Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DEC.V ·

Drilling at the Montrose Zone Returns 16.56 g/t gold over 5.12m.

Drill Results

Decade Resources Ltd.

426 King Street

Stewart, BC

V0T 1W0

TSX.V Trading Symbol: DEC

NEWS RELEASE

March 5, 2019

Drilling at the Montrose Zone Returns 16.56 g/t gold over 5.12m.

Stewart, BC – Decade Resources Ltd (“Decade” or the Company) is pleased to report on the

final assay results from the 2018 drilling on the Red Cliff property. Highlights of drilling

include:

 16.56 g/t gold over 5.12m in DDH-MON-18-50

 13.90 g/t gold over 2.99m in DDH-MON-18-48

 21.90 g/t gold over 1.83 m in DDH-MON-18-58

 8.93 g/t gold over 6.1m in DDH-MON-18-67

 13.58 g/t gold over 3.2 m in DDH-MON-18-46

Observations from this 2018 drilling are summarized below:

 The Waterpump zone extends to depth and up to 150m south of its exposure in

Lydden Creek.

 An east-west dyke swarm up to 150m wide disrupts the north striking Waterpump

zone approximately 150m south of the Lydden Creek canyon. The zone continues

south of the dyke swarm towards the Red Cliff zone.

 Gold occurs in an indicated mesothermal system implying depth extent. Deepest gold

bearing intersection to date is 600m below the highest area containing the Montrose

zone.

 Parallel gold bearing zones are present within the 50m wide deformation zone.

 Gold mineralization is associated with quartz breccias containing semi-massive pyrite,

quartz-pyrite-chalcopyrite stockworks and galena-sphalerite veins and stringers.

 The Waterpump and Montrose zones are located along 400m of length in a gold-

bearing structure that has been identified over at least a 2.3 km length.

 Gold mineralization has been intersected in in a number of different zones over the

2.3 km length.

 Past metallurgical studies indicate gold recoveries of 94.8% and 97.6%, respectively

for 2 separate composites of core samples within drill hole Red Cliff DDH-12-MON-61.

Mineralization is open to depth and along strike. Visual expressions of the drill assay results

on drilling to date can be viewed on the 43-101 report and video shown under the Red Cliff

project on the Company website at www.decaderesources.ca. A plan map of drilling will be

posted on the website. There also appears to be a plunge to the high grade zone towards the

SW which drilling will define. Final Results of the 2018 drilling are shown below:

MONTROSE ZONE

DDH No. From(m) To(m) Core Length(m)** Gold g/t

MON-2018-45 208.90 210.06 1.16 1.78

and 211.89 215.24 3.66 8.94

and 224.54 225.64 1.10 6.33

and 227.44 228.05 0.61 9.06

MON-2018-46 202.41 203.05 0.64 2.06

206.10 207.77 1.68 4.59

210.82 214.02 3.20 13.58

MON-2018-48 225.64 226.25 0.61 3.97

233.84 236.13 2.29 13.90

245.30 246.34 1.04 1.46

251.89 257.32 5.43 3.90

MON-2018-49 233.84 236.89 3.05 1.37

238.45 239.05 0.61 25.10

239.94 245.12 5.18 7.16

257.01 259.91 2.90 9.29

MON-2018-50 236.89 239.94 3.05 1.41

243.96 249.09 5.12 16.56

252.01 253.66 1.65 2.83

268.35 269.27 0.91 13.70

MON-2018-51 274.39 276.86 2.47 3.74

278.08 278.54 0.46 2.26

281.25 281.71 0.46 4.33

294.82 296.74 1.92 17.93

MON-18-52 370.24 371.62 1.37 1.29

380.12 381.62 1.49 4.86

382.84 383.66 0.82 3.26

384.60 385.43 0.82 3.76

390.09 392.38 2.29 1.74

395.43 398.48 3.05 2.88

MON-18-55 215.24 218.29 3.05 2.25

MON-18-56 236.13 240.24 4.12 8.59

Incl. 236.13 237.04 0.91 12.60

Incl. 239.73 240.24 0.52 45.50

242.96 243.29 0.34 4.49

246.04 247.10 1.07 1.36

MON-18-57 242.53 244.51 1.98 1.85

252.74 253.35 0.61 2.08

MON-18-58 307.01 308.84 1.83 21.90

316.46 317.13 0.67 1.36

MON-18-59 235.12 236.89 1.77 2.99

239.09 240.30 1.22 4.36

252.87 253.87 1.01 3.95

258.23 261.28 3.05 7.61

MON-18-60 91.01 92.59 1.59 3.88

114.63 117.68 3.05 1.06

MON-18-61 108.54 111.59 3.05 6.57

114.63 116.62 1.98 1.25

121.65 123.78 2.13 1.05

MON-18-62 148.48 151.07 2.59 2.01

155.43 156.49 1.07 11.28

MON-18-63 95.73 96.65 0.91 8.23

157.62 158.90 1.28 3.27

169.42 172.26 2.84 1.44

193.75 197.26 3.51 5.05

MON-18-64 214.12 214.88 0.76 5.85

220.27 222.56 2.29 1.15

227.74 230.79 3.05 1.87

250.76 255.79 5.03 6.88

Incl. 251.83 254.27 2.44 12.56

MON-18-65 105.49 108.54 3.05 3.37

109.76 114.63 4.87 2.50

117.68 120.67 2.99 3.55

123.17 123.78 0.61 13.01

126.83 129.88 3.05 1.35

MON-18-67 93.60 99.70 6.10 8.93

110.52 112.50 1.98 3.31

117.99 122.10 4.11 2.88

Incl. 117.99 118.90 0.61 6.94

*Holes above have previously been reported.

** True width is believed to be 70 % of intersection length.

Geological modelling has been completed and the Company is examining options to have a

resource completed.

Ed Kruchkowski, P. Geo., a qualified person under National Instrument 43-101, is in charge

of the exploration programs on behalf of the Company and is responsible for the contents of

this release. E. Kruchkowski is not independent of Decade as he is the president of the

Company. Actlabs in Kamloops and Loring Labs in Calgary provide the analysis on the core.

Decade Resources Ltd. is a Canadian based mineral exploration company actively seeking

opportunities in the resource sector. Decade holds numerous properties at various stages of

development and exploration from basic grass roots to advanced ones. Its properties and

projects are all located in the “Golden Triangle” area of northern British Columbia. For a

complete listing of the Company assets and developments, visit the Company website at

www.decaderesources.ca which is presently being updated. For investor information please

call 250-636-2264 or Gary Assaly at 604-377-7969.

ON BEHALF OF THE BOARD OF DECADE RESOURCES LTD.

“Ed Kruchkowski”

Ed Kruchkowski, President

“Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.”

“This news release may contain forward–looking statements. Forward-looking statements address future events and

conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently

anticipated in such statements.”