STAR - Orion South Diamond Project Core and Geotechnical Drilling Scheduled to Commence Mid-October
1
NEWS RELEASE October 12, 2017
Stock Symbol: SGF: TSX Saskatoon, Saskatchewan
STAR - ORION SOUTH DIAMOND PROJECT
CORE AND GEOTECHNICAL DRILLING SCHEDULED TO COMMENCE MID-OCTOBER
George H. Read, P. Geo., Senior Vice President Exploration and Development of Shore Gold Inc. (“Shore” or the
“Company”) is pleased to announce that Shore and Rio Tinto Exploration Canada Inc. (“RTEC”) have scheduled
an HQ core drilling program, consisting of ten holes and some 2,500 metres of drilling, on the Star Kimberlite, to
commence in mid-October 2017. This core drilling is required to accurately document the internal stratigraphy of
the Star Kimberlite prior to a proposed large dia meter drilling (“LDD”) mini-bulk sampling program, which is
expected to commence in 2018. The core drilling program is being conducted by George Downing Estate Drilling
Ltd. of Grenville, Quebec. Shore and RTEC geologists are responsible for the supervision of the drilling program
and subsequent detailed core logging. In conjuction with this diamond drill program geotechnical investigations
on the overburden are being conducted by Paddock Drilling of Brandon, Manitoba and ConeTech of Richmond,
B.C. The ten hole locations that have recently been selected are in close proximity (10 to 15 metres) to the
underground bulk samples and past 48 inch LDD holes and include areas of significant intersections (80 – 110
metres) of the Early Joli Fou (“EJF”) Kimberlite, the principal economic unit the Indicated Resources previously
estimated by Shore for the Star Kimberlite in December 2015.
Senior Vice President Exploration and Development, George Read, states: “ This core and geotechnical drilling
program is an important precursor to a proposed LDD mini-bulk sampling program scheduled to co mmence in
2018. The selected locations of these core holes will act as pilot holes for the upcoming program."
The Star-Orion South Diamond Project (the "Project") is located in central Saskatchewan some 60 kilometres east
of the city of Prince Albert. The Project is in close proximity to established infrastructure, including paved
highways and the electrical power grid, which provide significant advantages for future mine development. The
Technical Report on the Revised Resource Estimate for the Project dated November 9, 2015 provided an updated
Mineral Resource Estimate for the Star and Orion South kimberlite deposits: Indicated Mineral Resource s of 393
million tonnes containing 55.4 million carats of diamonds at a weighted average price of US$210 per car at. In
addition to the Indicated Mineral Resource Estimate, the Star and Orion South Kimberlites include Inferred
Resources containing 11.5 million carats. Accordingly, the mineral reserves and economic assessment previously
disclosed by Shore for the Project should no longer be relied upon. Shore has granted RTEC an option to earn up
to a 60% interest in the Fort à la Corne mineral properties (including the Project) on the terms and conditions
contained in the Option Agreement (see SGF News Release dated J une 23, 2017). Completion of th e proposed
2018 sampling program (First Option) does not entitle RTEC to an interest in the Fort à la Corne mineral
properties (including the Project).
All technical information in this press release has been prepared under the supervision of George Read, Senior
Vice-President of Exploration and Development, Professional Geoscientist in the Provinces of Saskatchewan and
British Columbia, and Mark Shimell, Project Manager, Professional Geoscientist in the Province of
Saskatchewan, who are the Company’s “Qualified Persons” under the definition of NI 43-101.
Shore is a Canadian based corporation engaged in the acquisition, exploration and development of mineral
properties. Shares of the Company trade on the TSX Exchange under the trading symbol “SGF”.
2
Caution Regarding Forward-Looking Statements
This news release contains forward-looking statements as defined by certain securities laws, including the "safe harbour" provisions of Canadian securities
legislation and the United States Private Securities Litigation Reform Act of 1995. Forward -looking information is often, but not always, identified by the
use of words such as "anticipate", "believe", "expect", "plan", "intend", "forecast", "target", "project", "guidance", "may", "will", "should", "could",
"estimate", "predict" or similar words suggesting future outcomes or language suggesting an outlook. In particular, statements regarding Shore's future
operations, future exploration and development activities or other developme nt plans constitute forward -looking statements. B y their nature, statements
referring to mineral reserves, mineral resources or TFFE constitute forward-looking statements.
Forward-looking statements in this press release include, but are not limited to statements with respect to the proposed core drilling program (including the
number of holes to be drilled, the metres to be drilled, the timing of the drilling and the duration of the program), the pro posed geotechnical program and
Shore and RTEC's objectives for the ensuing year, including the proposed 2018 sampling program.
These forward-looking statements are based on Shore's current beliefs as well as assumptions made by and information currently available to it and involve
inherent risks and uncertainties, both general and specific.
Risks exist that forward -looking statements will not be achieved due to a number of factors including, but not limited to, developments in world diamo nd
markets, changes in diamond prices, risks relating to fluctuations i n the Canadian dollar and other currencies relative to the US dollar, changes in
exploration, development or mining plans due to exploration results and changing budget priorities of Shore or its joint vent ure partners, the effects of
competition in the markets in which Shore operates, the impact of changes in the laws and regulations regulating mining exploration, development, closure,
judicial or regulatory judgments and legal proceedings, operational and infrastructure risks and the additional risks desc ribed in Shore's most recently filed
Annual Information Form, annual and interim MD&A. Shore's anticipation of and success in managing the foregoing risks could c ause actual results to
differ materially from what is anticipated in such forward-looking statements.
Although management considers the assumptions contained in forward -looking statements to be reasonable based on information currently available to it,
those assumptions may prove to be incorrect. When making decisions with respect to Shore, invest ors and others should not place undue reliance on these
statements and should carefully consider the foregoing factors and other uncertainties and potential events. Unless required by applicable securities law,
Shore does not undertake to update any forward-looking statement that is made herein.
For further information: [email protected] or (306) 664-2202
www.shoregold.com
- END -