Doubleview Announces Commissioning of Maiden NI 43-101 Resource Estimate
Doubleview Gold Corp
TSX.V: DBG
OTCQB: DBLVF
FSE: A1W038
470 Granville St. Suite #822
Vancouver, BC, V6C 1V5
T:604.678.3899
F:778.379.8260
W:www.doubleview.ca
Date: 29/Aug/2022
Doubleview Announces Commissioning of Maiden NI 43-101 Resource Estimate
Doubleview Gold Corp (“Doubleview”, the “Company”) (TSX-V:DBG) is pleased to announce it
has engaged ABH Engineering Inc. (“ABH”) to initially complete an internal and independent
resource estimate that will ultimately lead to a NI 43-101 Technical Report, detailing a maiden
resource estimate for the Company’s HAT Polymetallic Deposit in northwest, British Columbia.
Exploration at the HAT Deposit has reached a stage of drilling where an internal resource estimate
would be useful to determine if the requirements for an NI 43-101 Technical Report detailing a
maiden resource estimate, have or will soon be triggered. The objective is to announce an NI 43-
101 compliant, copper and gold equivalent polymetallic resource exceeding 350 million tonnes
(“Mt”), as a minimum criterion to the development of the HAT deposit.
ABH will initially calculate an independent internal resource estimate for the company , allowing
Doubleview to be able to plan how the remainder of the 2022 drill program is to be directed.
If the internal resource estimate reaches or exceeds 350 Mt, it will be deemed that an NI 43-101
Technical Report comprising a maid en resource is necessary. This will allow the Company to
aggressively focus the remainder of its 2022 drilling program towards exploration.
If the internal resource estimate falls below the minimum threshold of 350 Mt, Doubleview will
focus the remainder its 2022 drilling activities, as directed by ABH, explicitly towards expanding
the resource to reach the company’s internal 350 Mt threshold.
Doubleview President and CEO, Mr. Farshad Shirvani stated “We are very pleased that the HAT
polymetallic deposit is entering its next phase of develop ment. Building a polymetallic resource
containing strategic metals in British Columbia, is a necessary step in advancing Canada’s energy
security. Metallurgical testing of scandium continues and if it is deemed to be economically
recoverable, it could substantially increase the economic potential of the Hat deposit as it would
be included with Au, Cu and Co metals in a future updated resource estimate. A maiden resource
estimate will only assess the current drilled volume but will not include the potential areas that are
anticipated to be explored by subsequent drilling programs.”
Qualified Persons:
Damir Cukor, P.Geo. is Doubleview’s Qualified Person with respect to the Hat Project as defined
by National Instrument 43 -101 Standards of Disclosure for Mineral Projects and has reviewed
and approved the technical contents of this news release. He is independent of Doubleview.
About Doubleview Gold Corp
Doubleview Gold Corp., a mineral resource exploration and development company, is based in
Vancouver, British Columbia, Canada, and is publicly traded on the TSX-Venture Exchange [TSX-
V: DBG], [OTCQB: DBLVF], [GER: A1W038], [Frankfurt: 1D4]. Doubleview identifies, acquires
and finances precious and base metal exploration projects in North America, particularly in British
Columbia. Doubleview increases shareholder value through acquisition and exploration of quality
Doubleview Gold Corp
TSX.V: DBG
OTCQB: DBLVF
FSE: A1W038
470 Granville St. Suite #822
Vancouver, BC, V6C 1V5
T:604.678.3899
F:778.379.8260
W:www.doubleview.ca
gold, copper and silver properties and the application of advanced state -of-the-art exploration
methods. The Company’s portfolio of strategic properties provides diversification and mitigates
investment risk.
On behalf of the Board of Directors,
Farshad Shirvani, President & Chief Executive Officer
For further information please contact:
Doubleview Gold Corp
Farshad Shirvani
President & CEO
T: (604) 678-9587
Forward-Looking Statements
Information set forth in this news release contains forward-looking statements that are based on
assumptions as of the date of this news release. These statements reflect management’s current
estimates, beliefs, intentions and expectations. They are not guarantees of future performance.
Doubleview cautions that all forward looking statements are inherently uncertain and that actual
performance may be affected by a number of material factors, many of which are beyo nd
Doubleview’s control. Such factors include, among other things: risks and uncertainties relating to
Doubleview’s limited operating history and the need to comply with environmental and governmental
regulations. Accordingly, actual and future events, conditions and results may differ materially from
the estimates, beliefs, intentions and expectations expressed or implied in the forward-looking
information. Except as required under applicable securities legislation, Doubleview undertakes no
obligation to publicly update or revise forward-looking information.
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS
THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.