Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DLTA.V ·

Delta Set to Drill VMS Targets IN Chibougamau, Quebec.

Exploration Programs

DELTA SET TO DRILL VMS TARGETS IN CHIBOUGAMAU, QUEBEC.

December 1, 2020 / Kingston, ON / Accesswire . Delta Resources Limited (“Delta” or “the Company”)

(TSXV:DLTA )(OTCBB:GOLHF ) (FRANKFURT:6G01 ) is pleased to announce that it is nearing completi on of its

first phase of drilling at the Delta 2 project in Chibougamau, Quebec. During this first phase, 15 drill holes have been

completed totalling 2,288 metres. The drill holes to date have been focussed on the southern portion of the property

or otherwise referred to as the Snowfall gold-silve r-copper occurrence. Drill results from the first p hase of the

campaign are not expected until the new year.

The drill holes in the southern portion of the Delta-2 project consist of magmatic-hydrothermal gold deposits related

to the La Dauversiere pluton, such as the Joe Mann past producer (1956-2007: 1.173 million ounces of g old at a

grade of 8.26 g/t Au, 607,000 ounces of silver at 5 g/t Ag and 28.7 million pounds of copper at 0.25% Cu) (Source:

Technical Report on the Joe Mann Mining Property dated January 11, 2016, prepared by Geologica Inc.).

Delta will immediately begin its second phase of dr illing after completion of phase 1 and plans to con tinue drilling

until December 18, 2020. The second phase of the drill program will be aimed at testing its previously defined VMS

targets in Chibougamau, Quebec. This second phase w ill consist of an approximate additional 3,000 metres o f

drilling aimed at testing a minimum of 10 Volcanogenic Massive Sulphide (VMS) targets in the eastern portion of the

Delta-2 property. Delta will begin drilling the VMS targets shortly and continue the program after the holiday break

in early January 2021.

The VMS targets consist of isolated helicopter-borne VTEM conductors located proximal to the horizon that also

hosts the past-producing Lemoine Mine. Between 1975 and 1983, the extraordinarily rich Lemoine Mine produced

757,585 tonnes of ore grading 9.52% Zn, 4.18% Cu, 4.56 g/t Au and 82.26 g/t Ag (Source:

www.sigeom.mines.gouv.qc.ca ).

The Company will update its investors on the progress of the second phase of its campaign as soon as it has been

completed or when the company and its drillers break for the holidays.

About Delta Resources Limited

Delta Resources Limited is a Canadian mineral exploration company focused on growing shareholder value through

the exploration of two very high-potential gold and base-metal projects in Canada.

• DELTA-1, located 50km west of Thunder Bay, Ontari o where a 1000m drilling program was completed in N ov.

2019, testing the newly discovered Eureka Gold prospect. Results so far show very wide intercepts of low-grade

gold in a km-scale alteration zone.

• DELTA-2, located 35km SE of the Chibougamau, Queb ec, where preliminary due diligence and prospecting

work discovered two new gold occurrences where grab samples returned up to 55,8 g/t Au and 11,45 g/t Au.

Delta also owns a 100% interest in the Bellechasse- Timmins gold deposit in SE Quebec, which contains a 43-101

gold resource of 171,000 oz @1.83 g/t gold (indicat ed) and an additional 95,000 oz @1.36 g/t gold (inf erred). On

July 3, 2020, Delta signed an agreement with Yorkton Ventures Inc for the sale of the Bellechasse-Timmins project

for $1,7M payable over 15 months of signing.

ON BEHALF OF THE BOARD OF DELTA RESOURCES LIMITED.

Andre C. Tessier

President, CEO and Director

www.deltaresources.ca

We seek safe harbor. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange

has not approved nor disapproved of the information contained herein.

For Further Information:

Delta Resources Limited

Frank Candido, Chairman, VP Corporate Communications

Tel : 514­969­5530

[email protected]

or

Andre Tessier, CEO and President

Tel: 613­328­1581

[email protected]

Cautionary Note Regarding Forward Looking Information

Some statements contained in this news release are "forward looking information" within the meaning of Canadian securities

laws. Forward looking information includes, but is not limited to, statements regarding: the samples m ay be proximal to a rich

bedrock source for the gold; the possibility of the same source for gold mineralization; and the initi ation of a property-scale till

survey in September. Generally, forward-looking information can be identified by the use of forward-looking terminology such as

"plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes" or variations

of such words and phrases (including negative or gr ammatical variations) or statements that certain actions, events or results

"may", "could", "would", "might" or "will be taken" , "occur" or "be achieved" or the negative connotat ion thereof. Investors are

cautioned that forward-looking information is inherently uncertain and involves risks, assumptions and uncertainties that could

cause actual facts to differ materially. There can be no assurance that future developments affecting the Company will be those

anticipated by management. The forward-looking information contained in this press release constitutes management's current

estimates, as of the date of this press release, with respect to the matters covered thereby. We expect that these estimates will

change as new information is received. While we may elect to update these estimates at any time, we do not undertake to update

any estimate at any particular time or in response to any particular event.