Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

DAU.V ·

Desert Gold Preliminary Economic Assessment ("PEA") Progress Update for SMSZ Project in West Mali, Africa

Corporate Updates

Desert Gold Preliminary Economic

Assessment ("PEA") Progress Update for

SMSZ Project in West Mali, Africa

Highlights:

An initial resource estimate will be prepared for Gourbassi West North

Assay results from recently completed drilling include 3.54 g/t Au over 10.15 metres at

Barani East and 6.62 g/t Au over 12 metres at Gourbassi West***

Surrey, British Columbia--(Newsfile Corp. - August 1, 2024) -

Desert Gold Ventures Inc.

(TSXV: DAU)

(FSE: QXR2) (OTCQB: DAUGF) ("Desert Gold" or "the Company") is pleased to provide an update to

its Preliminary Economic Assessment ("PEA") on its SMSZ Project in western Mali, West Africa. Assay

results have been received from the 12 metallurgical drill holes. Three, approximately 220 kg composite

metallurgical samples have been sent to a metallurgical lab in South Africa and a drone elevation and

photo mosaic survey has been flown over the three potential mining areas.

Desert Gold's CEO, Jared Scharf, commented: "I'm very pleased with the progress regarding our PEA.

We got some nice surprises from the metallurgical holes with several unexpected zone extensions and

higher grades than expected at some parts of the Barani East Zone. The possible addition of a new

resource at Gourbassi West North could further enhance project economics as we move forward to

complete the PEA as soon as possible. We look forward to providing additional guidance soon."

Summarized assay composites are presented below from the recently completed drill program (true

widths are 70% to 90% of drilled length):

Barani East

BE-MET2 -

2.61 g/t Au over 14 metres

from 41 metres - oxide

BE-MET3

- 3.54 g/t Au over 10.15 metres

from 123.5 metres - oxide

BE-MET4 - 0.72 g/t Au over 4.5 metres from 69.5 metres - oxide, 1.5 metres of core missing from zone

BE-MET4 -

1.32 g/t Au over 13.5 metres

from 79 meters - oxide,

extra mineralization

BE-MET5 - 0.65 g/t Au over 8.45 metres from 67 metres - oxide

BE-MET5 - 1.05 g/t Au over 6.0 metres from 104 metres - oxide/transition,

extra mineralization

BE-MET6 - 0.97 g/t Au over 5 metres from 20 metres - oxide

Gourbassi West North

FR-MET5 -

0.72 g/t Au over 21.9 metres

from 3.4 metres - transition

FR-MET5 -

1.18 g/t Au over 24.6 metres

from 35.4 metres - fresh rock

FR-MET6 - 0.70 g/t Au over 8.5 metres from 6.0 metres- transition

FR-MET6 -

1.84 g/t Au over 23.5 metres

from 17 metres - mostly fresh rock

FR-MET7 -

0.90 g/t Au over 33.6 metres

from 6.8 metres - mix of oxide and weathered fresh

Gourbassi West

FR-MET1 -

6.62 g/t Au over 12 metres

from 2 metres - oxide (when one sample is capped at 10 g/t Au

as per the mineral resource estimate, then 1.44 g/t Au over 12 metres)***

FR-MET1 -

12.93 g/t Au over 1 metre

from 47 metres - fresh rock

FR-MET2 - 0.47 g/t Au over 15.5 metres from 47 metres - oxide

FR-MET3 - 0.33 g/t Au over 14 metres from 5 metres - oxide

FR-MET4 -

0.51 g/t Au over 36 metres

from 2 metres - oxide

A total of 12, 50 metre to 160-metre-deep holes totaling 905 metres, were completed over the Barani

East (five holes - Figure 2), Gourbassi West (four holes - Figure 3) and Gourbassi West North (three

holes - Figure 3) zones (see Figure 1 for deposit locations). The Barani East and Gourbassi West zones

contain, oxide and transition measured and indicated mineral resources of 131,000 ounces* of gold

grading 1.41 g/t Au and inferred mineral resources of 55,000 ounces* of gold grading 1.22 g/t Au. A

resource estimate will be prepared for the 1.6 km-long Gourbassi West North zone. Leachable, oxide

and transition resources at all three zones will be part of the PEA.

Updated hard boundary mineralized wire frames prepared for the Barani East, Gourbassi West North

and Gourbassi West deposits, will be used in the PEA.

A drone survey was carried out over the three deposit areas to provide accurate topography and a

detailed photomosaic. This data will be used to plan the locations for potential mining infrastructure

including buildings, crushing facilities, leach pads, waste rock, etc.

Next Steps

An initial resource estimate will be prepared for Gourbassi West North.

Heap leach metallurgical test work is expected to take at least 3 months to complete. Once completed,

the gold recovery data will be used to design the open pits and milling facilities for the PEA. Additional,

timed, bottle roll gold recovery tests will be completed for the gold-bearing zones in the fresh rock

portions of the deposits.

Assays for four core holes totaling 729 metres and 71 RC/AC holes, totaling 3,162 metres, are pending

with approximately 80% of the assays received. Assay results from this work will be presented once they

have been validated and interpreted.

This press release contains certain scientific and technical information. The Company is solely

responsible for the contents and accuracy of any scientific and technical information related to it. Don

Dudek, P.Geo. a director of Desert Gold and a Qualified Person under National Instrument 43-101, has

reviewed and approved the scientific and technical information contained in this press release.

Other News

Desert Gold has retained GBC AG ("GBC"), to provide independent research coverage for the

Company. Based in Augsburg Germany, GBC is one of the leading independent research and

investment companies in the European financial community. GBC will provide independent corporate

analysis and research coverage on Desert Gold. The term of the engagement is 12 months effective

from the date of this news release. GBC will receive a fee of EUR 30,000 for its services.

* Desert Gold news releases January 17, 2022 and March 3, 2022

** Desert Gold news release March 25, 2019

ON BEHALF OF THE BOARD

"Jared Scharf"

___________________________

Jared Scharf

President & CEO

ABOUT DESERT GOLD

Desert Gold Ventures Inc. is a gold exploration and development company which controls the 440 km2

SMSZ Project in Western Mali containing Measured and Indicated Mineral Resources of 8.47 million

tonnes grading 1.14 g/t gold totaling 310,300 ounces and Inferred Mineral Resources of 20.7 million

tonnes grading 1.16 g/t gold totaling 769,200 ounces. For further information please visit

www.sedarplus.ca

under the company's profile. Website:

www.desertgold.ca

.

CONTACT

Jared Scharf, President & CEO

Email:

[email protected]

This news release contains forward-looking statements respecting the Company's ability to

successfully complete the Offering. These forward-looking statements entail various risks and

uncertainties that could cause actual results to differ materially from those reflected in these forward-

looking statements. Such statements are based on current expectations, are subject to a number of

uncertainties and risks, and actual results may differ materially from those contained in such

statements, including the inability of the Company to successfully complete the Offering. These

uncertainties and risks include, but are not limited to, the strength of the capital markets, the price of

gold; operational, funding, and liquidity risks; the degree to which mineral resource estimates are

reflective of actual mineral resources; and the degree to which factors which would make a mineral

deposit commercially viable are present; the risks and hazards associated with mining operations.

Risks and uncertainties about the Company's business are more fully discussed in the company's

disclosure materials filed with the securities regulatory authorities in Canada and available at

www.sedarplus.ca

and readers are urged to read these materials. The Company assumes no

obligation to update any forward-looking statement or to update the reasons why actual results could

differ from such statements unless required by law.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release does not constitute an offer to sell or a solicitation of an offer to buy the

securities described herein in the United States. The securities described herein have not been and

will not be registered under the United States securities act of 1933, as amended, and may not be

offered or sold in the United States or to the account or benefit of a U.S. person absent an exemption

from the registration requirements of such act.

Figure 1. Property Compilation Map

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4954/218401_desertgoldfig1.jpg

Figure 2 - Barani East Metallurgical Hole Locations

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4954/218401_aea4b871d4ac8801_003full.jpg

Figure 3 - Gourbassi West and Gourbassi West North Metallurgical Hole Locations

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4954/218401_aea4b871d4ac8801_004full.jpg

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/218401