Doubleview Drills Strongest Mineralization Discovered so far at Hat Property including 258 meters of 0.31 g/t Gold and 0.47% Copper (1% Cu Eq) in an interval of 450 meters of 0.23 g/t Gold and 0.35% Copper (0.7% Cu Eq)

Drill Results

Doubleview Gold Corp

TSX.V: DBG

OTC: DBLVF

FSE: A1W038

470 Granville St. Suite #822

Vancouver, BC, V6C 1V5

T:604.678.9587

F:604.683.8260

E:[email protected]

W:www.doubleview.ca

Date: 12/May/2020

Doubleview Drills Strongest Mineralization Discovered so far at Hat Property including 258 meters of

0.31 g/t Gold and 0.47% Copper (1% Cu Eq) in an interval of 450 meters of 0.23 g/t Gold and 0.35%

Copper (0.7% Cu Eq)

Doubleview Gold Corp (“Doubleview”, the “Company”) (TSX-V:DBG) is pleased to report that the Company

is preparing to re-start diamond drilling at its Hat porphyry discovery in northwest British Columbia after

intersecting the strongest mineralization yet encountered at the property. Drill hole H-034 was mineralized

from bedrock surface to the total length of 701.2 meter. A 3.6 metre section of core assayed 3.44 g/t Au and

6.61% Cu (10.91% Cu Eq).

Drill hole H-034, that was directed to a geophysical target area, intersected 689 metres of strong gold-copper

mineralization in what appears to be a continuation of the Lisle Zone deposit. As detailed elsewhere in this

release, H-034 intercepted 88.0 meters of 0.68 g/t Au and 1% Cu in a greater interval of 258 metres of 0.31 g/t

Au and 0.47% Cu (1.87% Cu Eq) within a greater interval of 692.3 metres of 0.17 g/t Au and 0.25% Cu. Drill

hole H-034 was collared 360 metres south-southwest of hole H-022 and 469 metres south-southwest of hole

H-023 and expands the dimensions of the Lisle Zone to approximately 920 meters north-south and 650 meters

east-west. The indicated vertical dimension is about 620 metres. The Lisle Zone has not been de-limited in

any direction.

Mr. Farshad Shirvani, Doubleview’s President and CEO, comments that “The large expansion of the Lisle Zone

announced today confirms our belief that our Hat Project is rapidly becoming a very significant large deposit

and that geophysical data from 2018 surveys are reliable guides to mineralization. Since acquiring the Hat

property in 2011, and discovering the Lisle Zone in 2014, we have conducted multiple drill programs and

expanded the mineral zone to its present size and we are approaching a situation where our database of

analyses will permit resource estimations. Our geologic model is supported by drilling and by geophysical

surveys. Several other prospective areas of the property await exploration and we are very confident that not

only will we continue to grow the Lisle, but will make new discoveries”.

Drilling Highlights:

• HAT-034 demonstrates the potential for higher grades and length not only within but also around the

3D IP survey highlighted in previous news releases;

• The Lisle zone of the Hat deposit now measures approximately 650 meters by 920 meters, and depth

has been shown to exceed 600 metres. Most of the 3D IP footprint and the property remain to be

explored;

Doubleview Gold Corp

TSX.V: DBG

OTC: DBLVF

FSE: A1W038

470 Granville St. Suite #822

Vancouver, BC, V6C 1V5

T:604.678.9587

F:604.683.8260

E:[email protected]

W:www.doubleview.ca

• Mineralization remains open in all directions - several large coincident geological, geophysical and

geochemical targets close to the Lisle Zone have yet to be drill-tested.

Recent discoveries have shown the continuity of large scale gold rich porphyry-style mineralization and the

relevance and reliability of the geophysical database. The following is a tabulation of significant assay intercepts

from drill hole H-034:

Table 1 : Significant Assay Results of HAT-034:

DDH

From

(m)

To

(m)

Length

(m)*

CuEq**

(%)

Au

(g/t)

Cu

(%)

Ag

(g/t)

Co

(ppm)

Pd

(g/t)

H034 Entire hole 9.0 701.3 692.3 0.52 0.17 0.25 0.43 0.008 0.025

including 49.0 660.9 611.9 0.59 0.19 0.28 0.48 0.008 0.025

including 210.8 660.9 450.1 0.70 0.23 0.35 0.51 0.008 0.029

And Including 402.3 660.9 258.6 0.92 0.31 0.47 0.76 0.009 0.041

And Including 326.4 561.4 235.0 1.00 0.34 0.51 0.76 0.011 0.033

And Including 452.2 540.2 88.0 1.87 0.68 1.00 1.66 0.017 0.062

And Including 532.0 538.2 6.1 6.79 2.15 4.09 7.98 0.042 0.053

And including 534.5 538.2 3.6 10.91 3.44 6.61 13.00 0.064 0.081

H033*** 38.4 243.3 204.9 0.35 0.14 0.14 0.90 0.006 0.012

Including 234.7 243.3 8.6 0.85 0.54 0.22 0.66 0.007 0.014

* Drill hole intercepts included in this news release are core lengths that may or may not be actual widths of mineralization. It is not possible to

determine actual widths.

** Cu eq are calculated based on Cu eq (%) = ([(%Cu) x (22.0462) x ($2.36) + (g/t/Au) x (1/31.1035) x ($1700)+ (g/t/Ag) x (1/31.1035) x ($15.5) +

(g/t/Pd) x (1/31.1035) x ($2000)+ (%Co) x (22.0462) x ($17)]) ÷ ((22.0462) x ($lbCu))).

*** Due to technical drilling issues Drill hole H-033 was abandoned in strong mineralization at depth 243.3 metres. It was intended to go much

deeper: the company will re-drill this hole in the future.

The company also wishes to report the previously announced results of the 2019 drilling program.

Significant assay results for drill holes H026 and H031 are given below:

DDH

From

(m)

To

(m)

Length

(m)

Cu Eq

(%)

Au

(g/t)

Cu

(%)

Ag

(g/t)

Co

(ppm)

Pd

(g/t)

H026 10.6 522.0 511.4 0.38 0.14 0.19 0.43 67.3 NA

including 10.6 75.5 64.9 0.49 0.17 0.23 1.66 90.9 NA

and 189.8 522.0 332.2 0.45 0.16 0.22 0.27 65.5 NA

and 189.8 310.5 120.7 0.55 0.22 0.25 0.18 86.5 NA

and 252.9 287.0 34.1 0.81 0.28 0.44 0.34 107.9 NA

and 482.5 522.0 39.6 0.61 0.16 0.38 0.54 73.4 NA

846.8 911.3 64.5 0.27 0.09 0.13 0.27 37.6 0.013

Doubleview Gold Corp

TSX.V: DBG

OTC: DBLVF

FSE: A1W038

470 Granville St. Suite #822

Vancouver, BC, V6C 1V5

T:604.678.9587

F:604.683.8260

E:[email protected]

W:www.doubleview.ca

including 879.1 911.3 32.2 0.36 0.13 0.18 0.27 43.8 0.012

H031 14.1 706.0 691.9 0.35 0.11 0.16 0.36 61.6 0.029

including 88.0 527.0 439.0 0.45 0.14 0.22 0.32 76.3 0.018

and 155.4 527.0 371.6 0.51 0.16 0.25 0.33 78.5 0.019

including 175.6 522.1 346.5 0.53 0.17 0.27 0.33 80.7 0.019

and 237.9 531.0 293.2 0.57 0.19 0.29 0.33 77.5 0.021

including 379.0 476.3 97.3 0.74 0.25 0.39 0.43 93.7 0.015

and 423.0 522.1 99.1 0.78 0.23 0.44 0.62 80.5 0.034

and 420.0 476.3 56.3 1.00 0.35 0.52 0.61 112.3 0.021

H032 73.3 101.0 27.7 0.35 0.10 0.11 1.21 136.5 0.013

NA: Not assayed for Pd.

Figure 1 illustrates IP data and drill holes

.

Table 2 : Drill Hole locations of 2019 drilling program are tabulated in the following table:

Drill Hole East (m) North (m) Elevation (m) Azimuth (°) Dip(°) Depth (m)

H026 348028 6454365 1011.5 180 -65 958.75

H031 347692 6453908 947.00 120 -80 741.00

Doubleview Gold Corp

TSX.V: DBG

OTC: DBLVF

FSE: A1W038

470 Granville St. Suite #822

Vancouver, BC, V6C 1V5

T:604.678.9587

F:604.683.8260

E:[email protected]

W:www.doubleview.ca

H032 347692 6453908 947.00 190 -85 111.00

H033 347870 6453938 959.00 175 -80 289.45

H034 347870 6453938 959.00 220 -70 701.25

Note: Assasy results of Drill holes H026, H031, and H032 have been announced in prevous news releases.

Drill Plan s and sections of previous drill results are located on the Company’s website at

https://www.doubleview.ca/projects/hat-gold-rich-copper-porphyry/hat-drill-plan/

Mr. Shirvani also stated that the Company is actively planning and preparing the next phases of exploring the

Hat property but start-up is subject to ensuring the safety of workers operating in a remote location and the

Company’s ability to fund exploration by raising capital in the public market. He also recognizes that the current

difficult times may allow aggressive companies such as Doubleview to acquire new opportunities through

partnerships and other arrangements.

Quality Assurance and Quality Control

Core samples were prepared using PRP-910 package of MSALABS Terrace facility. Each core is dried and

is crushed to 70% passing 2mm. A 250g is taken using an Automatic Splitter from a Boyd Crusher or a Riffle

Splitter to obtain a homogenized, representativ e sample. This sub -sample is then pulverized to 85%

passing a 75-micron screen. All samples are analyzed for Au, Pt, Pd by 30g fire-assay fusion/ICP-ES finish,

using FAS -114 package. A separate 0.25g pulp split is analyzed by Four Acid digestion/ICP -MS fin ish,

reporting 48 elements using IMS-230. Over limit Cu, Pb, and Zn are analyzed by Four Acid digestion/ICPES

finish using ICP -240/ICF-6xx assay package. All analytical and assay procedures are conducted at

independent ISO 17025 and ISO 9001 certified laboratories.

Erik Ostensoe, P. Geo., a consulting geologist and Doubleview’s Qualified Person with respect to the Hat

Project as defined by National Instrument 43 -101 Standards of Disclosure for Mineral Projects, has

reviewed and approved the technical contents of this news release. He is not independent of Doubleview

as he is a shareholder of the company.

Cautionary Note: No mineral resources have been defined at the Hat Property and there is no

assurance that further work will result in the Lisle Zone, or other zones if present, being delineated as

resources.

About Doubleview Gold Corp

Doubleview Gold Corp, a mineral resource exploration and development company, is based in Vancouver,

British Columbia, Canada, and is publicly traded on the TSX Venture Exchange [TSX-V:DBG]. Doubleview

identifies, acquires and finances precious and base metal exploration projects in North America,

particularly in British Columbia. Doubleview increases shareholder value through acquisition and

exploration of quality gold, copper and silver properties and the application of advanced state-of-the–art

Doubleview Gold Corp

TSX.V: DBG

OTC: DBLVF

FSE: A1W038

470 Granville St. Suite #822

Vancouver, BC, V6C 1V5

T:604.678.9587

F:604.683.8260

E:[email protected]

W:www.doubleview.ca

exploration methods. Doubleview’s portfolio of strategic properties provides diversification and mitigates

investment risk.

On behalf of the Board of Directors,

Farshad Shirvani, President & Chief Executive Officer

For further information please contact:

Doubleview Gold Corp

Vancouver, BC Farshad Shirvani

President & CEO

T: (604) 678-9587

E: [email protected]

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on assumptions as of the

date of this news release. These statements reflect management’s current estimates, beliefs, intentions and expectations.

They are not guarantees of future performance. Doubleview cautions that all forward looking statements are inherently

uncertain and that actual performance may be affected by a number of material factors, many of which are beyo nd

Doubleview’s control. Such factors include, among other things: risks and uncertainties relating to Doubleview’s limited

operating history and the need to comply with environmental and governmental regulations. Accordingly, actual and

future events, conditions and results may differ materially from the estimates, beliefs, intentions and expectations

expressed or implied in the forward looking information. Except as required under applicable securities legislation,

Doubleview undertakes no obligation to publicly update or revise forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE

POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS

RELEASE.