Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DMX.V ·

District Executes Agreement to Sell 80% of the Bakar Property on Northern Vancouver Island, British Columbia

Mergers & Acquisitions

918-1030 West Georgia Street, Vancouver, BC, V6E 2Y3

Telephone: 604-628-2669

District Executes Agreement to Sell 80% of the Bakar Property on

Northern Vancouver Island, British Columbia

Vancouver, B.C. August 18, 2020

August 18, 2020 – District Metals Corp. (TSX-V: DMX) (FRA: DFPP); ("District" or the

“Company”) is pleased to announce the execution of a definitive purchase agreement (the

“Agreement”) dated August 17, 2020 for District’s high grade copper -silver Bakar Property

(“Bakar” or the “Property” ) located on northern Vancouver Island in British Columbia with

Sherpa II Holdings Corp. (“Sherpa II”) (TSX-V: SHRP.P).

Transaction Highlights

Under the Agreement Sherpa II will acquire an 8 0% interest in the Bakar Property by cash

payment, the issuance of shares to District, and work expenditures, as described below. The cash

payment and common shares of Sherpa II will be transferred to District upon closing of the

transaction on or before September 17, 2020, and the work expenditures are scheduled to be

completed within six months from the closing.

• $50,000 cash payment.

• 1,000,000 common shares of Sherpa II.

• $200,000 in work expenditures.

• Carry over of the 2.0% NSR from the royalty agreement dated July 12, 2019 between

District and Longford Capital Corp . on one of the eight mineral claims that comprises

Bakar, which covers 1, 352 hectares (ha) out of the 15,687 ha Property. The 2.0% NSR

may be repurchased entirely for $6.5M.

Overview of the Bakar Property

The Bakar Property comprises 15,687 ha, and is located on northern Vancouver Island with

excellent access and infrastructure. The area covered by the Property is within a copper -rich

geological domain that hosts the past producing Island Copper Mine, the Hushamu Deposit, and

the Red Dog Deposit. The Island Copper Mine was operated by BHP from 1971 to 1995, and

produced 345 million metric tonnes of ore with average grades of 0.41% copper, 0.017%

molybdenum, 0.19 g/t gold and 1.4 g/t silver1.

The geological setting (i.e. within the sub-aerial Karmutsen volcanic and sedimentary sequence)

and high grade copper-silver mineralogy assemblages and styles observed at Bakar make the

918-1030 West Georgia Street, Vancouver, BC, V6E 2Y3

Telephone: 604-628-2669

primary exploration targets copper-silver redbed, copper-molybdenum-gold-silver porphyry, and

polymetallic skarn deposits.

Seven outcrop chip samples from December 2018 recovered at the Millington showing on Bakar

returned high grade copper (0.01 to 38.7% Cu) and silver (<0.10 to 221.0 g/t Ag) values

confirming the presence of redbed-type mineralization. Additionally, disseminated, stringer, and

fracture-hosted sulphide mineralization (chalcocite, bornite, and chalcopyrite) was observed to

emanate from high grade copper -silver lenses and veins hosted within a stratabound volcanic

sequence with an apparent thickness of over 30 m and a northwest-southeast strike length of over

200 m (see news release dated May 2, 2019).

A helicopter-borne VTEM (versatile time-domain electromagnetic) survey was flown over much

of Bakar in May 2019, which identified three targets zones for potential copper-silver redbed

mineralization based on coincident magnetic and conductive signatures that remain undrilled (see

news release September 19, 2019).

Geological m apping and geochemical sampling w ere completed during the summer of 2019,

which was largely focused on the Millington showing. Channel sampling was highlighted by

BK19-C04 that returned 10.0 m at 4.92% Cu and 27.7 g/t Ag along the strike of a mineralized

stratabound horizon with an approximate true thickness of at least 2.75 m. Stream sediment and

soil sampling also showed positive results that require follow up (see news release October 7,

2019).

Exploration fieldwork planning is well underway for B akar as part of the required transaction

work expenditures, and further information will be released in due course.

References

1 Perelló, J., Fleming, J.A., O’Kane, K.P., Burt, P.D., Clarke, G.A., Himes, M.D., and Reeves,

A.T., (1995): Porphyry Copper -Gold-Molybdenum Deposits in the Island Copper Cluster,

Northern Vancouver Island, British Columbia, Porphyry Deposits of the Northwest Cordillera of

North America, CIM Special Volume 46, pp. 214-238..

Technical Information

All scientific and technical information in this news release has been prepared by, or approved by

Garrett Ainsworth, PGeo, President and CEO of the Company. Mr. Ainsworth is a qualified

person for the purposes of National Instrument 43 -101 - Standards of Disclosure for Min eral

Projects.

Mr. Ainsworth has not verified any of the information regarding any of the properties or projects

referred to herein other than the Bakar Property and mineralization at those other properties or

projects is not necessarily indicative of mineralization on the Bakar Property.

About District Metals Corp.

918-1030 West Georgia Street, Vancouver, BC, V6E 2Y3

Telephone: 604-628-2669

District Metals Corp. is led by industry professionals with a track record of success in the mining

industry. The Company’s mandate is to seek out, explore, and develop prosp ective mineral

properties through a disciplined science -based approach to create shareholder value and benefit

other stakeholders.

The advanced exploration stage Tomtebo Property is located in the Bergslagen Mining District

of south -central Sweden is the Company’s main focus. Tomtebo comprises 5,144 ha, and is

situated between the historic Falun Mine and Boliden’s Garpenberg Mine that are located 25 km

to the northwest and southeast, respectively. Two historic polymetallic mines and numerous

polymetallic showings are located on the Tomtebo Property along an approximate 17 km trend

that exhibits similar geology, structure, alteration and VMS/SedEx style mineralization as other

significant mines within the district. Mineralization that is open at depth and al ong strike at the

historic mines on the Tomtebo Property has not been followed up on, and modern systematic

exploration has never been conducted on the Property.

On Behalf of the Board of Directors

“Garrett Ainsworth”

President and Chief Executive Officer

(604) 288-4430

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding “Forward-Looking” Information.

This news release contains certain statements that may be considered “forward -looking statements” within the meaning of

applicable securities laws. In some cases, but not necessarily in all cases, forward -looking information can be identified by the

use of forward-looking terminology such as “plans”, “targets”, “expects” or “does not expect”, “is expected”, “an opportunity

exists”, “is positioned”, “estimates”, “intends”, “assumes”, “anticipates” or “does not anticipate” or “believes”, or variations

of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might”, “will” or “will be

taken”, “occur” or “be achieved” and other similar expressions. In addition, statements in this news releas e that not historical

facts are forward looking statements including statements regarding completion of the proposed transaction.

These statements and other forward-looking information are based on assumptions and estimates that the Company believes are

appropriate and reasonable in the circumstances, including, without limitation, assumptions about the satisfaction of any

conditions to closing including receipt of regulatory approvals, s.

There can be no assurance that such statements will prove to be accurate and actual results, and future events could differ

materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from

the Company's expectations include; the risk that the proposed transaction is not completed for any reason. The Company does

not undertake to update or revise any forward -looking statements, except in accordance with applicable law. Readers are

cautioned not to put undue reliance on these forward-looking statements.