Denison Reports Results from Q3 2018

Corporate Updates

1

Denison Mines Corp.

1100 – 40 University Ave

Toronto, ON M5J 1T1

www.denisonmines.com

PRESS RELEASE

DENISON REPORTS RESULTS FROM Q3 2018

Toronto, ON – November 12, 2018. Denison Mines Corp. (“Denison” or the “Company”) (DML: TSX, DNN: NYSE

American) filed its Consolidated Financial Statements and Management’s Discussion & Analysis (“MD&A”) for the

quarter ended September 30, 2018 . Both documents can be found on the Company’s website at

www.denisonmines.com or on SEDAR (at www.sedar.com) and EDGAR (at www.sec.gov/edgar.shtml). The highlights

provided below are derived from these documents and should be read in conjunction with them. All amounts in this

release are in Canadian dollars unless otherwise stated.

David Cates, President and CEO of Denison commented , “The Company’s activities during the third quarter of 2018

have served to remind investors why Denison is such a unique uranium investment case. Developments from the

quarter were highlighted by exceptional results from the completion of the Wheeler River PFS, including an estimated

operating cost of US$3.33/lb U3O8 from the high-grade Phoenix deposit – representing nearly a 90% operating margin

at the current spot price of uranium. The PFS also features comparatively very low initial capital costs, for an Athabasca

Basin development project, with only ~$290 million attributable to Denison’s recently consolidated 90% interest in the

project. In addition to the results from the Wheeler River PFS, the Company also delive red exciting results on the

exploration side – discovering a new area of uranium and base metals mineralization on the K West trend on the

Wheeler River property (approximately 500 metres west of the parallel K North trend, which hosts the Gryphon deposit),

and a new area of uranium mineralization on the Waterbury Lake property, at the interpreted intersection of the GB

trend and the Midwest regional structure.

As the uranium market continues to recover, Denison intends to continue to position itself as a ‘must own’ stock, offering

investors a unique combination of exposure to both the future development of Wheeler River, an exceptionally low-cost

and large -scale uranium mining operation, and discovery success across a diverse portfolio of highly prospect ive

exploration properties.”

PERFORMANCE HIGHLIGHTS

▪ Wheeler River Pre-Feasibility Study (‘PFS’) returns project level pre-tax NPV of $1.31 billion and IRR of 38.7%

On September 24, 2018, Denison released the results of the PFS for its flagship Wheeler River uranium project

(‘Wheeler River’) in northern Saskatchewan. The PFS has been completed in accordance with NI 43 -101 and is

highlighted by the selection of the in-situ recovery (‘ISR’) mining method for the development of the Phoenix deposit,

with an estimated average operating cost of $4.33 (US$3.33) per pound U 3O8. The project, on a 100% basis, is

estimated to have mine production of 109.4 million pounds U 3O8 over a 14-year mine life, with a base case pre -tax

Net Present Value (‘NPV’) of $1.31 billion (8% discount rate), Internal Rate of Return (‘IRR’) of 38.7%, and initial pre-

production capital expenditures of $322.5 million. The complete technical report, supporting the disclosure of the

PFS results on September 24, 2018, was made available on Denison’s website as well as SEDAR and EDGAR on

October 30, 2018.

▪ Acquisition of additional Wheeler River ownership interest

On October 29, 2018, Denison announced that it completed a transaction with Cameco Corporation (‘Cameco’) to

increase its ownersh ip interest in the Wheeler River Joint Venture (‘WRJV’) to 90%. Denison acquired Cameco's

approximately 24% interest in the project in exchange for the issuance of 24,615,000 common shares of Denison.

▪ Discovery of unconformity uranium and base metals on the K West trend at Wheeler River

Highlights from the Company’s summer 2018 diamond drilling program at Wheeler River include the discovery of

unconformity-hosted mineralization on the K West trend, including 0.30% U 3O8, 4.7% Co, 3.7% Ni and 0.55% Cu

from 651.1 to 652.1 metres in drill hole WR -733D1 and 1.2% Cu and 0.49% Ni from 636.6 to 642.6 m etres in drill

hole WR-733D2. The K West trend is a priority target area located approximately 500 metres west of the parallel K

North trend, which hosts the Gryphon deposit. The results are associated with significant structure and alteration in

the overlying sandstone, as well as elevated uranium values (averaging 17 ppm uranium) extending up to 100 metres

above the unconformity. The results are encouraging and fu rther drill testing is warranted to the south, where up to

five kilometres of strike length remains untested along the K West trend.

2

▪ Exploration success at Waterbury Lake with the discovery of uranium mineralization on the GB Trend

On September 17, 2018, Denison reported the discovery of uranium mineralization on the Company’s 65.92% owned

Waterbury Lake project. Basement-hosted uranium mineralization was intersected in two drill holes on the GB trend,

approximately three kilometres northeast of the project’s Huskie zone, including mineralized assay intervals of 0.43%

U3O8 over 1.0 metre (including 0.73% U3O8 over 0.5 metre) in drill hole WAT18-478 and 0.45% U3O8 over 0.5 metre,

as well as 0.31% U3O8 over 0.5 metre and 0.20% U3O8 over 0.5 metre in drill hole WAT18-479. The results validate

the Company’s geological concept that uranium mineralization occurs at the intersection of the interpreted regional

Midwest structure with cross-cutting, graphite-bearing, structural corridors on the Waterbury Lake project.

▪ Maiden mineral resource estimate completed for the Huskie deposit at Waterbury Lake

Denison completed a maiden mineral resource estimate for the Huskie basement -hosted uranium deposit in

accordance with NI 43 -101 and CIM Definitions (2014), which was reviewed and audited by SRK Consulting

(Canada) Inc. (‘SRK’). Since its discovery in 2017 , Denison has completed 28 drill holes at Huskie at a spacing of

approximately 50 metres x 50 metres to define the deposit over a strike length of approximately 210 metres and dip

length of up to 215 metres. The deposit has been interpreted to include three parallel, stacked lenses of mineralization

(Huskie 1, Huskie 2 and Huskie 3) which vary in true thickness between approximately 1 and 7 metres. The result of

the 2017 and 2018 drilling campaigns at Huskie is an inferred mineral resource estimate of 5.7 m illion pounds of

U3O8 (above a cut-off grade of 0.1% U3O8) based on 268 thousand tonnes of mineralization at an average grade of

0.96% U3O8. The effective date of the resource estimate is October 17, 2018.

SELECTED QUARTERLY FINANCIAL INFORMATION

(in thousands, except for per share amounts) Q3 2018 Q3 2017

Total revenues $ 3,729 $ 3,753

Net loss $ (3,884) $ (7,627)

Basic and diluted loss per share $ (0.01) $ (0.01)

(in thousands)

As at

September 30,

2018

As at

December 31,

2017

Financial Position:

Cash and cash equivalents $ 21,470 $ 3,636

Investments in debt instruments (GICs) $ - $ 37,807

Cash, cash equivalents and GICs $ 21,470 $ 41,443

Working capital $ 22,345 $ 38,065

Property, plant and equipment $ 247,003 $ 249,002

Total assets $ 302,269 $ 326,300

Total long-term liabilities(1) $ 80,055 $ 84,252

(1) Predominantly comprised of the non-current portion of deferred revenue, non-current reclamation obligations, and deferred income taxes.

RESULTS OF CONTINUING OPERATIONS

Revenues

During Q3 2018, the McClean Lake mill processed 2.9 million pounds U3O8 for the Cigar Lake Joint Venture (‘CLJV’).

The Company recorded toll milling revenue of $755,000 and related accretion expense of $829,000.

Revenue from the Company’s DES division was $2,365,000 and revenue from the Company’s management contract

with UPC was $609,000 during Q3 2018.

Effective January 1, 2018, upon adoption of IFRS 15, the accounting policy applicable to the Company’s toll milling

deferred revenue arrangement with Anglo Pacific Group PLC (the ‘APG Transaction’) has changed and the comparative

period has been restated to reflect this change. Refer to the Company’s unaudited interim consolidated financial

statements and related notes for more details on the accounting for the APG Transaction related revenue.

3

Operating expenses

Operating expenses in the Canadian mining segment include depreciation, mining and other development costs, as

well as adjustments, where applicable, to the estimates of future reclamation costs in relation to the companies mining

properties. O perating expenses during Q3 2018 were $2,141,000, including $529,000 of depreciation from the

McClean Lake mill, which is associated with the processing and packaging of U3O8 for the CLJV. Operating expenses

include development and other operating costs related to the McClean Lake Joint Venture (‘ MLJV’) of $1,610,000.

These costs predominantly relate to the advancement of the Surface Access Borehole Resource Extraction (‘SABRE’)

mining technology, as part of a multi-year test mining program operated by Orano Canada within the MLJV. During the

current quarter, drilling and casing of four access holes was successfully completed into the McClean North deposit .

The holes were drilled from surface to the top of the orebody and will allow for mining of the orebody beneath the holes

during the latter stages of the test mining program. All holes were within the specifications required in terms of deviation,

size and depth.

Operating expenses at DES during Q3 2018 totaled $2,051,000 and relate primarily to care and maintenance , and

environmental consulting services provided to clients, and includes labour and other costs.

Exploration and evaluation

During Q3 2018, the Company continued to f ocus on its highest priority projects in the Athabasca Basin region in

Saskatchewan. Denison’s share of exploration and evaluation expenditures in the quarter was $3,894,000. The

Company’s Athabasca land package decreased during the third quarter from 356,713 hectares (305 claims) to 320,166

hectares (292 claims), primarily due to Skyharbour Resources Ltd. completing its option to acquire 100% of the Moore

Lake project, which accounted for 35,705 hectares (12 claims).

Wheeler River

Project Highlights:

▪ PFS results produce a pre-tax NPV of 2.75 times the 2016 preliminary economic analysis (‘2016 PEA’)

On September 24, 2018, the Company announced the results of the PFS for Wheeler River. On October 30, 2018,

Denison filed the technical report for the PFS titled ‘Pre-feasibility Study Report for the Wheeler River Uranium Project,

Saskatchewan, Canada’ prepared by Mark Liskowich, P.Geo. of SRK Consulting (Canada) Inc. with an effective date

of September 24, 2018 (the “PFS Technical Report”).

The PFS was completed in accordance with National Instrument 43-101 and is highlighted by the selection of the ISR

mining method for the development of the Phoenix deposit, with an estimated average operating cost of $4.33

(US$3.33) per pound U3O8.

The PFS considers the potential economic merit of co-developing the Phoenix and Gryphon deposits. The high-grade

Phoenix deposit is designed as an ISR mining operation, with associated processing to a finished product occurring at

a plant to be built on site at Wheeler River. The Gryphon deposit is designed as an underground mining operation,

utilizing a conventional long h ole mining approach with processing of mine production assumed at Denison’s 22.5%

owned McClean Lake mill. Taken together, the project is estimated to have mine production of 109.4 million pounds

U3O8 over a 14 -year mine life, with a base case pre -tax NPV of $1.31 billion (8% discount rate), IRR of 38.7%, and

initial pre-production capital expenditures of $322.5 million.

The base-case economic analysis assumes uranium sales are made at UxC Consulting Company, LLC’s (‘UxC’) annual

estimated spot price (composite mid-point scenario in constant dollars) for mine production from the Phoenix deposit

(from ~US$29/lb U 3O8 to US$45/lb U 3O8), and a fixed price for mine production from the Gryphon deposit (US$50/lb

U3O8).

Using the same price assumed for the project’s 2016 PEA, a fixed uranium price of US$44/lb U3O8, the PFS produces

a combined pre-tax project NPV of $1.41 billion – representing roughly 2.75 times the $513 million pre-tax project NPV

estimated in the 2016 PEA.

The PFS was prepared on a projec t (100% ownership) and pre -tax basis. Denison completed an indicative post -tax

assessment based on a 90% ownership interest, yielding a base case post-tax NPV of $755.9 million and post-tax IRR

of 32.7%, with initial capital costs to Denison of $290.3 million.

▪ The largest undeveloped uranium project in the eastern Athabasca Basin

With the completion of the PFS and in accordance with NI 43-101 standards, the Company has declared the following

mineral reserves and resources (see the PFS Technical Report for further details).

4

 Probable Mineral Reserves of 109.4 million pounds U 3O8 (Phoenix 59.7 million pounds U 3O8 from 141,000

tonnes at 19.1% U3O8; Gryphon 49.7 million pounds U3O8 from 1,257,000 tonnes at 1.8% U3O8);

 Indicated Mineral Resources (inclusive of Reserves) of 132.1 million pounds U 3O8 (1,809,000 tonnes at an

average grade of 3.3% U3O8); plus

 Inferred Mineral Resources of 3.0 million pounds U3O8 (82,000 tonnes at an average grade of 1.7% U3O8).

▪ Potential for resource growth

Very little regional exploration has taken place on the property in recent years, with drilling efforts focussed on Phoenix

and Gryphon, which were discovered in 2008 and 2014 respectively. The property is host to numerous uranium-bearing

lithostructural corridors whi ch are under - or unexplored and have the potential for additional large, high -grade

unconformity or basement hosted deposits. Exploration drilling is warranted along these corridors to follow -up on

previous mineralized drill results, or to test geophysical targets identified from past surveys.

Evaluation Program:

During Q3 2018, Denison’s share of evaluation costs at Wheeler River amounted to $797 ,000, which related to

completion of the PFS and continued environmental and sustainability activities.

During Q3 2018, the Company continued with the community consultation and engagement process as well as

environmental baseline data collection activities. Additional environmental baseline data is being collected in key areas

to better characterize the existing environment in the project area. This data will form the foundation of the

environmental impact assessment for the project. The information will also be used in the design of various aspects of

the project, including the location and layout of site infrastructure, the location for treated effluent discharge and fresh

water intake, and the designs of water treatment plants, waste storage facilities, and other infrastructure interacting

with the environment. Programs in progress and/or completed during the quarter included a range of studies related to

the aquatic environment, terrestrial environment, atmospheric environment, and waste rock geochemistry.

Exploration Program:

Denison’s share of exploration cost s at Wheeler River amo unted to $2,058 ,000 during Q3 2018. The summer 2018

diamond drilling program for Wheeler River commenced in early June 2018 and was completed in late August 2018.

The program included 18,402 metres in 31 drill holes and was largely focused on testing regional target areas (outside

of the immediate Gryphon and Phoenix deposit areas) across the Wheeler River property.

K West

The summer 2018 drilling program, which included 3,222 metres in 5 drill holes in this area, was designed to test the

K West fault zone at the sub-Athabasca unconformity on the northern portion of the trend. Highlight results include the

intersection of uranium and base -metal mineralization at the unconformity, including 0.30% U3O8, 4.7% Co, 3.7% Ni

and 0.55% Cu from 651.1 to 652.1 metres in drill hole WR-733D1, and 1.2% Cu and 0.49% Ni from 636.6 to 642.6 m

in drill hole WR-733D2. The results are associated with significant structure and alteration in the overlying sandstone,

as well as elevated uranium values, averaging 17 ppm uranium, extending up to 100 metres above the unconformity.

Further drilling is warranted to test this target horizon to the south, where up to five kilometres of strike length remains

untested along the K West trend. Refer to the MD&A for further information.

K North

The summer 2018 program, which included 3,003 metres in five drill holes in this area, was designed to extend the

unconformity mineralization, identified during the winter 2018 drill program, on section and along strike on 200 metre -

spaced drill fences. Mineralization was intersected 600 metres northeast of Gryphon including 0.15% U 3O8 over 1.0

metre in drill hole WR -704D1. Further potential for mineralization exists, both at the unconformity and within the

basement, between the 200 metre-spaced drill fences.

Q Central, Q South, K South

Regional exploration drilling was undertaken at Q Central (2,547 metre s in five drill holes), Q South (3, 306 metres in

six drill holes) and at K South (2, 370 metres in four drill holes) to test geological and geophysical targets on a

reconnaissance scale. Favourable geology, structure, alteration and anomalous geochemistry was encountered in all

the target areas and follow-up will be planned based on a more detailed assessment of geochemical, spectral clay and

structural data.

5

Gryphon Unconformity

A total of 3,954 metres of exploration drilling in six drill holes was completed to test unconformity targets to the

southwest and northeast of the Gryphon deposit. To the southwest of Gryphon , five holes were completed to test for

unconformity mineralization along the Basal Fault at the up plunge projection of the D series lenses. Results included

the intersection of mineralization, in drill hole WR -722D1 (0.13 % U3O8 over 1.5 metres), immediat ely below the

unconformity. The continuity of significant sandstone structure and strong hydrothermal alteration over the 500 metres

of strike length tested suggests further potential for unconformity mineralization associated with the Basal Fault. This

target horizon is wide-open to the southwest and a priority target exists a further 400 metres to the southwest where

previous drilling returned weak basement mineralization along the Basal Fault and 4.5% U3O8 over 4.5 metres (drill

hole WR-597) at the intersection of the unconformity with the G-Fault.

Exploration Pipeline Properties

While spending on exploration pipeline projects has been reduced from prior year levels, exploration activities continue

to deliver encouraging results generally warranting follow-up.

During the 2018 summer season, Denison carried out exploration programs at Waterbury Lake, Hook-Carter and South

Dufferin. Results from the Hook-Carter and South Dufferin drilling programs were reported with the Company’s financial

results for the second quarter of 2018.

The summer/fall program at Waterbury Lake included a diamond drilling program and a DCIP resistivity survey – with

the highlight being the discovery of new uranium mineralization at the interpreted intersection of the GB trend with the

regional Midwest structure, roughly 3 kilometres to the northeast of the Huskie deposit. Mineralized assay results from

the GB trend discovery included intervals of 0.43% U3O8 over 1.0 metre (including 0.73% U3O8 over 0.5 metre) in drill

hole WAT18-478 and 0.45% U 3O8 over 0.5 metre , as well as 0.31% U 3O8 over 0.5 metre and 0.20% U 3O8 over 0.5

metre in drill hole WAT18 -479. The results vali date the Company’s geological concept that uranium mineralization

occurs at the intersection of the interpreted regional Midwest structure with cross -cutting, graphite-bearing, structural

corridors on the Waterbury Lake project.

In addition, a maiden mine ral resource estimate for the Huskie deposit, located on the Waterbury Lake project, was

completed with an effective date of October 17, 2018 . Refer to Denison’s MD&A filed on November 9, 2018 for more

details.

At McClean Lake, a DCIP resistivity surveyin g was completed by Orano Canada, and a diamond drilling program

commenced in early October 2018.

General and administrative expenses

Total general and administrative expenses were $1,657,000 during Q3 2018. These costs are mainly comprised of

head office salaries and benefits, office costs in multiple locations, audit and regulatory costs, legal fees, investor

relations expenses, project costs, and all other costs related to operating a public company with listings in Canada and

the United States, as well as non-recurring project or legal costs.

Other income and expenses

During Q3 2018, the Company recognized a gain of $664 ,000 in other income . The gain is predominantly due to net

gains on investments carried at fair value.

Equity share of income from associates

During Q3 2018, the Company recognized a gain of $639,000 from its 16.49% equity share of its associat e GoviEx

Uranium Inc. (‘GoviEx’), owing largely to an equity gain based on the Company’s share of GoviEx’s net gain during the

period as well as a dilution gain as a result of other shareholders’ exercise of GoviEx share warrants.

Liquidity and capital resources

Cash and cash equivalents were $21,470,000 at September 30, 2018.

On November 2, 2018, the Company announced it had entered into an agreement with Cantor Fitzgerald Canada

Corporation, as a sole bookrunner and lead underwriter, on behalf of a syndicate of underwriters (together, the

‘Underwriters’), under which the Underwriters have agreed to purchase, on a ‘bought deal ’ private placement basis,

4,950,495 common shares on a flow-through basis (the ‘Flow-Through Shares’) at a price of $1.01 per share for total

gross proceeds of approximately $5,000,00. The Company also granted the Underwriters an option to increase the

6

gross proceeds of the Offering by up to 10% (the ‘Underwriters’ Option’), exercisable in whole or in part at any time up

to two business days prior to the closing date, which is expected to occur on or about November 23, 2018.

Outlook for 2018

Refer to the Company’s annual MD&A for the year ended December 31, 2017 for a detailed discussion of the previously

disclosed 2018 budget.

During the current quarter, the Company has decreased its 2018 outlook for development and operations expense by

$600,000, primarily because of a reduction in planned MLJV expenditures related to the advancement of the SABRE

mining method. The Company also increased its 2018 outlook for management services fees from UPC by $ 100,000,

primarily due to an increase in estim ated NAV-based management fees in order to reflect increased uranium spot

prices.

ABOUT DENISON

Denison was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces. Denison’s common

shares are listed on the Toronto Stock Exchange (the ‘TSX’) under the symbol ‘DML’ and on the NYSE American

exchange (formerly ‘NYSE American’) under the symbol ‘DNN’.

Denison is a uranium exploration and development company with interest s focused in the Athabasca Basin region of

northern Saskatchewan, Canada. In addition to its 90% owned Wheeler River project, which hosts the high grade

Phoenix and Gryphon uranium deposits, Denison's exploration portfolio consists of numerous projects covering

approximately 320,000 hectares in the Athabasca Basin region . Denison's interests in Saskatchewan also include a

22.5% ownership interest in the McClean Lake joint venture (‘MLJV’), which includes several uranium deposits and the

McClean Lake uranium mill, which is currently processing ore from the Cigar Lake mine under a toll milling agreement,

plus a 25.17% interest in the Midwest deposit and a 65.92% interest in the J Zone and Huskie deposits on the Waterbury

Lake property. The Midwest, J Zone and Huskie deposits are located within 20 kilometres of the McClean Lake mill.

Denison is engaged in mine decommissioning and environmental services through its Denison Environmental Services

(‘DES’) division, which manages Denison’s Elliot Lake reclamation projects and provides post -closure mine care and

maintenance services as well as environmental consulting services to a variety of industry and government clients.

Denison is also the manager of Uranium Participation Corporation (‘UPC’), a publicly traded company listed on the TSX

under the symbol ‘U’, which invests in uranium oxide in concentrates (‘U3O8’) and uranium hexafluoride (‘UF6’).

Qualified Persons

The disclosure regarding the estimated Mineral Reserves, 2016 PEA, PFS, and environmental and sustainability

activities for the Wheeler River project was reviewed and approved by Peter Longo, P. Eng, MBA, PMP, Denison’s

Vice-President, and Project Development, who is a Qualified Person in accordance with the requirements of NI 43-101.

The balance of the disclosure of scientific and technical information regarding Denison’s properties in this news release,

including estimated Mineral Resources, was prepared or approved by Dale Verran, MSc, P. Geo, Pr.Sci.Nat., the

Company’s Vice President, Exploration, a Qualified Person in accordance with the requirements of NI 43 -101. For a

description of Denison’s assay procedures, downhole gamma probe procedures, and the quality assurance program

and quality control measures applied by Denison, please see Denison’s Annual Information Form dated March 27,

2018 available under Denison's profile on SEDAR at www.sedar.com, and its Form 40 -F available on EDGAR at

www.sec.gov/edgar.shtml.

For more information, please contact

David Cates (416) 979 – 1991 ext 362

President and Chief Executive Officer

Sophia Shane (604) 689 - 7842

Investor Relations

Follow Denison on Twitter @DenisonMinesCo

7

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS

Certain information contained in this news release constitutes ‘forward-looking information’, within the meaning of the United States

Private Securities Litigation Reform Act of 1995 and similar Canadian legislation c oncerning the business, operations and financial

performance and condition of Denison.

Generally, these forward-looking statements can be identified by the use of forward -looking terminology such as ‘plans’, ‘expects’,

‘budget’, ‘target’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’, or ‘believes’, or the negatives and/or variations of such

words and phrases, or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’, ‘be achieved’

or ‘has the potential’.

In particular, this news release contains forward-looking information pertaining to the following: the benefits to be derived from

corporate transactions; the estimates of Denison's mineral reserves and mineral resources , including th e new mineral resource

estimate for the Huskie deposit; exploration, development and expansion plans and objectives, including the results of the PFS, and

statements regarding anticipated budgets, fees and expenditures; expectations regarding Denison’s joint venture ownership interests

and the continuity of its agreements with its partners; expectations regarding adding to its mineral reserves and resources t hrough

acquisitions or exploration; expectations regarding the toll milling of Cigar Lake ores; expe ctations regarding revenues and

expenditures from operations at DES; expectations regarding revenues from the UPC management contract; and the annual operating

budget and capital expenditure programs, estimated exploration and development expenditures and reclamation costs and Denison's

share of same. Statements relating to ‘mineral reserves’ or ‘mineral resources’ are deemed to be forward-looking information, as they

involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources

described can be profitably produced in the future.

Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and

they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of acti vity,

performance or achievem ents of Denison to be materially different from those expressed or implied by such forward -looking

statements. Denison believes that the expectations reflected in this forward-looking information are reasonable but no assurance can

be given that these expe ctations will prove to be accurate and may differ materially from those anticipated in this forward looking

information. For a discussion in respect of risks and other factors that could influence forward -looking events, please refer to the

factors discussed in Denison’s Annual Information Form dated March 27, 2018 under the heading ‘Risk Factors’. These factors are

not, and should not be construed as being exhaustive.

Accordingly, readers should not place undue reliance on forward -looking statements. This cautionary statement expressly qualifies

the forward-looking information contained in this news release . Any forward-looking information and the assumptions made with

respect thereto speaks only as of the date of this news release. Denison does not undertake any obligation to publicly update or revise

any forward-looking information after the date of this news release to conform such information to actual results or to changes in

Denison's expectations except as otherwise required by applicable legislation.

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Mineral Resources

and Probable Mineral Reserves : This news release may use the terms ‘measured’, ‘indicated’ and ‘inferred’ mineral r esources.

United States investors are advised that while such terms have been prepared in accordance with the definition standards on mineral

reserves of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43 -101 Mineral

Disclosure Standards (“NI 43 -101”) and are recognized and required by Canadian regulations, the United States Securities and

Exchange Commission (“SEC”) does not recognize them. ‘Inferred mineral resources’ have a great amount of uncertainty as to their

existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will

ever be upgraded to a higher category . Under Canadian rules, estimates of inferred mineral resources may not form the basis of

feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or

indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to

assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable . The estimates of

mineral reserves in this press release have been prepared in accordance with 43 -101. The definition of probable mineral reserves

used in NI 43 -101 differs from the definition used by the SEC in the SEC’s Industry Guide 7. Under the requirements of the SEC,

mineralization may not be classified as a "reserve" unless the determination h as been made , pursuant to a “ final" or "bankable"

feasibility study that the mineralization could be economically and legally produced or extracted at the time the reserve determination

is made. Accordingly, Denison’s probable mineral reserves disclosure may not be comparable to information from U.S. companies

subject to the reporting and disclosure requirements of the SEC.