Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DEC.V ·

Decade Announces Copper Assays from Drilling on near Surface Shallow Copper-Silver Mineralization at the Nobody Knows Copper Project, Terrace BC. Intersect 8.08 M of 2.26% Copper. Plans 2024 Drill Program at the Project

Drill Results Exploration Programs

Decade Announces Copper Assays from

Drilling on near Surface Shallow Copper-Silver

Mineralization at the Nobody Knows Copper

Project, Terrace BC. Intersect 8.08 M of 2.26%

Copper. Plans 2024 Drill Program at the

Project

Stewart, British Columbia--(Newsfile Corp. - January 25, 2024) - Decade Resources Ltd (TSXV" DEC)

("Decade") reports that it has received the assays from the recent drill program at the Nobody Knows No

1 and Nobody Knows No 2 zones at the Copper River project. The project is part of a large claim holding

consisting of 52 contiguous minerals claims which include Nobody Knows, Dardanelle (presently farmed

out) and Treasure Mountain properties totaling 23,016.7 hectares. All 52 mineral claims are 100%

owned by Decade Resources Ltd. The project stretches from 10 to 40 air kilometers east of Terrace,

B.C., on the northern slopes of the Copper River valley. Highlights of the program include:

4410 m of drilling was

completed in 33 drill holes.

The discovery drill holes show similarities to many of the world's major sediment-hosted

copper systems with the association of silver with copper.

The dacitic and syenitic rocks hosting the copper mineralization present have been

sheared with abundant ground up copper mineralization (bornite and chalcocite) in the

fault gouge.

7.19 % Cu equivalent (6.75 % Cu and 50.3 g/t Ag) intersected over 0.76 m in DDH-NB-23-1.

6.73 % Cu equivalent (5.39 % Cu and 155 g/t Ag) intersected over 2.13 m in DDH-NB-23-2.

3.23 % Cu equivalent (2.99 % Cu and 27.3 g/t Ag) intersected over 2.94 m in DDH-NB-23-

12.

2.18 % Cu equivalent (2.05 % Cu and 15 g/t Ag) intersected over 5.74 m in DDH-NB-23-16.

The Company tested approximately 200 m of the zone. Drilling was restricted to the

presently logged areas and the Company has applied for disturbance permits for

forested areas along strike to the Nobody Knows # 2 zone.

For the purposes of

conducting a 2024 drill program at the Copper River project, the details are currently

being planned and finalized.

Mineralization is dominated by bornite, chalcocite and malachite with lesser covellite and chalcopyrite

and little to no pyrite. These sulphides constitute from trace to 5% of the rock forming grains, small blebs

and veinlets which show strong association with silicification and shearing. This type of mineralization

does not contain any appreciable gold but is enriched in silver fitting the model of a red bed type copper-

silver mineralized system.

Assays for the entire 33 drill holes are shown in the table below with assays .0.1 % Cu listed. DDH-23-

NB-1-22 inclusive and DDH-NB-23-31-33 inclusive are over the Nobody Knows # 2 showing. DDH-NB-

23-26 inclusive tested small copper showings along the West Copper River Forestry road and DDH-23-

NB-27-30 inclusive tested the Nobody Knows # 1 showing, 1.2 km east of the Nobody Knows 2 showing.

For the latter 2 drill areas, only drilling on the Nobody Knows # 1 showing intersected short intervals of

higher grade copper within chalcopyrite bearing limestone fragments in a highly epidote altered

andesite. For DDH-23-33 was terminated early due to freeze up conditions. Based on drilling, the

Nobody knows # 2 zone is not related to mineralization at the Nobody Knows # 1 zone as initially

interpreted. The strike zone from the Nobody Knows # 2 zone to the previous drilling at Treasure

Mountain is approximately 20 km east. The Company is currently

assessing targets on Treasure

Mountain to be included in the 2024 drill program.Assays for drilling are as follows:

Drill Hole

From

(m)

To

(m)

Width

(m)

Ag g/t

Cu %

Cu eq %

DDH-NB-23-1

11.13

16.89

5.76

8.18

1.115

1.19

including

14.48

15.27

0.76

50.3

6.75

7.19

and

17.68

23.17

5.49

3.74

0.60

0.63

and

23.17

27.74

4.57

0.81

0.128

0.14

DDH-NB-23-2

6.71

8.23

1.52

3.2

0.326

0.35

and

9.45

17.50

8.08

45.82

1.86

2.26

including

9.45

11.59

2.13

155.0

5.39

6.73

including

15.16

16.16

0.61

13.05

1.47

1.58

and

19.21

28.81

10.95

3.81

0.575

0.61

and

28.81

31.10

2.28

0.74

0.194

0.20

and

32.01

33.84

1.83

1.32

0.169

0.18

DDH-NB-23-3

11.46

14.66

3.20

14.57

1.42

1.55

including

11.16

13.05

1.59

27.8

2.61

2.85

and

14.66

20.09

5.4

2.8

0.29

0.31

and

23.48

31.10

7.62

5.85

0.90

0.95

including

28.62

29.66

3.05

11.65

1.67

1.77

and

35.67

38.72

3.05

0.91

0.12

0.13

and

40.55

42.07

1.52

2.95

0.313

0.34

DDH-NB-23-4

28.56

29.54

1.28

7.6

0.217

0.28

and

32.93

35.98

3.05

2.8

0.43

0.45

and

46.65

52.74

6.09

1.84

0.25

0.27

and

57.04

65.09

8.07

2.45

0.36

0.38

DDH-NB-23-5

36.28

38.72

2.44

6.92

0.841

0.90

DDH-NB-23-6

35.06

38.11

3.05

0.98

0.36

0.37

DDH-NB-23-7

32.32

35.30

2.99

2.02

0.108

0.13

and

35.30

37.20

1.89

5.14

0.608

0.65

and

38.41

39.48

1.07

0.99

0.178

0.19

and

39.48

41.92

2.44

6.85

0.764

0.82

DDH-NB-23-8

60.06

74.09

14.02

5.21

0.56

0.61

and

87.5

90.55

3.05

0.39

0.161

0.16

DDH-NB-23-9

41.16

44.21

3.05

0.4

0.108

0.11

and

62.5

65.55

3.05

0.64

0.147

0.15

and

80.79

88.34

3.05

0.25

0.135

0.14

and

86.89

89.94

3.05

3.66

0.252

0.28

DDH-NB-23-10

37.8

40.85

3.05

2.16

0.212

0.23

and

79.33

80.49

0.76

8.04

1.03

1.10

and

82.99

83.54

0.55

0.37

0.144

0.15

and

86.59

89.63

3.05

0.11

0.124

0.12

and

113.69

115.70

2.01

8.76

1.16

1.24

and

115.70

120.13

4.40

0.91

0.120

0.13

DDH-NB-23-11

7.62

11.59

3.96

6.15

0.827

0.88

DDH-NB-23-12

15.85

25.30

9.45

11.23

1.08

1.18

and

15.85

18.29

2.94

27.3

2.99

3.23

DDH-NB-23-13

6.10

28.66

22.56

6.72

0.820

0.88

including

14.45

16.31

1.86

12.7

1.08

1.19

including

17.9

20.88

2.99

22.6

2.72

2.92

DDH-NB-23-14

6.10

23.17

17.07

7.22

0.80

0.86

including

15.05

17.68

2.59

21.5

2.13

2.32

including

16.51

18.50

0.91

20.5

2.65

2.83

and

26.55

31.71

5.15

2.10

0.339

0.36

and

40.55

43.6

3.05

1.23

0.216

0.23

DDH-NB-23-15

7.32

27.59

20.27

2.63

0.34

0.36

and

45.12

54.27

9.15

1.27

0.166

0.18

and

63.41

64.63

1.22

1.88

0.17

0.19

DDH-NB-23-16

9.45

25.76

16.31

4.00

0.488

0.52

and

27.44

32.93

5.49

0.76

0.166

0.17

and

45.12

72.68

27.44

5.88

0.78

0.83

including

57.62

63.41

5.74

15

2.05

2.18

and

78.66

84.76

6.10

1.15

0.25

0.26

DDH-NB-23-17

61.89

65.40

3.51

4.62

0.704

0.74

including

64.48

65.40

0.91

12.95

2.05

2.16

and

71.04

72.56

1.52

7.24

1.01

1.07

DDH-NB-23-18

103.05

105.88

2.84

1.55

0.324

0.34

and

107.56

112.20

4.63

5.42

0.65

0.70

including

107.56

109.70

2.13

10.6

1.22

1.31

DDH-NB-23-19

32.77

33.99

1.22

1.01

0.352

0.36

and

135.98

139.63

3.65

1.10

0.334

0.34

DDH-NB-23-20

39.02

42.68

3.65

9.67

0.831

0.91

including

40.40

42.68

2.29

15.05

1.24

1.37

and

122.56

122.93

0.37

20.9

2.59

2.77

DDH-NB-23-21

41.16

48.78

7.62

2.17

0.342

0.36

and

62.65

64.33

1.18

1.52

0.272

0.29

and

120.12

121.34

1.22

6.75

0.586

0.64

DDH-NB-23-22

93.90

96.8

2.89

2.67

0.652

0.68

including

95.88

96.8

0.91

7.80

1.75

1.82

and

132.47

133.54

1.07

1.0

0.479

0.49

and

164.02

167.07

3.05

0.73

0.213

0.22

and

168.14

171.65

3.50

2.49

0.623

0.64

including

170.58

171.65

1.07

1.70

1.36

1.37

DDH-NB-23-27

19.21

20.43

1.22

5.52

2.53

2.58

DDH-NB-23-28

19.27

20.18

0.91

44.8

2.15

2.54

and

81.84

84.45

3.05

0.83

0.135

0.14

DDH-NB-23-29

32.62

35.67

3.05

0.4

0.112

0.12

DDH-NB-23-30

17.38

20.43

3.05

0.62

0.20

0.21

DDH-NB-23-31

81.71

85.52

3.81

0.5

0.110

0.11

and

88.11

91.16

3.05

0.24

0.104

0.11

and

94.21

95.27

1.07

1.14

0.10

0.11

DDH-NB-23-32

102.29

105.18

2.9

1.25

0.84

0.85

and

109.15

112.50

3.35

1.33

0.311

0.32

The Company is highly encouraged by the results to date which included the first drill program that was

conducted on the Nobody Knows claim blocks.

All samples were analyzed by ALS

Labs in North Vancouver

BC.

Ed. Kruchkowski, P. Geo., a qualified person under National Instrument 43-101, is in charge of the

exploration programs on behalf of the Company and is responsible for the contents of this release. E.

Kruchkowski is not independent of Decade as he is the president of the Company.

Decade Resources Ltd. is a Canadian based mineral exploration company actively seeking

opportunities in the resource sector. Decade holds numerous properties at various stages of

development and exploration from basic grass roots to advanced ones. Its properties and projects are

all located in the "Golden Triangle" area of northern British Columbia. For a complete listing of the

Company assets and developments, visit the Company website at

www.decaderesources.ca

. For

investor information please call 250- 636-2264 or Gary Assaly at 604-377-7969.

ON BEHALF OF THE BOARD OF DECADE RESOURCES LTD.

"Ed Kruchkowski"

Ed Kruchkowski, President

"Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release."

"This news release may contain forward-looking statements. Forward-looking statements address

future events and conditions and therefore involve inherent risks and uncertainties. Actual results may

differ materially from those currently anticipated in such statements."

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/195624