Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DEF.V ·

Defiance Silver Announces a Mineral Resource Estimate for the Tepal Project and Filing of Supporting NI 43-101 Technical Report

Resource Estimates Technical Reports (NI 43-101)

Defiance Silver Announces a Mineral

Resource Estimate for the Tepal Project and

Filing of Supporting NI 43-101 Technical

Report

Vancouver, British Columbia--(Newsfile Corp. - December 10, 2024) - Defiance Silver Corp. (TSXV:

DEF) (FSE: D4E) (WKN: A1JQW5) ("

Defiance

" or the "

Company

") is pleased to announce a Mineral

Resource Estimate ("

MRE

") prepared in accordance with the National Instrument 43-101 -

Standard for

Disclosure for Mineral Projects

("

NI 43-101

") for the 100% owned Tepal Gold-Copper Project, located

in the municipality of Tepalcatepec, Michoacán State, in south-western Mexico.

Highlights

Include:

111.67 million tonnes (Mt)

of Measured & Indicated Mineral Resources averaging

0.26 g/t gold

for

926,000 ounces of gold

111.67 Mt

Measured & Indicated Mineral Resources averaging

0.19% copper

for

473.86 million

pounds (Mlb) of copper

111.67 Mt

of Measured & Indicated Mineral Resources averaging

1.55 g/t silver

for

5.58 million

ounces (Moz) of silver

124.36 Mt

of Inferred Mineral Resources averaging

0.25 g/t gold

for

985,000 ounces of gold

124.36 Mt

of Inferred Mineral Resources averaging

0.16% copper

for

451.0 Mlb copper

124.36 Mt

of Inferred Mineral Resources averaging

1.46 g/t silver

for

5.83 Moz of silver

Mineral resources were estimated using a cut-off grade of 13 $/t NSR for the oxidized zone and 15

$/t NSR for the sulphide zone; both the oxide and sulfide estimates lie within the optimized pit shell

Metallurgical testing indicates recoveries of 86% Cu and 54% Au for the North/South Zones and

84% Cu and 50% Au for the Tizate Zone mineralization which would produce a 23% Cu copper

concentrate with gold credits.

The MRE was independently prepared by Micon International Limited ("Micon")

MRE for the Tepal Project

The MRE, independently prepared by Micon's QPs, have classified the mineral resources for the Tepal

Project in the Measured, Indicated and Inferred categories for the Tepal North Zone resources and the

Indicated and Inferred categories for Tepal South Zone and Tizate Zone resources (as defined in the

Canadian Institute of Mining, Metallurgy and Petroleum ("

CIM

") Definition Standards for Mineral

Resources & Mineral Reserves incorporated by reference into NI 43-101) and has an effective date of

October 30, 2024.

Table 1 summarizes the MRE, and Figures 1 to 4 show various plan views and cross sections of the new

block model and/or optimized pit outlines. Tepal North Zone, Tepal South Zone and Tizate deposits are

all part of the Tepal Project; the three deposits have been estimated separately to honour their geometry

and grade characteristics.

Table 1:

Tepal Project Mineral Resource Estimates (rounded values)

Open Pit

Model

Resource

Category

Weathering

Zone

Average Grade

Content Metal

Tonnage

NSR

Cu

Au

Ag

NSR

Cu

Au

Ag

Mt

$/t

%

g/t

g/t

million $

thousand

lb

thousand

oz

thousand

oz

In-Pit Tepal

Measured

Oxide

2.71

31.16

0.31

0.45

1.03

84

18,818

39

90

Sulphide

21.21

38.04

0.24

0.39

0.92

807

111,170

269

627

Indicated

Oxide

3.85

17.51

0.19

0.25

0.80

67

16,508

31

99

Sulphide

28.51

25.35

0.18

0.23

1.22

723

110,322

213

1,114

In-Pit Tepal

North Zone

M+I

Oxide

6.56

23.15

0.24

0.33

0.90

152

35,327

70

189

Sulphide

49.72

30.77

0.20

0.30

1.09

1,530

221,492

481

1,741

Total

56.28

29.88

0.21

0.30

1.07

1,682

256,818

551

1,930

Inferred

Oxide

2.60

12.91

0.15

0.18

1.17

34

8,750

15

97

Sulphide

26.73

23.82

0.17

0.21

1.21

637

101,909

177

1,040

Total

29.33

22.86

0.17

0.20

1.21

670

110,659

192

1,137

In-Pit Tepal

South Zone

Indicated

Oxide

1.22

28.27

0.22

0.40

1.29

34

5,922

16

50

Sulphide

10.78

36.63

0.24

0.36

1.13

395

57,569

124

392

Total

11.99

35.78

0.24

0.36

1.15

429

63,492

140

443

Inferred

Oxide

1.48

10.25

0.11

0.14

0.87

15

3,635

7

41

Sulphide

35.84

35.02

0.18

0.41

1.29

1,255

145,779

477

1,481

Total

37.32

34.04

0.18

0.40

1.27

1,270

149,414

484

1,523

In-Pit Tizate

Zone

Indicated

Oxide

4.10

11.50

0.13

0.16

1.79

47

11,493

21

236

Sulphide

39.30

22.52

0.16

0.17

2.35

885

142,057

214

2,970

Total

43.40

21.47

0.16

0.17

2.30

932

153,549

235

3,206

Inferred

Oxide

4.55

9.58

0.14

0.12

2.19

44

14,450

18

321

Sulphide

53.16

21.15

0.15

0.17

1.67

1,124

176,488

292

2,853

Total

57.71

20.24

0.15

0.17

1.71

1,168

190,938

310

3,174

In-Pit Total

Tepal+Tizate

Measured

Oxide +

Sulphide

23.92

37.26

0.25

0.40

0.93

891

129,988

308

717

Indicated

87.75

24.52

0.18

0.22

1.72

2151

343,872

618

4,861

M+I

111.67

27.25

0.19

0.26

1.55

3,043

473,860

926

5,578

Inferred

124.36

25.00

0.16

0.25

1.46

3,109

451,011

985

5,834

Resource Estimate Notes:

1

.

The effective date of the MRE is October 30, 2024.

2

.

The Mineral Resource Estimate has been stated using a NSR $/t value cut-off grade. As per the economic assumption the cut-off grade is 13

$/t NSR for the oxide zone and 15 $/t for the sulphide zone.

3

.

William Lewis P.Geo., and Chitrali Sarkar M.Sc., P.Geo., of Micon are the QPs responsible for the MRE, as defined in NI 43-101.

4

.

The mineral resources disclosed in this report were estimated using the CIM standards for mineral resource and reserve definitions and the

CIM best practices guidelines for resource estimation.

5

.

The mineral resources reported are contained within the boundaries of a pit-shell derived from the open pit optimizer, assuming surface

mining methods with an overall slope angle of 45 degrees and with the original block model re-blocked to 20m x 20m x 20m. Mineralized

blocks outside of the pit-shell are not considered to be part of the MRE.

6

.

An open pit cut-off grade of 13 $/t NST for the oxide zone and 15 $/t for sulphide zone was calculated for the MRE, using a gold price of

US$ 2,300/oz, a silver price of US$30/oz and a copper price of US$4.8/lb, mining cost US$2.0/t, processing cost US$10/t for oxide and

US$12/t for sulphide, G&A costs of US$3/t. and relevant treatment and refining charges (TCRCs).

7

.

Molybdenum has not been considered to be part of NSR calculation at this time due to insufficient metallurgical testwork to determine the

applicable process recovery.

8

.

The MRE has been classified according to CIM definitions of Measured, Indicated and Inferred Resources for Tepal North Zone and Indicated

and Inferred for Tepal South and Tizate Zones. The Mineral Resource classification has also been visually reviewed to eliminate any"

Spotted Dog" effect, commonly seen in computer-generated models.

9

.

The mineral resource results are presented in-situ within the optimized pit.

10

.

Mineral resources that are not mineral reserves do not have demonstrated economic viability.

11

.

Geological modelling and the MRE have been completed using Leapfrog Geo and Edge software.

12

.

The tonnes and metal contents are rounded to reflect that the numbers are an estimate and any discrepancies in the totals are due to the

rounding effects.

13

.

Micon has not identified any legal, political, environmental, or other factors that could materially affect the potential development of the

mineral resource estimate.

Silver has been included in the current NSR calculation for the first time as it was not reported in any of

the previously released mineral resource estimates. Molybdenum has not been included as part of the

current NSR calculation for the MRE due to insufficient metallurgical testwork to determine the applicable

process recovery. However, molybdenum grades are significant, and the Company will aim to included

this in any future MRE or Preliminary Economic Assessment.

The current mineral resource estimate focuses exclusively on an open pit resource. However, while

performing the interpretation for the Tepal South Zone mineralization, Micon noticed that the mineralized

zone is dipping sharply towards the south at the south-east end of the deposit (Figure 4). The high-grade

material within the low-grade envelopes also follows a similar trend, and it is believed that there could be

underground resource potential for this area. Micon's QPs suggest performing a study using a

combination of open pit and underground mining methods in future resource estimates.

Figure 1

: Plan view of the Tepal Project showing new MRE optimized pit outlines diamond drilling

collars

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2950/233141_07441258949c181d_001full.jpg

Figure 2:

Long section, looking east, along Tepal North Zone block model with optimized pit

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2950/233141_07441258949c181d_002full.jpg

Figure 3:

Cross section (35m) thick along Tepal South Zone block model with optimized pit, showing

future exploration target with deep high-grade intercept of TEP-11-026

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2950/233141_07441258949c181d_003full.jpg

Figure 4:

Long section along Tizate block model and optimized pit

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2950/233141_07441258949c181d_004full.jpg

Mineral Resources Methodology and Assumptions

The 2024 Tepal Project MRE covers the Tepal North Zone, Tepal South Zone and Tizate deposits. The

main steps in the methodology were as follows:

Compiling and validating the diamond drill hole database used for mineral resource estimation.

Interpretation of the mineralized domain, based on lithological and assay information.

Capping outlier values and compositing the database, for the purpose of geostatistical analysis

and performing variography.

Generating the block model and grade interpolation.

Calculation and validation of NSR value.

Validating the criteria for mineral resource classification and eliminating any "Spotted Dog" effect

when classifying the resources".

Assessing the mineral resources with "reasonable prospects for eventual economic extraction" by

selecting appropriate cut-off grades and a producing a reasonable "resource-level" optimized pit-

shell.

Generating a Mineral Resource Estimate statement.

Assessing and identifying the factors that could affect the mineral resource estimate.

The CIM standards require that an estimated mineral resource must have reasonable prospects for

eventual economic extraction. The mineral resource discussed herein has been constrained by

reasonable mining shapes, using economic assumptions appropriate for an open-pit mining scenario.

The potential mining shapes are preliminary and conceptual in nature.

For the Tepal Project, three different pit-shells were optimized, based on NSR values calculated using a

set of economic parameters, depending on the material and mining method. The Tepal North Zone,

South Zone and the Tizate Zone have been treated separately for the Pit Optimization exercise which

has been carried out using Datamine Studio OP software.

The calculated economic cut-off grade of 13 $/t NSR met the definition of potential eventual economic

extraction for oxide zone, and a cut-off grade of 15 $/t NSR met the criterion for the sulphide zone. No

underground resource has been estimated at this time.

Quality Control - Sampling and Laboratory

Geologix Explorations Mexico, a wholly owned Mexican subsidiary of Defiance Silver Corp., acquired

from ValOro Resources in November 2018 (Defiance News Release dated Nov 6

th

2018), established a

QA/QC program for the drilling at the Tepal Project.

The review of sampling and assaying procedures indicates that an adequate system was in place to

maximize the quality of drill hole samples and to assess the reliability, accuracy and precision of

subsequent assay data for use in resource estimation.

The QA/QC program consisted of:

The inclusion of CRM's in sample batches sent to ALS to assess analytical accuracy (1 per 30

samples)

The inclusion of field blanks and pulp blanks to assess laboratory sample preparation and

analytical accuracy (1 per 30 samples)

The inclusion of field duplicates and externally assayed pulp duplicates to assess sample

preparation and precision (1 per 30 samples)

Approximately 20% of all samples submitted to the laboratory were quality control samples.

Micon's QP has reviewed the QA/QC program established by Geologix and believes that the QA/QC

program implemented was of sufficient quality to allow the results to be used as the basis for a mineral

resource estimate.

Geology Summary

Mineralization on the Tepal Project is characteristic of porphyry copper-gold-molybdenum systems. This

is interpreted based on its porphyritic host rocks, its alteration, its copper-gold with minor molybdenum

(and silver) signature, and its quartz-dominated stockwork veinlets and disseminations associated with

sulphide mineralization.

The Tepal Project is located within the Coastal Ranges of southwestern Mexico, south of the Neogene

Trans-Mexican Volcanic Belt. Rocks consist of Cretaceous to early Tertiary intermediate composition

intrusions and weakly metamorphosed sedimentary and volcanic rocks of Cretaceous to Early Tertiary

age. The Jurassic to Cretaceous sedimentary and volcanic rocks are part of an accreted Mesozoic

Island arc volcano-sedimentary assemblage. At least some of the intrusive rocks are coeval with the

volcanic units. Neogene basalts locally overlie basement rocks and represent outliers of the Trans-

Mexican Volcanic Belt.

The Tepal Project is underlain by intrusive, volcanic and sedimentary rocks. Tizate is located within an

intrusive complex mapped at surface. The North Zone and South Zone are hosted within dominantly

volcanic rocks mapped at surface, though various porphyritic intrusions exist at depth, as noted in drill

core.

The structures that dominate at the project and, to an extent regionally, are east-northeast striking, north-

northwest striking, and northeast striking. These faults show clear separation of geological units at

surface and appear to have juxtaposed different erosional levels.

Mineralization on the property consists of zones of stockwork quartz veinlets, sulphide veinlets and

disseminated sulphide mineralization that are hosted within intrusive rocks, volcanic rocks and breccias.

These sulphide-bearing zones contain significant concentrations of copper and gold and, to a lesser

extent, molybdenum and silver. The mineralization is hosted in three distinct deposits: the North Zone

and South Zone with relatively high-grade copper and gold, and Tizate with relatively lower-grade copper

and gold, but higher-grade molybdenum.

There is an oxide horizon and a narrow transition layer present in all deposits on the Tepal Project above

the sulphide mineralization. The depth of oxidation ranges from 20 to 40 m on the hilltops and 0 to 20 m

in the drainages. The transition zone may be up to 15 m thick; however, it is usually significantly less than

this and, in some cases, is absent altogether. The transition is identified by the overlapping presence of

iron oxides and sulphide mineralization.

Primary sulphide mineralization consists dominantly of chalcopyrite and pyrite, with locally significant

bornite and molybdenite. The highest consistent grades of copper and gold mineralization are

associated with low pyrite:chalcopyrite ratios and increasing bornite. Local areas of very high-grade gold

are associated with thicker veins that cross-cut Tizate, and contain pyrrhotite, sphalerite, galena, silver

sulphides, as well as chalcopyrite and pyrite.

Tepal Exploration Potential

Defiance Silver believes that the Tepal Project has excellent exploration upside to increase the size of

the mineralization, by both expanding the known mineralization of North Zone, South Zone and Tizate,

and by exploring for new deposits within the Project. A series of targets have been defined based on

geological, geochemical, geophysical, alteration and structural information. These targets include, but

are not limited to, the following:

Clear areas of open, untested plunges of high-grade porphyry-style mineralization at depth in

known deposits. An example is in the deep South Zone (Figure 3) where drill hole TEP-11-26

returned values of 0.41% Cu and 1.21 g/t Au over 150.8m (from 315.20m to 466.05m). There has

been no previous additional drilling in this area below the resource optimized pit.

Various adjacent and distal untested to poorly tested targets with similar porphyry-style signatures,

defined by multiple exploration criteria within the project

Cross-cutting and/or superimposed different deposit styles (e.g., high-grade polymetallic

intermediate-sulphidation epithermal-style veins, high-sulphidation epithermal-style potential under

advanced argillic alteration, etc.)

Several of these target areas at Tepal are presented below (Figure 5) in plan map view.

Figure 5:

Map of Tepal deposits with various exploration target areas outlined in red

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2950/233141_07441258949c181d_005full.jpg

Recommendations

Further exploration and development of the Tepal Project is recommended. The recommended next

phase of work is: a Lidar topographic survey, detailed mapping and surface sampling, systematic

channel sampling, relogging of a number of holes, relocating the collars for some of the old INCO drill

holes, as well as reprocessing the old geophysical programs. In addition, further resource infill and

expansion drilling is recommended especially into the deep South Zone target area (Figure 3). It is also

recommended the company conduct further metallurgical testwork at the Tepal Project. Data gained

from this recommended work will help the Company with its plan to produce a Preliminary Economic

Assessment during the course of 2025.

Qualified Persons, NI 43-101 Technical Report and MRE

As reported by the Company in its November 29

th

news release, Defiance had commissioned Micon to

prepare a new technical report, including a MRE, associated with the potential development of the Tepal

mineral resource. The technical report, prepared in accordance with the NI 43-101, will be filed today on

SEDAR+ (www.sedarplus.ca) under the Company's issuer profile. The effective date of the current MRE

is October 30, 2024.

The MRE is preliminary in nature and includes inferred mineral resources considered too speculative

geologically to have the economic considerations applied that would enable them to be categorized as

mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic

viability.

The Micon MRE report is titled "

NI 43-101 Technical Report and 2024 Mineral Resource Estimate for

the Tepal Project, Michoacán, Mexico

" dated November 29, 2024, with an effective date of October 30,

2024.

William J. Lewis P.Geo., and Chitrali Sarkar M.Sc., P.Geo., of Micon are the QPs for the MRE

and have reviewed and approved the technical disclosure relating to the MRE contained in this news

release. Richard Gowans P.Eng., of Micon is the QP responsible for reviewing the Tepal metallurgical

work which the MRE is based upon. Mr. Lewis, Ms. Sarkar and Mr. Gowans are all independent of

Defiance and are the Micon QPs for the Technical Report.

About Defiance Silver Corp.

Defiance Silver Corp. (TSXV: DEF) (FSE: D4E) (OTCQX: DNCVF) is an exploration company

advancing the district-scale Zacatecas Project, located in the historic Zacatecas Silver District and the

Tepal Gold/Copper Project in Michoacán state, Mexico. Defiance is managed by a team of proven mine

developers with a track record of exploring, advancing, and developing several operating mines and

advanced resource projects. Defiance's corporate mandate is to advance our projects through capital-

efficient exploration focused on resource growth and new mineral discoveries.

On behalf of Defiance Silver Corp.

"Chris Wright"

CEO & Chairman of the Board

For more information, please contact: Investor Relations at +1 (604) 343-4677 or via email at

[email protected]

www.defiancesilver.com

Suite 2900-550 Burrard Street

Vancouver, BC V6C 0A3

Canada

Tel: +1 (604) 343-4677

Email:

[email protected]

Disclaimer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary Statements Regarding Forward-Looking Information

Information contained in this news release which are not statements of historical facts may be

"forward-looking information" for the purposes of Canadian securities laws. Such forward-looking

information involves risks, uncertainties and other factors that could cause actual results,

performance, prospects and opportunities to differ materially from those expressed or implied by such