1100 – 40 University Ave 

Toronto, ON  M5J 1T1 

www.denisonmines.com 

PRESS RELEASE

DENISON ANNOUNCES INITIATION OF ISR FIELD TESTING

AS THE SUMMER FIELD PROGRAM COMMENCES

AT WHEELER RIVER

Toronto, ON – June 26, 2019. Denison Mines Corp. (“Denison” or the “Company”) (DML: TSX, DNN:

NYSE American) is pleased to announce the commencement of In-Situ Reco very (“ISR”) field testing, as

part of an active summer 2019 field program plann ed for the Company’s 90% owned Wheeler River

Uranium Project (“Wheeler River”) in northern Sa skatchewan, Canada. Key components of the field

program include:

 ISR Field Testing: Initiation of an ISR field test program at the Phoenix deposit, designed to collect

an extensive database of hydrogeological data. The data will be used to evaluate the ISR mining

conditions present at the deposit, and is expected to be incorporated into a detailed ISR mine plan,

as part of the completion of a Feasibility Study (“FS”) for the project;

 Environmental Baseline Data Collection: Continuation and expansion of the collection of certain

environmental baseline data to support the W heeler River Environmental Impact Assessment

(“EIA”); and

 Exploration Drilling: Approximately 5,000 metres of diamond drilling in 10 holes expected to focus

on the follow-up and expansion of unconformity-h osted uranium mineralization intersected along

the K-West trend during the summer 2018 and winter 2019 programs.

David Cates, President and CE O of Denison, commented, “ We are pleased to have our summer field

program at Wheeler River underway. A significant amount of work has gone into preparing and planning

for the ISR field test, which will be the first of its kind in the Athabasca Basin. Denison has assembled a

team of seasoned ISR and drilling experts to comp lement our extensive geological knowledge of the

Phoenix deposit – working together to facilitate t he planning and implementation of the program. These

tests represent an important step in increasing the c onfidence in the ISR application at Phoenix and de-

risking the project as we advance toward a Feasibility Study.

On the exploration front, there remains significant potential on the Wheeler River property. The prospect of

discovering additional high-grade deposits, with the potential to form satellite ISR operations, is compelling

from both an exploration and economic perspective. Our exploration team has designed a focused program

to test for the initial indications of such deposits along the K West trend, which will follow-up on previous

encouraging results”.

ISR Field Testing

As outlined within the Company’s Pre-Feasibility Study (“PFS”) completed in late 2018, additional field work

is required to increase confidence and reduce risk associated with the application of the ISR mining method

at Phoenix. Previous field and laboratory testing, completed as part of the PFS, indicated that flow of mining

solution through the ore zone is expected to be viable at rates envisaged for the planned rate of production.

The field work planned for 2019 is focused on in-situ testing in the orebody, using water to evaluate

hydraulic conditions that can be used to assess mining solution flow between a series of test wells. The

information collected through this process is expected to increase the overall confidence of the application

of ISR and facilitate detailed mine planning as part of a FS.

Denison has engaged Petrotek Corporation (“Petrotek”) to facilitate the design and implementation of ISR

field testing at Phoenix. Petrotek specializes in technical evaluation and field operations regarding

subsurface fluid flow and injecti on projects, with experience ranging from feasibility studies to facility

2

operation. The firm has more than 20 years of experience in the ISR uranium mining industry and currently

provides consulting services to each of the ISR uranium miners in the United States.

Petrotek and Denison have designed an ISR field test ing program specific to the unique geological

characteristics of the Phoenix deposit. The testing program aims to provide hydrogeological testing across

four areas (“Test Areas”) of Phoenix Zone A, covering approximately 65% of the Indicated Mineral Resource

estimated for the deposit. The Test Areas have been se lected with the objective of covering each of the

various fluid flow domains, and combinations thereof, expected to exist within the deposit. The domains

have been defined from detailed geological databases and associated models, such that the Test Areas

are collectively representative of the deposit as a whole. Data acquired from the ISR field testing program

will be utilized to create an integrated hydrogeological model, which will form the basis for ISR wellfield and

freeze dome design necessary for the FS and to support the EIA process.

Denison has initiated testing within Test Area 1 and plans to advance to Test Area 2 during the summer

2019 program, with the remaining Test Areas (Test Ar ea 3 and 4) to be completed during 2020. Figure 2

illustrates the Test Areas planned for ISR field testing within Phoenix Zone A. The objective within each

Test Area will be to efficiently establish the fundam ental hydraulic characteri stics of the orebody, the

overlying sandstone and overburden formations, and the underlying basement rocks. This will be achieved

through the installation of several near-vertical HQ and PQ sized wells between 7 and 15 metres apart and

the subsequent pumping, injection and monitoring of gr ound water to establish the hydraulic connectivity

between wells. The program will utilize existing exploration drill holes for well installation, where possible.

Certain large-diameter wells, commencing with one well per Test Area, are also planned to determine

optimal drilling and installation methodologies for the “commercial-scale wells” expected to be used for

production. At this stage, the large-diameter wells ar e designed to allow for the insertion of larger pumps

and additional downhole equipment that will facilitate co mmercial scale pump and injection tests and the

evaluation of certain permeability enhancement techniques.

Additional supportive permeability and porosity tests are planned through the ore zone, and are expected

to include hydraulic conductivity tests (packer testing) and downhole geophysics (nuclear magnetic

resonance and neutron), where borehole conditions allow. Mineralized core samples from the orebody,

obtained in new holes or by wedging from existing bor eholes, will be subject to detailed onsite geological

and geotechnical logging and permeability (permeameter) testing, and will be preserved to facilitate future

planned laboratory-based metallurgical test work.

Environmental Baseline Data Collection

Denison recently announced the initia tion of the EIA process for Wheeler River, following acceptance of

the Provincial Technical Proposal and Federal Project Description by the relevant regulatory agencies (see

Denison’s press release dated June 3, 2019). The summ er program at Wheeler River will include the

continuation and expansion of the co llection of certain baseline environmental data to support the EIA.

Baseline data collection is expected to include:

 Regional hydrogeological testing outside of the Phoenix deposit to establish baseline conditions

within the local and regional groundwater system. The data collected, including groundwater levels,

flow and quality, will form key inputs to groundwater models for the EIA;

 Continuation of the collection of aquatic, te rrestrial, groundwater and atmospheric data;

 Continuation of the collection of waste rock geochemical data; and

 A heritage survey designed to cover certain areas of the project footprint outlined in the PFS (e.g.

the airstrip), which were not completed during the previous program in 2017.

Exploration Drilling

Reconnaissance drill testing of the sub-Athabasca unconformity along the 4.5 kilometre-long K-West

conductive trend has returned encouraging uranium and base metal sulphide intercepts together with other

geological features commonly associated with unconformity-related uranium deposits (see Denison’s press

releases dated November 12, 2018 and May 1, 2019). Figure 3 illustrates the location of the K-West

exploration target area.

3

Systematic follow-up drilling is warranted in this area, as many of the drill holes completed to date have not

intersected the interpreted optimal target horizon, and the current drill hole spacing along strike ranges from

300 to 600 metres.

The summer 2019 exploration program is scheduled to commence in July 2019 and is expected to consist

of approximately 5,000 metres of diamond drilling in 10 holes. The drilling is expected to be focused on

testing targets along section and along strike of the previous drill holes at K West.

About Wheeler River

Wheeler River is the largest undeveloped uranium projec t in the infrastructure rich eastern portion of the

Athabasca Basin region, in northern Saskatchewan – including combined Indicated Mineral Resources of

132.1 million pounds U3O8 at an average grade of 3.3% U 3O8, plus combined Inferred Mineral Resources

of 3.0 million pounds U3O8 at an average grade of 1.7% U3O8. The project is host to the high-grade Phoenix

and Gryphon uranium deposits, discovered by Denison in 2008 and 2014, respectively, and is a joint

venture between Denison (90% and operator) and JCU (Canada) Exploration Company Limited (10%).

A PFS was completed, considering the potential economic merit of developing the Phoenix deposit as an

ISR operation and the Gryphon deposit as a conventional underground mining operation. Taken together,

the project is estimated to have mine production of 109.4 million pounds U3O8 over a 14-year mine life, with

a base case pre-tax NPV of $1.31 billion (8% discount rate), Internal Rate of Return ("IRR") of 38.7%, and

initial pre-production capital expenditures of $322.5 million. The Phoenix ISR operation is estimated to have

a stand-alone ba se case pre-tax NPV of $930.4 million (8% di scount rate), IRR of 43.3%, initial pre-

production capital expenditures of $322.5 million, and industry leading aver age operating costs of

US$3.33/lb U3O8. The PFS is prepared on a project (100% ownership) and pre-tax basis, as each of the

partners to the Wheeler River Joint Venture are subject to different tax and other obligations.

Further details regarding the PFS, including additional scientific and technical information, as well as after-

tax results attributable to Denison's ownership intere st, are described in greater detail in the NI 43-101

Technical Report titled "Pre-feasibility Study for the Wheeler River Uranium Project, Saskatchewan,

Canada" dated October 30, 2018 with an effective date of September 24, 2018. A copy of this report is

available on Denison's website and under its pr ofile on SEDAR at www.sedar.com and on EDGAR at

www.sec.gov/edgar.shtml.

About Denison

Denison is a uranium exploration and development company with interests focused in the Athabasca Basin

region of northern Saskatchewan, Canada. In addition to the Wheeler River project, Denison’s Athabasca

Basin exploration portfolio consists of numerous projects covering approximately 310,000 hectares.

Denison’s interests in the Athabasca Basin also include a 22.5% ownership interest in the McClean Lake

joint venture (“MLJV”), which includes several uranium deposits and the McClean Lake uranium mill, which

is currently processing ore from the Cigar Lake mine under a toll milling agreement, plus a 25.17% interest

in the Midwest and Midwest A deposits, and a 66.51% interest in the J Zone and Huskie deposits on the

Waterbury Lake property. Each of Midwest, Midwest A, J Zone and Huskie are located within 20 kilometres

of the McClean Lake mill.

Denison is also engaged in mine decommissioning and environmental services through its Denison

Environmental Services division and is the manager of Uranium Participation Corp., a publicly traded

company which invests in uranium oxide and uranium hexafluoride.

For more information, please contact

David Cates (416) 979-1991 ext 362

President and Chief Executive Officer

Sophia Shane (604) 689-7842

Investor Relations

Follow Denison on Twitter @DenisonMinesCo

4

Qualified Persons

The disclosure of scientific and technical information regarding the Wheeler River Project in this news

release was reviewed and approved by Dale Verran, MSc, P.Geo., Pr.Sci.Nat., the Company's Vice

President, Exploration, a Qualified Person in accordance with the requirements of NI 43-101.

Cautionary Statement Regarding Forward-Looking Statements

Certain information contained in this news release constitutes ‘forward-looking information’, within the meaning of the applicable United

States and Canadian legislation concerning the business, operations and financial performance and condition of Denison.

Generally, these forward-looking statements c an be identified by the use of forward-look ing terminology such as ‘plans’, ‘expects’,

‘budget’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’, or ‘believes’, or the negatives and/or variations of such words and

phrases, or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’, ‘be achieved’ or ‘has

the potential to’.

In particular, this news release contains forward-looking information pertaining to the following: exploration (including drill ing) and

evaluation interpretations, activities, plans and objectives; the results of the PFS and expectations with respect thereto; development

and expansion plans and objectives, including plans for the EA and other regulatory and feasibility study processes for Wheeler River;

expectations regarding Denison’s community engagement and MOUs with local communities; and expectations regarding its joint

venture ownership interests and the continuity of its agreements with its partners.

Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and

they are subject to known and unknown risks, uncertainties and other factors that may c ause the actual results, level of activi ty,

performance or achievements of Denison to be materially different from those expre ssed or implied by such forward-looking

statements. Denison believes that the expectations reflected in this forward-looking information are reasonable but no assurance can

be given that these expectations will prove to be accurate and results may differ ma terially from those anticipated in this for ward-

looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to

the factors discussed in Denison’s Annual Information Form dated March 12, 2019 under the heading ‘Risk Factors’. These factors

are not, and should not be construed as being exhaustive.

Accordingly, readers should not place undue re liance on forward-looking statements. The forward-looking information contained i n

this news release is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with

respect thereto speaks only as of the date of this news release. Denison does not undertake any obligation to publicly update or revise

any forward-looking information after the date of this news rel ease to conform such information to actual results or to changes in

Denison's expectations except as otherwise required by applicable legislation.

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Mineral Resources

and Probable Mineral Reserves: This news release may use the terms 'measured', 'indicated' and 'inferred' mineral resources.

United States investors are advised that while such terms have been prepared in accordance with the definition standards on mineral

reserves of the Canadian Institute of Mining, Metallurgy and Pe troleum referred to in Canadian National Instrument 43-101 Miner al

Disclosure Standards ("NI 43-101") and are recognized and requir ed by Canadian regulations, the United States Securities and

Exchange Commission ("SEC") does not recognize them. 'Inferred miner al resources' have a great amount of uncertainty as to thei r

existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will

ever be upgraded to a higher category. Under Canadian rules, estima tes of inferred mineral resources may not form the basis of

feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or

indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to

assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable. The estimates of

mineral reserves in this news release have been prepared in accordance with NI 43-101. The definition of probable mineral reserves

used in NI 43-101 differs from the definition used by the SEC in the SEC's Industry Guide 7. Under the requirements of the SEC ,

mineralization may not be classified as a "reserve" unless the determination has been made, pursuant to a "final" feasibility study that

the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Denis on

has not prepared a feasibility study for the purposes of NI 43-101 or the requirements of the SEC. Accordingly, Denison's prob able

mineral reserves disclosure may not be comparable to informat ion from U.S. companies subjec t to the reporting and disclosure

requirements of the SEC.

5

Figure 1. Location map of Wheeler River showing existing and proposed infrastructure.

6

Figure 2. Phoenix Zone A plan view showing Test Areas delineated for ISR field testing.

7

Figure 3. Basement geology map for Wheeler River showing the 2019 exploration targets areas, including K West.