NEWS RELEASE October 5, 2018

TSX: DIAM Saskatoon, Saskatchewan

STAR - ORION SOUTH DIAMOND PROJECT

COMMENCEMENT OF 2018 TRENCH CUTTER BULK SAMPLING PROGRAM

George H. Read, P. Geo., Senior Vice Presiden t Exploration and Development of Star Diamond Corporation (“Star

Diamond” or the “Corporation”) is pleased to announce that Rio Tinto Exploration Canada (”RTEC”) have

commenced the drilling of the first bulk sample hole on the Star Kimberlite using the Tre nch Cutter Sampling Rig,

which consists of a Bauer BC 50 Cutter mounted on a Bauer MC 128 Duty-cycle Crane. The Trench Cutter Sampling

Rig is designed to sample large volume s of kimberlite to depths of up to 250 metres below surface. The Star

Kimberlite is located within the Corporation’s Star - Orion South Diamond Project, in the Fort à la Corne diamond

district of central Saskatchewan, Canada, on mineral dispositions held 100 percent by Star Diamond. RTEC refers

to Star Diamond’s mineral dispositions in the Fort à la Corne diamond district as Project FalCon.

Bauer Maschinen GmbH (“Bauer”) and Nuna Logistics Limited (“Nuna”) have a contractual arrangement with RTEC

for the manufacture, supply and operation of equipment to be used for the bulk sample progr am. The Trench

Cutter Sampling Rig excavates a rectangular hole of 3.2 by 1.5 metres and each ten metres of advance down hole,

within the kimberlite, will yield some 100 tonnes of sample . The Trench Cutter Sampling Rig’s cutter head is

designed to excavate kimberlite fragment s up to 80 millimetres in diameter, which are pumped to surface ,

directly to a desanding and bagging plant where the - 80 +0.85 millimetre size fraction will be washed and bagged

in preparation for processing plant feed for diamond recov ery. The Trench Cutter Sampling Rig and associated

desanding and bagging circuit have been designed by RTEC to minimize diamond breakage during sample

excavation, washing and bagging. The desanding plant will remove fine kimberlite particles and bentonite slurry

from the material pumped to surface. Well washed kimberlite material will help ensure optimal performance of

RTEC’s proposed on-site bulk sample processing plant. Final diamond recovery is to be conducted by RTEC at a

secure off-site facility.

Senior Vice President Exploration and Development, George Read, states: “ The commencement of the Trench

Cutter Sampling Rig bulk sample program is an important milestone in the evaluation of the Star Kimberlite. The

successful use of this new Trench Cutter Sa mpling Rig technology by RTEC for the recovery of kimberlite bulk

samples, has the ability to revolutionize future bulk sampling and mining of kimberlites, particularly those covered

by substantial depths of overburden. RTEC is optimistic that this new and innovative bulk sampling method will be

successful on the Corporation’s Star - Orion South Diamond Project.”

About Star Diamond Corporation

Star Diamond Corporation is a Canadian based corporation engaged in the acquisition, exploration and

development of mineral properties. Shares of the Corporation trade on the TSX Exchange under the trading

symbol “DIAM”. The Corporation’s Star - Orion South Diamond Project is located in central Saskatchewan some 60

kilometres east of the city of Prince Albert. The Project is in close proximity to established infrastructure, including

paved highways and the electrical power grid, which provide significant advantages for future mine development.

The Corporation recently announced the positive results of the independent Preliminary Economic

Assessment (“PEA”) on the Project. The PEA estimates that 66 million carats of diamonds could be recovered

in a surface mine over a 38-year Project life, with a Net Present Value (“NPV”) (7%) of $2.0 billion after tax, an

Internal Rate of Return (“IRR”) of 19% and an after-tax payback period of 3.4 years after the commencement

2

of diamond production (see News Release dated April 16, 2018). Star Diamond commissioned the PEA and

related Technical Report for the Star and Orion South Kimb erlites and, as such, the PEA and Technical Report are

the sole responsibility of the Corporation. The PEA is based on exploration and evaluation work conducted up to

and including March 2017.

During 2017, the Corporation granted RTEC an option to earn u p to a 60% interest in the Corporation’s Fort à la

Corne mineral properties (including the Star-Orion South Diamond Project) on the terms and conditions contained

in the Option Agreement (see News Release dated June 23, 2017). Completion of the proposed 20 18 sampling

program (First Option) does not entitle RTEC to an interest in the Corporation’s 100 percent held Fort à la Corne

mineral properties (including the Project).

All technical information in this press release has been prepared under the supervision of George Read, Senior

Vice-President of Exploration and Development, a registered Professional Geoscientist in the Provinces of

Saskatchewan and British Columbia and Mark Shimell, Project Manager, a registered Professional Geoscientist in

the Province of Saskatchewan, who are the Corporation’s “Qualified Persons” under the definition of NI 43-101.

Caution Regarding Forward-Looking Statements

This news release contains forward -looking statements as defined by certain securities laws, including the "sa fe harbour" provisions of

Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward -looking information is often,

but not always, identified by the use of words such as "anticipate", "believe", "expect" , "plan", "intend", "forecast", "target", "project",

"guidance", "may", "will", "should", "could", "estimate", "predict" or similar words suggesting future outcomes or language suggesting an

outlook. In particular, statements regarding the Corporation's fu ture operations, future exploration and development activities or other

development plans constitute forward- looking statements. B y their nature, statements referring to mineral reserves, mineral resources,

PEA or TFFE constitute forward-looking statements.

Forward-looking statements in this press release include, but are not limited to, disclosure regarding the economics and project parameters

presented in the PEA, including, without limitation, IRR, NPV and other costs and economic information, carats of diamonds to be

recovered, pre -tax payback period, tonnes of kimberlite to be mined, carats per tonne to be recovered (grade), diamond prices, life of

mine, capital costs, length of pre- production period, possible events, conditions or financial performa nce that is based on assumptions

about future economic conditions and courses of action; the timing and costs of future development and exploration activities on the

Corporation's projects; success of development and exploration activities; permitting time lines and requirements; time lines for further

studies; planned exploration and development of properties and the results thereof; specifications and design of the proposed bulk

sampling plant; and planned expenditures and budgets and the execution thereo f as well as statements with respect to RTEC’s and the

Corporation’s objectives for the ensuing year, including the proposed sampling program.

These forward-looking statements are based on the Corporation's current beliefs as well as assumptions made by and information currently

available to it and involve inherent risks and uncertainties, both general and specific.

Risks exist that forward -looking statements will not be achieved due to a number of factors including, but not limited to, developments in

world diamond markets, changes in diamond prices, risks relating to fluctuations in the Canadian dollar and other currencies relative to the

US dollar, changes in exploration, development or mining plans due to exploration results and changing budget priorities of the Corporation

or its partners, the effects of competition in the markets in which the Corporation operates, the impact of changes in the la ws and

regulations regulating mining exploration, development, closure, judicial or regulatory judgments and legal proceedings, operational and

infrastructure risks and the additional risks described in the Corporation's most recently filed Annual Information Form, annual and interim

MD&A. The Corporation's anticipation of and success in managing the foregoing r isks could cause actual results to differ materially from

what is anticipated in such forward-looking statements.

Although management considers the assumptions contained in forward- looking statements to be reasonable based on information

currently available to it, those assumptions may prove to be incorrect. When making decisions with respect to the Corporation, investors

and others should not place undue reliance on these statements and should carefully consider the foregoing factors and other

uncertainties and potential events. Unless required by applicable securities law, the Corporation does not undertake to update any

forward-looking statement that is made herein.

For further information: [email protected] or (306) 664-2202