foreign currency exchange rates; legal proceedings

and the enforceability of judgments; going concern risk; risks related to the Company's information

technology systems and cyber-security risks; and risk related to the outbreak of epidemics or

pandemics or other health crises, including the recent outbreak of COVID-19. For additional

information regarding these risks, please see the Company's Annual Information Form, under the

heading "Risk Factors", which is available at

www.sedar.com

. These factors and assumptions are not

intended to represent a complete list of the factors and assumptions that could affect the Company.

These factors and assumptions, however, should be considered carefully. Although the Company has

attempted to identify factors that would cause actual actions, events or results to differ materially from

those disclosed in the forward-looking statements or information, there may be other factors that

cause actions, events or results not to be as anticipated, estimated or intended. Also, many of such

factors are beyond the control of the Company. Accordingly, readers should not place undue reliance

on forward-looking statements or information. The forward-looking information is made as of the date

of this news release, and the Company assumes no obligation to publicly update or revise such

forward-looking information, except as required by applicable securities laws. All scientific and

technical information contained in this news release has been prepared by or reviewed and approved

by Garrett Ainsworth, PGeo, President and CEO of the Company. Mr. Ainsworth is a qualified person

for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/109509