Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DLTA.V ·

Delta Receives Exploration Permits Ahead of 2025 Drilling at the DELTA-1 Expanded Property IN Thunder BAY, Ontario and Grants Stock Options.

Permits & Approvals Share Capital & Compensation

DELTA RECEIVES EXPLORATION PERMITS AHEAD OF 2025 DRILLING AT THE

DELTA-1 EXPANDED PROPERTY IN THUNDER BAY, ONTARIO AND GRANTS STOCK

OPTIONS.

November 26, 2024 / Montreal, Quebec / Newsfile Corp . Delta Resources Limited (“Delta” or “The

Company”) (TSX-V: DLTA) (OTCBB:DTARF) (Frankfurt: 6G01) is pleased announce that it has received

two exploration permits to allow for early-stage mineral exploration at the Delta -1 Expanded property in the

Thunder Bay District of Ontario. Over 90% of the Delta-1 Expanded property is now permitted for early-stage

exploration which includes diamond drilling (see figure 1).

Figure 1: Geology map of the Shebandowan belt showing the area covered by the Delta-1 Expanded property and showing the

area within the property that is currently permitted for early-stage exploration (including diamond drilling).

Delta has granted 4,005,000 stock-options to management, the board of directors, employees and

consultants. The options are exercisable at $0.20 for 3 years from the date of the grant and vest immediately.

About Delta Resources Limited

Delta Resources Limited is a Canadian mineral exploration company focused on growing shareholder value

through the exploration of two very high-potential gold and base-metal projects in Canada.

DELTA-1 is Delta’s flagship project, where the company is building on a large gold inventory 50 kilometres

west of Thunder Bay, Ontario, at surface and adjacent to the Trans -Canada highway. To date, the gold

mineralization is defined over a strike length of 2.5 km, from surface to a vertical depth of 300 m. Highlights

include drill intercepts such as 5.92 g/t Au over 31 m (incl. 14.8 g/t Au over 11.9 m), and 1.79 g/t Au over

128.5 m. The property covers 308 square kilometres where Delta has identified multiple corridors of intense

alteration and deformation, on strike with, and to the south of the Eureka gold zone and that has yet to be

thoroughly explored.

0 255 2010 15

kilometres

SCALE

DELTA-1 PROPERTY

Regional Geology

N

Thunder Bay

Kewanawan Proterozoic Belt 1.1-1.2Ga

Opawica Gneissic Belt

Pre-Orogenic Granitoids 2750-2695Ma

DELTA-1 PROPERTY OUTLINE

14

5 6 8

7

EUREKA GOLD DEPOSIT

2) Moss Lake: 6 Moz Au

4) East Coldstream: 763,000 oz Au @ 0.78 g/T

3) Coldstream: (1906-67) 103M lb Cu

1) Inco Mine: (1972-98) 9.29MT @ 1.75% Ni, 0.88% Cu, 1.83 g/t PGE

6) Pistol Lake: 72,000 oz @ 2.62 g/t Au

7) Bandore #4: 96,000 oz Au @ 4.83 g/t Au

5) Vanguard: 300,000 T @1.5% Cu, 2.5% Zn, 5.0 g/t Au

8) Bandore Main: 156,000 oz Au @ 6.86 g/t Au

DEPOSITS

Permitted

Not Yet Permitted

The DELTA-2 property covers 205 square kilometres in the prolific Chibougamau District of Quebec. The

property holds excellent potential for gold -rich polymetallic VMS deposits as well as hydrothermal -gold

deposits. Delta targets VMS deposits such as the LeMoine past producer where 0.76 Mt were mined between

1975 and 1983, grading 9.6% Zn, 4.2% Cu, 4.5 g/t Au and 84 g/t Ag.

ON BEHALF OF THE BOARD OF DELTA RESOURCES LIMITED.

Frank Candido

Chairman

www.deltaresources.ca

For Further Information:

Delta Resources Limited

Andre C. Tessier, President and CEO

Tel: 613-328-1581

[email protected]

or

Frank Candido, Chairman

Tel: 514-969-5530

[email protected]

We seek safe harbor. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The TSX Venture Exchange

has not approved nor disapproved of the information contained herein.

Cautionary Note Regarding Forward Looking Information

Some statements contained in this news release are "forward-looking information" within the meaning of Canadian securities

laws. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans",

"expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes" or variations of such

words and phrases (including negative or grammatical variations) or statements that certain actions, events or results "may",

"could", "would", "might" or "will be taken", "occur" or "be achieved" or the negative connotation thereof. Investors are cautioned

that forward-looking information is inherently uncertain and involves risks, assumptions and uncertainties that could cause

actual facts to differ materially. There can be no assurance that future developments affecting the Company will be those

anticipated by management. The forward-looking information contained in this press release constitutes management's current

estimates, as of the date of this press release, with respect to the matters covered thereby. We expect that these estimates will

change as new information is received. While we may elect to update these estimates at any time, we do not undertake to

update any estimate at any particular time or in response to any particular event.