Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DLP.V ·

DLP Resources intersects 451.2m of 1.04% CuEq* within a 773.2m interval of 0.82% CuEq* on the Aurora Project in Southern Peru and Appoints New Chief Financial Officer

Drill Results Management Changes

DLP Resources intersects 451.2m of 1.04% CuEq* within a 773.2m interval of 0.82% CuEq* on the

Aurora Project in Southern Peru and Appoints New Chief Financial Officer

Cranbrook, British Columbia, (Newsfile Corp. – January 04, 2024) DLP Resources Inc. (“DLP” or the “Company”)

(TSXV:DLP) (OTCQB:DLPRF) announces receipt of complete drill results for drillhole, A23-013 on the Aurora porphyry

copper-molybdenum project in southern Peru (Figure 1).

Results for the first twelve drillholes, A22-001, A22-002, A22-003, A23-004, A23-005, A23-006, A23-007, A23-008,

A23-009, A23-010, A23-011 and A23-012 were last released on November 14, 2023. (see DLP Resources Inc., news

release of November 14, 2023, for results for A23-001 to A23-012 and Table 3 below).

Highlights

Drillhole A23-013 was drilled approximately 515m northwest of drillhole A23-012 and intersected significant copper

and molybdenum mineralization throughout the hole to a depth of 981.20m. A23-013 ended in molybdenum

mineralization and the most significant mineralized intervals included:

• 0.82% CuEq* over 773.20m (0.17% Cu, 0.1221% Mo and 1.91g/t Ag) from 208.00m to 981.20m.

• 0.44% CuEq* over 152.00m (0.38% Cu, 0.0056% Mo and 4.13g/t Ag) from 208.00m to 360.00m.

• 0.57% CuEq* over 170.00m (0.30% Cu, 0.0490% Mo and 2.78g/t Ag) from 360.00m to 530.00m.

• 1.04% CuEq* over 451.20m (0.05% Cu, 0.1883% Mo and 0.72g/t Ag) from 530.00m to 981.20m.

The complete set of results for A23-013 are summarized in Table 1 below.

Mr. Gendall, President and CEO commented: “A23-013 was drilled on a step-out of 515m to the northwest of A23-

012 to infill the area between the NW and SE side of the Aurora project. This hole was drilled at a higher elevation

to intersect greater copper mineralization in the upper levels of the drillhole. As predicted, we encountered 152m of

weakly enriched copper mineralization of 0.38% copper from 208m to 360m. Beyond this depth we continued to

encounter good copper equivalent mineralization to the end of the hole at 981.20m. We are very encouraged with

the results from drillhole A23-013 and will continue to trace the copper enrichment to the northeast with continued

drilling in 2024.”

Aurora Cu-Mo Project – Summary of Drill Results for A23-013

o Drill hole A23-013 (Figures 2, 3 and 4) commenced on October 19 and ended on November 28 at

981.20m. Coordinates are 8,565,904mN and 189,904mE at an elevation of 3022m. A23-013 was a

vertical hole drilled 515m NW of A23-012.

▪ 0 – 105.50m: Hornfels with moderate chalcopyrite and molybdenite mineralization.

Base of Oxidation at 172m.

▪ 105.50m to 361m: QEFBP (Quartz-eye-feldspar-biotite porphyry – Intermineral) with

weak quartz veining, moderate quartz-sericite alteration, and moderate chalcopyrite

and weak chalcocite-covellite mineralization and weak molybdenite.

▪ 361m to 397.4m: Polymictic breccia with moderate chalcopyrite and weak

molybdenite mineralization.

▪ 397.4m to 423.75m: Hornfels with weak chalcopyrite and molybdenum quartz

veinlets.

▪ 423.75m to 483.95m: Intrusive polymictic breccia with subangular hornfels clasts and

QEFP matrix. Moderate chalcopyrite and weak molybdenite mineralization.

▪ 483.95m to 520.60m: Very fractured/faulted intermineral quartz-eye-feldspar

porphyry (QEFP) with quartz-sericite alteration and weak chalcopyrite and

molybdenite quartz veins.

▪ 520.60m to 528.90m: Intermineral QEFP with weak chalcopyrite-molybdenite

mineralization.

▪ 528.90m to 588m: Early QEFP with FBP with moderate quartz-sericite+muscovite

alteration and moderate quartz-molybdenite veining and weak copper

mineralization.

▪ 588m to 660m: Intermineral QEFP with moderate sheeted quartz molybdenite

veining and moderate secondary biotite alteration plus fluorite.

▪ 660m to 944.80m Early QEFBP with moderate K-feldspar + secondary biotite

alteration, with quartz -sericite and muscovite overprint plus fluorite. Strong sheeted

quartz-molybdenite veins and weak disseminated chalcopyrite.

▪ 944.80m to 981.20m - EOH: Intermineral QEFBP with K-feldspar alteration and

muscovite-fluorite overprint. Moderate molybdenite and weak chalcopyrite

mineralization.

Table 1. Summary of Drill Results for Diamond Drillhole A23-013. All grades are length-weighted averages of samples

within the interval reported.

Hole From To Interval1 Description

Cu

(total) Mo Ag CuEq*

ID m m m % % g/t %

A23-013 0.00 208.00 208.00 Leached and partially leached porphyry 0.11

0.0038 1.46 0.14

208.00 981.20 773.20

Leached and partially leached/weak

enrichment/ primary mineralization in

porphyry and breccia 0.17

0.1221 1.91 0.82

Includes 208.00 530.00 322.00

Weak copper enrichment/Primary

mineralization in porphyry 0.34 0.0278 3.43 0.51

Includes 208.00 360.00 152.00

Weak copper enrichment/Primary

mineralization in porphyry 0.38 0.0056 4.13 0.44

360.00 530.00 170.00

Primary mineralization in breccia and

porphyry 0.30 0.0490 2.78 0.57

530.00 981.20 451.20 Primary mineralization in Porphyry 0.05 0.1883 0.72 1.04

Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut, and core

recovery is assumed to be 100% for the entire drilled length of A23-013 except for intervals from 0.00m to 33.00m and

484.00m to 498.00m where core recovery was below 50% due to leaching and faulting. The project is at an early stage of

exploration and conceptual recoveries of Cu 85%, Mo 82%, and Ag 75% are assigned to the CuEq calculations.

Conversion of metals to an equivalent copper grade based on these metal prices is relative to the copper price per unit

mass factored by conceptual recoveries for those metals normalized to the conceptualized copper recovery. The metal

equivalencies for each metal are added to the copper grade. The formula for this is: CuEq % = Cu% + (Mo% * (Mo

recovery / Cu recovery) * (Mo $ per lb / Cu $ per lb) + (Ag g/t * (Ag recovery / Cu recovery) * (Ag $ per oz/ 31.1034768) /

(Cu $ per lb* 22.04623)).

*Copper equivalent calculations use metal prices of Cu - US$3.34/lb, Mo - US$18/lb and Ag - US$21.87/oz.

1 Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of

mineralization. Mo, Cu and Ag values are uncut.

Table 2: A23-013 Diamond drillhole location, depth, orientation and inclination.

Hole Easting Northing Elevation Length Azimuth Inclination

ID m m m m Degrees Degrees

A23-013 189,904 8,565,904 3022 981.20 0 -90

Co-ordinates are in WGS84 Zone 19S.

Table 3. Summary of significant drill results for diamond drillholes A23-01 to A23-012. All grades are length-weighted

averages of samples within the interval reported.

Hole From To Interval1 Description

Cu

(total) Mo Ag CuEq*

ID m m m % % g/t %

A23-001 22.45 145.80 123.35 Oxidized/Mixed 0.49 0.0036 4.20 0.51

Includes 100.35 145.80 45.45 Enriched 0.64 0.0017 3.40 0.65

100.35 124.30 23.95 Enriched 0.87 0.0024 3.43 0.88

108.65 124.30 15.65 Enriched 1.09 0.0033 3.00 1.11

A23-002 208.00 422.40 214.40 Oxidized/Mixed/Primary 0.35 0.0114 3.95 0.41

Includes 244.00 296.00 52.00 Primary 0.52 0.0131 4.53 0.59

A23-003 38.00 702.30 664.30

Partially leached

/Mixed/Enriched/Primary 0.33 0.0483 3.23 0.58

Includes 132.00 350.00 218.00 Mixed sulphides/Enrichment 0.69 0.0162 5.65 0.77

206.00 350.00 144.00 Enriched 0.75 0.0097 5.87 0.80

258.00 350.00 92.00 Enriched 0.83 0.0071 6.81 0.87

522.00 702.30 180.30 Primary (Moly rich) 0.07 0.1284 0.73 0.74

A23-004 0.00 700.90 700.90 Leached/Mixed/Enriched/Primary 0.18 0.142 2.47 0.92

Includes 110.90 333.00 222.10 Mixed/Enriched/Primary 0.46 0.056 5.88 0.75

110.90 264.00 153.10 Mixed/Enriched 0.53 0.058 7.07 0.83

333.00 421.00 88.00 Primary (Molybdenum rich) 0.05 0.149 0.78 0.83

421.00 502.00 81.00 Primary (Molybdenum rich) 0.12 0.152 0.84 0.91

502.00 700.90 198.90 Primary (Molybdenum rich) 0.02 0.273 0.17 1.44

A23-005 130.00 188.00 58.00 Mixed/Enriched 0.43 0.054 3.38 0.71

188.00 302.00 114.00 Primary 0.14 0.076 1.38 0.54

302.00 472.00 170.00 Primary (Molybdenum rich) 0.1 0.11 1.05 0.67

472.00 693.40 221.40 Primary (Molybdenum rich) 0.03 0.259 0.95 1.38

Table 3 cont. Summary of significant drill results for diamond drillholes A23-01 to A23-012. All grades are length-

weighted averages of samples within the interval reported.

Hole From To Interval1 Description

Cu

(total) Mo Ag CuEq*

ID m m m % % g/t %

A23-006 91.00 708.50 617.50 Mixed/Enriched/Primary 0.17 0.148 1.82 0.94

Includes 91.00 127.00 36.00 Mixed/Enriched 0.62 0.031 9.10 0.78

321.00 708.55 387.55 Primary (Molybdenum rich) 0.07 0.205 0.74 1.14

A23-007 0.00 708.25 708.25 Partially Leached/Primary/Hornfels 0.25 0.0137 3.07 0.32

Includes 206.00 406.00 200.00 Primary/Hornfels 0.37 0.003 3.83 0.39

206.00 254.00 48.00 Primary/Hornfels 0.57 0.002 5.33 0.58

272.00 306.00 34.00 Primary/Hornfels 0.48 0.003 6.33 0.50

A23-008 3.10 703.65 700.55 Primary/Hornfels+Porphyry 0.10 0.0852 1.18 0.54

Includes 402.00 703.65 301.65 Primary/Porphyry 0.03 0.1548 0.26 0.84

A23-009 0.40 790.55 790.15 Primary/Hornfels+Breccia+Porphyry 0.27 0.0095 2.39 0.32

Includes 303.00 617.00 314.00 Primary/Hornfels+Breccia+Porphyry 0.37 0.0144 2.86 0.45

561.00 617.00 56.00 Primary/Porphyry + Breccia 0.52 0.0144 3.46 0.60

A23-010 0 1002.55 1002.55 Leached/Mixed/Enriched/Primary 0.20 0.0838 2.19 0.66

Includes 190.00 218.00 28.00 Mixed/Enriched 0.86 0.0015 8.41 0.94

190.00 315.00 125.00 Mixed/Enriched/Primary 0.43 0.0082 4.65 0.51

543.00 625.00 82.00 Primary - Breccia zone 0.37 0.0618 3.51 0.72

543.00 1002.55 459.55 Primary 0.09 0.1754 0.9 1.01

A23-011 3.10 1081.70 1078.60

Leached+Mixed & Primary

Mineralization/Hornfels+Porphyry 0.16 0.0606 1.69 0.49

Includes 111.00 1081.70 970.70

Mixed & Primary

Mineralization/Hornfels+Porphyry 0.17 0.0667 1.81 0.53

Includes 111.00 524.00 413.00

Mixed & Primary

Mineralization/Hornfels+Porphyry 0.28 0.0112 2.40 0.36

183.00 464.00 281.00

Mixed & Primary

Mineralization/Hornfels+Porphyry 0.31 0.0043 2.40 0.35

Includes 183.00 215.00 32.00

Mixed & Primary

Mineralization/Hornfels+Porphyry 0.44 0.0125 3.69 0.54

524.00 1081.70 557.70 Primary Mineralization/Porphyry 0.09 0.1078 1.38 0.66

Includes 716.00 1081.70 365.70 Primary Mineralization/Porphyry 0.07 0.1403 0.66 0.81

Table 3 cont. Summary of significant drill results for diamond drillholes A23-01 to A23-012. All grades are length-

weighted averages of samples within the interval reported.

Hole From To Interval1 Description

Cu

(total) Mo Ag CuEq*

ID m m m % % g/t %

A23-012 0.00 5.65 5.65 Overburden (not sampled) - - - -

5.65 887.60 881.95

Primary Mineralization/Hornfels +

Porphyry 0.18 0.0514 1.68 0.46

Includes 5.65 22.00 16.35

Primary Mineralization +

Enriched/Breccia 0.49 0.0499 6.53 0.80

Includes 5.65 192.00 186.35

Primary Mineralization/Hornfels +

Porphyry 0.15 0.0643 1.74 0.50

Includes 406.00 544.00 138.00 Primary Mineralization/Porphyry 0.45 0.0390 3.08 0.68

Includes 600.00 887.60 287.60 Primary Mineralization/Porphyry 0.07 0.0962 0.93 0.58

Includes 692.00 887.60 195.60 Primary Mineralization/Porphyry 0.06 0.1083 0.37 0.62

Includes 692.00 808.00 116.00 Primary Mineralization/Porphyry 0.07 0.1253 0.43 0.72

Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo, Cu and Ag values are uncut, and core

recovery is assumed to be 100% for the entire drilled lengths of A23-01 to A23-012. The project is at an early stage of

exploration and conceptual recoveries of Cu 85%, Mo 82%, and Ag 75% are assigned to the CuEq calculations.

Conversion of metals to an equivalent copper grade based on these metal prices is relative to the copper price per unit

mass factored by conceptual recoveries for those metals normalized to the conceptualized copper recovery. The metal

equivalencies for each metal are added to the copper grade. The formula for this is: CuEq % = Cu% + (Mo% * (Mo

recovery / Cu recovery) * (Mo $ per lb / Cu $ per lb) + (Ag g/t * (Ag recovery / Cu recovery) * (Ag $ per oz/ 31.1034768) /

(Cu $ per lb* 22.04623)).

*Copper equivalent calculations use metal prices of Cu - US$3.34/lb, Mo - US$18/lb and Ag - US$21.87/oz.

1 Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of

mineralization. Mo, Cu and Ag values are uncut.

Quality Control and Quality Assurance

DLP Resources Peru S.A.C, a subsidiary of DLP Resources Inc., supervises drilling and carries out sampling of HTW, NTW

and BTW core. Logging and sampling are completed at a secured Company facility situated on the project site. Sample

intervals are nominally 1.5 to 3m in length. Drill core is cut in half using a rotary diamond blade saw and samples are sealed

on site before transportation to the ALS Peru S.A.C. sample preparation facility in Arequipa by Company vehicles and staff.

Prepared samples are sent to Lima by ALS Peru S.A.C. for analysis. ALS Peru S.A.C. is an independent laboratory. Samples

are analyzed for 48 elements using a four-acid digestion and ICP-MS analysis (ME-MS61). In addition, sequential copper

analyses are done where secondary copper mineralization is observed and reports, soluble copper using sulphuric acid

leach, soluble copper in cyanide leach, residual copper and total copper. ALS meets all requirements of International

Standards ISO/IEC 17025:2005 and ISO 9001:2015 for analytical procedures.

DLP Resources independently monitors quality control and quality assurance (“QA/QC”) through a program that includes

the insertion of blind certified reference materials (standards), blanks and pulp duplicate samples. The company is not

aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data

reported from 0.00m to 981.20m in A23-013 except for intervals form 0.00m to 33.00m and 484.00m to 498.00m where

core recovery was below 50% due to leaching and faulting.

New Breccia Zone and Copper Oxide Showings – East of Current Drilling

Results for samples taken across the 500m x 500m grid, 500m further to the southeast and northeast of the current

planned drilling, are still awaited. This area also overlies a similar magnetic anomaly that underlies the main porphyry area.

Grab samples collected in December across this NE area showed veined, brecciated and copper mineralization on surface

(Figures 6, 7 and 8).

Appointment of New Chief Financial Officer

DLP Resources has appointed a new Chief Financial Officer – Scott Davis, CPA CGA, as of January 01, 2024. Scott assumes

the CFO role from Robin Sudo, who is stepping down to focus more on administrative and land management roles for DLP .

We thank Robin Sudo for her time as CFO during the past 4 ½ years.

Scott Davis is a partner of Cross Davis & Company LLP Chartered Professional Accountants, a firm focused on providing

accounting and management services for publicly listed companies. Scott has over 20 years of experience working with

junior exploration public companies and has held several CFO positions with companies listed on the TSX Venture

Exchange. Scott’s experience consists of senior management positions, including Assistant Financial Controller with

Appleby, Auditor with Davidson & Company LLP Chartered Professional Accountants auditing junior exploration

companies, and Accounting Manager with Pacific Opportunity Capital Ltd.

We look forward to having Scott Davis as CFO moving into 2024 and beyond as we continue to develop our flagship

copper-molybdenum project, Aurora over the coming months.

Security Based Compensation Grants

The Company also announces that a total of 191,860 stock options (“Options”), 654,650 restricted share units ("RSUs")

and 1,162,795 deferred share units (“DSUs”) have been granted to certain directors and officers of the Company pursuant

to the Company’s long-term incentive plan.

The options are exercisable for a term of 5 years at an exercise price of $0.43. Each RSU and DSU entitles the holder to

acquire one common share of the Company on vesting. All RSUs will vest one year from the date of grant, and all DSUs will

vest on the date the awardees cease to be eligible persons under the Company’s long term incentive plan.

Aurora Project

Aurora Project is an advanced stage porphyry copper-molybdenum exploration project in the Province of Calca, SE Peru

(Figure 1). The Aurora Project was previously permitted for drilling in 2015 but was never executed. Thirteen historical

drillholes, drilled in 2001 and 2005 totaling 3,900m were drilled over an area of approximately 1000m by 800m, cut

significant intervals of copper and molybdenum mineralization. From logging of the only three remaining holes DDA-01,

DDA-3A and DDA-3 and data now available, it appears that only three of the thirteen holes tested the enriched copper

zone and only one hole drilled deep enough to test the primary copper and molybdenum zone (see DLP Resources Inc.

news release of May 18, 2021).

Salient historic drillhole data of the Aurora Project are:

• 190m @ 0.57% Cu, 0.008% Mo in DDA-1 with a high-grade intercept of 20m @ 1.01% Cu related to a supergene

enrichment zone of secondary chalcocite;

• 142m @ 0.5% Cu, 0.004% Mo in DDA-3;

• 71.7m @ 0.7% Cu, 0.007% Mo in DDA-3A (see historical Focus Ventures Ltd. news release July 11, 2012); and

• One of the historical holes ABC-6 drilled on the edge of the system intersected 78m @ 0.45% Cu and 0.107% Mo

(Figure 2).

A review of the historical drilling indicates that the majority of the thirteen holes were drilled in the leached and partially

leached zones of the porphyry system. Ten of the thirteen holes never fully tested the oxide and secondary enrichment

zone and/or the primary copper zone at depth encountered in DDA-01. Copper-molybdenum mineralization is hosted by

quartz-feldspar porphyries intruded into slates-hornfels and pelitic sandstones belonging to the Ordovician (439 - 463

ma) Sandia Formation.

Figure 1: DLP Project areas in Peru with Aurora Project Shown.

Figure 2: Aurora Project – Plan view showing historic drilling and drilling by DLP in 2022-2023 with A23-012 and A23-013

in red lettering.