Denison Extends High-Grade Unconformity Mineralization Near the Gryphon Deposit with 4.3% EU 3O8 over 4.3 Metres and Completes Summer Drilling at Wheeler
Denison Mines Corp.
1100 – 40 University Ave
Toronto, ON M5J 1T1
www.denisonmines.com
@DenisonMinesCo
PRESS RELEASE
DENISON EXTENDS HIGH-GRADE UNCONFORMITY MINERALIZATION
NEAR THE GRYPHON DEPOSIT WITH 4.3% eU 3O8 OVER 4.3 METRES
AND COMPLETES SUMMER DRILLING AT WHEELER
Toronto, ON – November 2, 2017 Denison Mines Corp. (“Denison” or the “Company”) (TSX: DML) (NYSE
MKT: DNN) (NYSE American: DNN) is pleased to report the extension of new high-grade unconformity-
hosted uranium mineralization located up-dip and ap proximately 250 metres along strike to the northeas t
of the basement-hosted Gryphon deposit, on the Comp any’s 60% owned Wheeler River project.
Preliminary radiometric equivalent grades (“eU 3O8”) from drill hole WR-670D2 are highlighted by an interval
of 4.3% eU 3O8 over 4.3 metres, from mineralization occurring imm ediately above the sub-Athabasca
unconformity. This result adds to previous unconfor mity mineralized intercepts that include 5.0% eU 3O8
over 4.7 metres in drill hole WR-689D3 and 1.2% eU 3O8 over 1.4 metres in drill hole WR-690D3 (see
Denison’s press release dated August 30, 2017). The new zone of “E series” unconformity mineralization
now extends approximately 80 metres horizontally al ong the unconformity and remains open along strike
to the northeast and southwest.
In addition, after nearly six months of field activ ities, Denison is pleased to report that the summer 2017
drilling program at Wheeler River has now been conc luded, following the completion of a further 30 dri ll
holes totalling 12,466 metres. Preliminary radiome tric grades for these results are reported herein a nd
represent a strong finish, to an extended summer ex ploration program at Wheeler, with continued
exploration success on multiple fronts. Importantly, these results also represent the final batch of drill holes
to be completed ahead of the planned update to the Company’s resource estimate for the Gryphon deposit
and the Wheeler River project.
Highlights from the final 30 drill holes include:
• Extension of the E series lenses: Additional mineralized intervals in the E series lenses were returned
at the unconformity in drill hole WR-670D2 (4.3% eU3O8 over 4.3 metres) and WR-657D3 (0.86% eU 3O8
over 2.2 metres), as well as in the upper basement in drill hole WR-646D2 (4.6% eU 3O8 over 1.5 metres)
and WR-646D4 (1.1% eU 3O8 over 7.6 metres). The E series lenses occur outsid e of the current
resources estimated for the Gryphon deposit, remain open along strike to the northeast and southwest,
and now have an unconformity and upper basement extent of 80 and 350 metres, respectively.
• Continued expansion of high-grade within the D seri es lenses: Intersections of 4.9% eU 3O8 over
1.0 metre (drill hole WR-621D5), 1.6% eU 3O8 over 2.5 metres (drill hole WR-657D2), and 2.0% eU 3O8
over 1.3 metres (drill hole WR-657D3), have added t o several previous high-grade results within the D
series lenses. During the summer program, a signif icant lens of high-grade mineralization has been
delineated amongst the D series lenses by infill drilling on an approximate 25 x 25 metres spacing. The
high-grade lens measures up to 150 metres along str ike, approximately 240 metres along dip, with
interpreted true thicknesses between approximately 2 and 20 metres. All D series lens mineralization
occurs outside of the current resources estimated for the Gryphon deposit.
• Continued expansion of the A and B series lenses: Drill holes located down-dip and up-dip of the
extent of the A and B series lenses, as defined by the current resources estimated for the Gryphon
deposit, returned highlight intersections of 4.0% e U 3O8 over 3.1 metres (drill hole WR-681AD3) and
4.0% eU 3O8 over 5.2 metres (drill hole WR-624D3). The holes w ere located approximately 25 metres
from previous holes with the potential to add indicated resources to the Gryphon deposit.
2
• Completion of the definition drilling program: Definition drilling designed to upgrade the current
inferred resources of the Gryphon deposit (A, B and C series lenses) to an indicated level of confidence
has now been completed with the final four drill holes, of the 42 drill hole program, successfully reaching
their respective targets. Results continue to show good consistency with the inferred grade model.
Dale Verran, Denison’s Vice President Exploration, commented, “The summer drilling program at Wheeler
River has produced exceptional results with over 90 % of the holes completed returning significant
mineralization. The sheer number of high-grade and thick intersections, inside and outside the current
Gryphon resource area, indicate potential to increa se both the confidence and size of the Gryphon
deposit. An updated independent resource estimate, in accordance with NI 43-101, is planned for later
this year once the final batch of assay results is received. Looking ahead to 2018, our exploration te am
is excited to continue with exploration near Grypho n. The mineralizing system continues to impress as
new zones continue to be added – most recently with the E series lenses. The deposit remains open in
numerous areas with excellent prospects for further growth.”
Summer 2017 Drilling Program Completed
The primary objectives of the summer 2017 explorati on program were to increase the confidence of the
Gryphon resource to an indicated level, and to expa nd the overall size of the estimated resources, ahe ad
of an updated resource estimate, scheduled for late r in the year, and the Pre-Feasibility Study ("PFS" ),
scheduled for 2018. As a result, the summer program included a total of 64 drill holes (totalling 29,8 23
metres) targeted within and in the immediate vicini ty of the Gryphon deposit. The large majority of d rill
holes (59) were completed as ‘daughter’ holes drill ed from part way down ‘parent holes’, which were
previously drilled from surface. Included in the fi nal 30 drill holes is also a single shaft pilot hol e, totalling
600 metres, which was completed near the Gryphon deposit as part of field activities related to the Wheeler
River PFS.
Illustrative Figures and Further Details
A plan map of the Gryphon A, B, C, D and E series l enses is provided in Figure 1. The inset on Figure 1
shows a schematic cross section of the A, B, C, D a nd E series lenses and their respective inclined
longitudinal section windows (as shaded rectangles) . Figures 2 to 6 provide inclined longitudinal sect ions
of the Gryphon A, B, C, D and E series lenses respe ctively. Figure 7 provides a plan map of the
mineralization located at, or immediately above, the sub-Athabasca unconformity which forms part of the E
series lenses.
The modelled mineralized lenses shown in Figures 1 to 6 are defined using a 0.05% U3O8 grade shell and
minimum thickness of two metres and have been updated following receipt of the winter 2017 assay results.
There is no certainty that the modelled mineralized lenses shown will constitute future mineral resour ces
and they may be subject to modifications as further drilling data becomes available.
Further details regarding the Gryphon deposit and t he current mineral resource estimates are provided in
the NI 43-101 Technical Report for the Wheeler Rive r project titled “Preliminary Economic Assessment for
the Wheeler River Uranium Project, Saskatchewan, Ca nada" dated April 8, 2016 with an effective date of
March 31, 2016. A copy of this report is availabl e on Denison’s website and under its profile on SEDAR
at www.sedar.com and on EDGAR at www.sec.gov/edgar.shtml.
Detailed Radiometric Equivalent Probe Results
The following tables provide the radiometric equivalent probe results from the final 30 drill holes completed
during the summer 2017 exploration program at Wheeler River.
Table 1: Radiometric equivalent probe results for drill holes targeting the Gryphon D and E series lenses
Section Drill Hole From (m) To (m) Length (m) 5 eU 3O8(%) 1,2,4 Lens Designation
5125GP
WR-646D1 557.9 558.9 1.0 0.33 E Series
and 586.8 588.6 1.8 1.0 E Series
3
including 3 587.3 588.3 1.0 1.4 E Series
and 686.5 687.5 1.0 0.36 D Series
5150GP
WR-621D4 No significant mineralization
WR-621D5 750.7 751.7 1.0 0.11 D Series
WR-646D2 584.7 586.2 1.5 4.6 E Series
including 3 584.9 586.0 1.1 6.2 E Series
WR-646D3 Not probed
WR-646D4 559.1 560.1 1.0 0.15 E Series
and 578.5 579.5 1.0 0.10 E Series
and 580.2 581.2 1.0 0.27 E Series
and 585.7 593.3 7.6 1.1 E Series
including 3 585.8 586.8 1.0 3.4 E Series
including 3 590.0 591.5 1.5 2.1 E Series
and 664.4 665.4 1.0 0.15 E Series
and 697.0 698.1 1.1 4.4 D Series
including 3 697.1 698.1 1.0 4.9 D Series
WR-646D5 578.7 579.9 1.2 0.97 E Series
including 3 578.7 579.7 1.0 1.1 E Series
and 586.1 587.1 1.0 0.14 E Series
5250GP
WR-657D3 559.3 560.3 1.0 0.11 E Series
and 561.4 562.4 1.0 0.23 E Series
and 564.4 566.6 2.2 0.86 E Series
including 3 564.5 565.5 1.0 1.7 E Series
and 664.5 665.5 1.0 0.24 E Series
and 677.6 678.6 1.0 0.22 E Series
and 693.4 694.4 1.0 0.92 D Series
and 701.3 702.6 1.3 2.0 D Series
including 3 701.4 702.4 1.0 2.5 D Series
5275GP
WR-657D2 586.4 587.4 1.0 0.20 E Series
and 624.3 625.3 1.0 0.11 E Series
and 680.1 682.6 2.5 1.6 D Series
including 3 680.5 682.4 1.9 2.0 D Series
and 700.4 701.4 1.0 0.12 D Series
WR-670D2 3 544.6 548.9 4.3 4.3 E Series
and 553.6 555.3 1.7 0.13 E Series
and 569.7 570.7 1.0 0.39 E Series
and 681.3 682.3 1.0 0.18 D Series
Notes:
1. eU 3O8 is radiometric equivalent U3O8 derived from a calibrated total gamma downhole probe. eU 3O8 results are preliminary
in nature and all mineralized intervals will be sampled and submitted for chemical U3O8 assay.
2. Intersection interval is composited above a cut- off grade of 0.1% eU 3O8 unless otherwise indicated.
3. Intersection interval is composited above a cut- off grade of 1.0% eU 3O8.
4. Composites are compiled using 1.0 metre minimum ore thickness and 2.0 metres maximum waste.
5. As the drill holes are oriented steeply toward t he northwest the true thickness of both the basemen t and unconformity
mineralization is expected to be approximately 75% of the intersection lengths (the basement mineralization is interpreted
to dip moderately to the southeast and the unconformity mineralization is interpreted to be flat-lying).
4
Table 2: Radiometric equivalent probe results for Gryphon deposit A, B, C definition and expansion drill
holes
Section Drill Hole From (m) To (m) Length (m) 5 eU 3O8(%) 1,2,4 Lens Designation
4775GP WR-679D1 No significant mineralization
4800GP WR-584BD2 631.2 632.2 1.0 0.11 B Series
4875GP WR-580D2 No significant mineralization
4900GP
WR-681AD1 No significant mineralization
WR-580D1 613.2 614.6 1.4 0.16 A Series
4925GP
WR-681AD2 698.9 699.9 1.0 0.26 A Series
and 718.3 719.9 1.6 1.3 A Series
including 3 718.6 719.6 1.0 1.9 A Series
and 725.8 727.4 1.6 1.7 A Series
including 3 726.1 727.2 1.1 2.2 A Series
and 785.1 786.1 1.0 0.54 C Series
WR-673D1 612.6 615.5 2.9 1.1 A Series
including 3 614.5 615.5 1.0 2.8 A Series
and 648.7 649.7 1.0 0.17 B Series
and 680.9 681.9 1.0 0.15 C Series
and 697.3 698.3 1.0 0.28 C Series
and 699.6 700.6 1.0 0.15 C Series
WR-681AD3 705.6 709.0 3.4 0.41 A Series
and 714.1 717.2 3.1 4.0 A Series
including 3 715.3 717.0 1.7 6.9 A Series
and 724.5 725.5 1.0 0.29 B Series
and 781.8 782.8 1.0 0.29 C Series
4950GP
WR-572D4 641.7 642.7 1.0 0.78 A Series
and 644.3 645.3 1.0 0.11 A Series
and 657.5 658.5 1.0 0.38 B Series
and 665.5 667.4 1.9 0.21 B Series
and 706.7 707.7 1.0 0.19 C Series
4975GP
WR-572D3 643.3 644.4 1.1 0.23 A Series
and 668.5 669.5 1.0 0.17 B Series
and 685.1 686.1 1.0 0.13 B Series
WR-624D2 632.9 633.9 1.0 0.32 A Series
and 634.3 635.3 1.0 0.10 A Series
and 636.5 637.5 1.0 0.19 A Series
and 642.0 643.0 1.0 0.10 A Series
and 647.7 651.1 3.4 1.1 A Series
including 3 649.8 650.8 1.0 2.7 A Series
and 669.6 670.7 1.1 0.33 B Series
and 677.5 678.7 1.2 0.46 B Series
and 731.9 733.5 1.6 1.0 C Series
including 3 732.3 733.3 1.0 1.6 C Series
5
5000GP
WR-624D1 628.7 629.7 1.0 0.79 A Series
and 635.2 636.2 1.0 0.11 A Series
and 638.0 639.0 1.0 0.31 A Series
and 653.2 654.2 1.0 0.83 A Series
and 656.2 657.9 1.7 1.0 A Series
including 3 656.2 657.2 1.0 1.6 A Series
and 662.2 666.3 4.1 0.57 A Series
including 3 663.4 664.4 1.0 1.3 A Series
and 691.6 695.3 3.7 0.31 B Series
and 737.5 742.0 4.5 0.56 C Series
and 745.8 748.1 2.3 0.69 C Series
and 797.2 799.3 2.1 0.23 C Series
WR-578D1 707.4 708.4 1.00 0.59 A Series
and 758.0 759.7 1.7 2.5 A Series
including 3 758.5 759.5 1.0 3.9 A Series
and 766.8 768.0 1.2 0.42 B Series
WR-624D3 631.1 632.1 1.0 0.20 A Series
and 636.4 640.2 3.8 0.54 A Series
including 3 637.2 638.2 1.0 1.3 A Series
and 660.9 666.1 5.2 4.0 B Series
including 3 663.8 665.9 2.1 9.3 B Series
and 669.2 670.3 1.1 0.28 B Series
and 720.9 721.9 1.0 0.40 C Series
and 738.6 741.2 2.6 0.69 C Series
5025GP
WR-560D1 669.6 672.4 2.8 0.39 A Series
and 675.2 676.2 1.0 0.24 A Series
and 720.4 721.4 1.0 0.24 B Series
and 759.2 760.4 1.2 3.8 C Series
including 3 759.3 760.3 1.0 4.5 C Series
WR-560D2 675.0 676.0 1.0 0.38 B Series
and 696.8 697.8 1.0 0.10 B Series
and 729.2 730.5 1.3 0.13 C Series
and 744.9 745.9 1.0 0.16 C Series
and 747.8 754.7 6.9 0.76 C Series
including 3 747.9 748.9 1.0 1.0 C Series
including 3 750.4 751.4 1.0 2.0 C Series
including 3 752.0 753.0 1.0 1.2 C Series
5075GP
WR-568D3 687.9 690.2 2.3 0.18 A Series
and 725.3 726.3 1.0 0.14 A Series
and 753.0 754.3 1.3 0.54 C Series
5125GP
WR-600D2 723.3 725.2 1.9 0.35 A Series
and 729.1 730.1 1.0 0.20 B Series
and 732.2 733.4 1.2 0.12 B Series
and 741.1 743.2 2.1 0.11 B Series
5150GP WR-600D3 710.4 714.5 4.1 0.21 A Series
6
and 720.8 721.8 1.0 0.21 A Series
and 732.7 733.8 1.1 0.18 B Series
and 738.2 739.2 1.0 0.16 B Series
Notes:
1. eU 3O8 is radiometric equivalent U3O8 derived from a calibrated total gamma downhole probe. eU 3O8 results are preliminary
in nature and all mineralized intervals will be sampled and submitted for chemical U3O8 assay.
2. Intersection interval is composited above a cut- off grade of 0.1% eU 3O8 unless otherwise indicated.
3. Intersection interval is composited above a cut- off grade of 1.0% eU 3O8.
4. Composites are compiled using 1.0 metre minimum ore thickness and 2.0 metres maximum waste.
5. As the drill holes are oriented steeply toward t he northwest and the basement mineralization is interpreted to dip moderately
to the southeast, the true thickness of the mineralization is expected to be approximately 75% of the intersection lengths.
Qualified Persons and Data Quality
Dale Verran, MSc, P.Geo, Pr.Sci.Nat., Denison's Vice President, Exploration, who is a Qualified Person in
accordance with the requirements of NI 43-101 has r eviewed and approved the technical information
contained in this release. The Company currently re ports preliminary radiometric equivalent grades
("eU 3O8"), derived from a calibrated downhole total gamma probe, during its exploration programs and
subsequently reports definitive assay grades follow ing sampling and chemical analysis of the mineraliz ed
drill core. Radiometric equivalent probe results ar e subject to verification procedures by qualified p ersons
employed by Denison prior to disclosure. For furthe r details on the total gamma downhole probe methods
employed by Denison, QAQC procedures and data verif ication procedures please see Denison's Annual
Information Form dated March 23, 2017 filed under the Company's profile on SEDAR (www.sedar.com).
About Wheeler River
Wheeler River is the largest undeveloped high-grade uranium project in the infrastructure rich eastern
portion of the Athabasca Basin region, in northern Saskatchewan. The project is a joint venture betwe en
Denison (60% and operator), Cameco Corp. (“Cameco”) (30%), and JCU (Canada) Exploration Company
Limited (“JCU”) (10%), and is host to the high-grade Gryphon and Phoenix uranium deposits discovered by
Denison in 2014 and 2008, respectively. The Gryphon deposit is hosted in basement rock and is currentl y
estimated to contain inferred resources of 43.0 mil lion pounds U 3O8 (above a cut-off grade of 0.2% U 3O8)
based on 834,000 tonnes of mineralization at an ave rage grade of 2.3% U 3O8. The Phoenix unconformity
deposit is located approximately 3 kilometres to th e southeast of Gryphon and is estimated to include
indicated resources of 70.2 million pounds U 3O8 (above a cut-off grade of 0.8% U 3O8) based on 166,000
tonnes of mineralization at an average grade of 19.1% U 3O8, and is the highest grade undeveloped known
uranium deposit in the world.
On April 4th, 2016, Denison announced the results of a Preliminary Economic Assessment (“PEA”) for the
Wheeler River Project, which considers the potentia l economic merit of co-developing the high-grade
Gryphon and Phoenix deposits as a single undergroun d mining operation. The PEA returned a base case
pre-tax Internal Rate of Return ("IRR") of 20.4% ba sed on the current long term contract price of uran ium
(US$44.00 per pound U 3O8), and Denison's share of estimated initial capital expenditures ("CAPEX") of
CAD$336M (CAD$560M on 100% ownership basis). Explo ration results from the subsequent drilling
programs have not been incorporated into the resour ce estimate or the PEA. The PEA is preliminary in
nature and includes inferred mineral resources that are considered too speculative geologically to have the
economic considerations applied to them to be categ orized as mineral reserves, and there is no certain ty
that the preliminary economic assessment will be realized. Mineral resources are not mineral reserves and
do not have demonstrated economic viability. On Jul y 19th, 2016 Denison announced the initiation of a
Pre-Feasibility Study ("PFS") for the Wheeler River property and the complimentary commencement of an
infill drilling program at the Gryphon deposit to b ring the inferred resources to an indicated level o f
confidence.
As previously announced on January 10, 2017, Deniso n has entered into an agreement with its Wheeler
River Joint Venture partners, Cameco and JCU, to fu nd 75% of Joint Venture expenses in 2017 and 2018
(ordinarily 60%) in exchange for an increase in Denison's interest in the project to up to approximately 66%.
Under the terms of the agreement, Cameco will fund 50% of its ordinary 30% share in 2017 and 2018, and
JCU is expected to continue to fund its 10% interest in the project.
7
About Denison
Denison is a uranium exploration and development company with interests focused in the Athabasca Basin
region of northern Saskatchewan, Canada. In addition to its 60% owned Wheeler River project, which hosts
the high-grade Phoenix and Gryphon uranium deposits , Denison's exploration portfolio consists of
numerous projects covering approximately 347,000 he ctares in the Athabasca Basin region, including
327,000 hectares in the infrastructure rich eastern portion of the Athabasca Basin. Denison's interest s in
Saskatchewan also include a 22.5% ownership interest in the McClean Lake joint venture (“MLJV”), which
includes several uranium deposits and the McClean L ake uranium mill, which is currently processing ore
from the Cigar Lake mine under a toll milling agreement, plus a 25.17% interest in the Midwest deposit and
a 64.22% interest in the J Zone deposit on the Wate rbury Lake property. Both the Midwest and J Zone
deposits are located within 20 kilometres of the McClean Lake mill.
Denison is also engaged in mine decommissioning and environmental services through its Denison
Environmental Services division and is the manager of Uranium Participation Corp., a publicly traded
company which invests in uranium oxide and uranium hexafluoride.
For more information, please contact
David Cates (416) 979-1991 ext. 362
President and Chief Executive Officer
Sophia Shane (604) 689-7842
Investor Relations
Follow Denison on Twitter @DenisonMinesCo
Cautionary Statement Regarding Forward-Looking Statements
Certain information contained in this press release constitutes "forward-looking information", within the meaning of the United States
Private Securities Litigation Reform Act of 1995 an d similar Canadian legislation concerning the busin ess, operations and financial
performance and condition of Denison.
Generally, these forward-looking statements can be identified by the use of forward-looking terminolog y such as "plans", "expects",
"budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes", or the negatives and/or variations of such words and
phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or "has
the potential to". In particular, this press release contains forward-looking information pertaining to the following: exploration (including
drilling) and evaluation activities, plans and objectives; potential mineralization of drill targets; the estimates of Denison's mineral resources
and the results of its PEA; plans and objectives with respect to updating its resource estimates and preparing a PFS; and Denison’s
percentage in its properties and its plans and agreements with its joint venture partners, as applicable. Statements relating to "mineral
reserves" or "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment, based on certain
estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they
are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance
or achievements of Denison to be materially different from those expressed or implied by forward-looking statements. Denison believes
that the expectations reflected in this forward-looking information are reasonable but no assurance can be given that these expectations
will prove to be accurate and may differ materially from those anticipated in this forward looking information. For a discussion in respect
of risks and other factors that could influence forward-looking events, please refer to the factors discussed in Denison's Annual Information
Form dated March 23, 2017 under the heading "Risk Factors". These factors are not, and should not be construed as being exhaustive.
Accordingly, readers should not place undue reliance on forward-looking statements.
The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Any forward-looking
information and the assumptions made with respect thereto speaks only as of the date of this press release. Denison does not undertake
any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information
to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation .
Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Mineral Resources: This
press release may use the terms “measured”, “indicated” and “inferred” mineral resources. United States investors are advised that while
such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not
recognize them. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and as to their economic and legal
feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under
Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States
investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral
reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is
economically or legally mineable.
8
Figure 1: Plan map of the northeast plunging Gryphon mineralized lenses projected up to the simplified basement geology at the
sub-Athabasca unconformity.