Desert Gold Preliminary Economic Assessment ("PEA") Progress Update for SMSZ Project in West Mali, Africa
Desert Gold Preliminary Economic
Assessment ("PEA") Progress Update for
SMSZ Project in West Mali, Africa
Highlights:
An initial resource estimate will be prepared for Gourbassi West North
Assay results from recently completed drilling include 3.54 g/t Au over 10.15 metres at
Barani East and 6.62 g/t Au over 12 metres at Gourbassi West***
Surrey, British Columbia--(Newsfile Corp. - August 1, 2024) -
Desert Gold Ventures Inc.
(TSXV: DAU)
(FSE: QXR2) (OTCQB: DAUGF) ("Desert Gold" or "the Company") is pleased to provide an update to
its Preliminary Economic Assessment ("PEA") on its SMSZ Project in western Mali, West Africa. Assay
results have been received from the 12 metallurgical drill holes. Three, approximately 220 kg composite
metallurgical samples have been sent to a metallurgical lab in South Africa and a drone elevation and
photo mosaic survey has been flown over the three potential mining areas.
Desert Gold's CEO, Jared Scharf, commented: "I'm very pleased with the progress regarding our PEA.
We got some nice surprises from the metallurgical holes with several unexpected zone extensions and
higher grades than expected at some parts of the Barani East Zone. The possible addition of a new
resource at Gourbassi West North could further enhance project economics as we move forward to
complete the PEA as soon as possible. We look forward to providing additional guidance soon."
Summarized assay composites are presented below from the recently completed drill program (true
widths are 70% to 90% of drilled length):
Barani East
BE-MET2 -
2.61 g/t Au over 14 metres
from 41 metres - oxide
BE-MET3
- 3.54 g/t Au over 10.15 metres
from 123.5 metres - oxide
BE-MET4 - 0.72 g/t Au over 4.5 metres from 69.5 metres - oxide, 1.5 metres of core missing from zone
BE-MET4 -
1.32 g/t Au over 13.5 metres
from 79 meters - oxide,
extra mineralization
BE-MET5 - 0.65 g/t Au over 8.45 metres from 67 metres - oxide
BE-MET5 - 1.05 g/t Au over 6.0 metres from 104 metres - oxide/transition,
extra mineralization
BE-MET6 - 0.97 g/t Au over 5 metres from 20 metres - oxide
Gourbassi West North
FR-MET5 -
0.72 g/t Au over 21.9 metres
from 3.4 metres - transition
FR-MET5 -
1.18 g/t Au over 24.6 metres
from 35.4 metres - fresh rock
FR-MET6 - 0.70 g/t Au over 8.5 metres from 6.0 metres- transition
FR-MET6 -
1.84 g/t Au over 23.5 metres
from 17 metres - mostly fresh rock
FR-MET7 -
0.90 g/t Au over 33.6 metres
from 6.8 metres - mix of oxide and weathered fresh
Gourbassi West
FR-MET1 -
6.62 g/t Au over 12 metres
from 2 metres - oxide (when one sample is capped at 10 g/t Au
as per the mineral resource estimate, then 1.44 g/t Au over 12 metres)***
FR-MET1 -
12.93 g/t Au over 1 metre
from 47 metres - fresh rock
FR-MET2 - 0.47 g/t Au over 15.5 metres from 47 metres - oxide
FR-MET3 - 0.33 g/t Au over 14 metres from 5 metres - oxide
FR-MET4 -
0.51 g/t Au over 36 metres
from 2 metres - oxide
A total of 12, 50 metre to 160-metre-deep holes totaling 905 metres, were completed over the Barani
East (five holes - Figure 2), Gourbassi West (four holes - Figure 3) and Gourbassi West North (three
holes - Figure 3) zones (see Figure 1 for deposit locations). The Barani East and Gourbassi West zones
contain, oxide and transition measured and indicated mineral resources of 131,000 ounces* of gold
grading 1.41 g/t Au and inferred mineral resources of 55,000 ounces* of gold grading 1.22 g/t Au. A
resource estimate will be prepared for the 1.6 km-long Gourbassi West North zone. Leachable, oxide
and transition resources at all three zones will be part of the PEA.
Updated hard boundary mineralized wire frames prepared for the Barani East, Gourbassi West North
and Gourbassi West deposits, will be used in the PEA.
A drone survey was carried out over the three deposit areas to provide accurate topography and a
detailed photomosaic. This data will be used to plan the locations for potential mining infrastructure
including buildings, crushing facilities, leach pads, waste rock, etc.
Next Steps
An initial resource estimate will be prepared for Gourbassi West North.
Heap leach metallurgical test work is expected to take at least 3 months to complete. Once completed,
the gold recovery data will be used to design the open pits and milling facilities for the PEA. Additional,
timed, bottle roll gold recovery tests will be completed for the gold-bearing zones in the fresh rock
portions of the deposits.
Assays for four core holes totaling 729 metres and 71 RC/AC holes, totaling 3,162 metres, are pending
with approximately 80% of the assays received. Assay results from this work will be presented once they
have been validated and interpreted.
This press release contains certain scientific and technical information. The Company is solely
responsible for the contents and accuracy of any scientific and technical information related to it. Don
Dudek, P.Geo. a director of Desert Gold and a Qualified Person under National Instrument 43-101, has
reviewed and approved the scientific and technical information contained in this press release.
Other News
Desert Gold has retained GBC AG ("GBC"), to provide independent research coverage for the
Company. Based in Augsburg Germany, GBC is one of the leading independent research and
investment companies in the European financial community. GBC will provide independent corporate
analysis and research coverage on Desert Gold. The term of the engagement is 12 months effective
from the date of this news release. GBC will receive a fee of EUR 30,000 for its services.
* Desert Gold news releases January 17, 2022 and March 3, 2022
** Desert Gold news release March 25, 2019
ON BEHALF OF THE BOARD
"Jared Scharf"
___________________________
Jared Scharf
President & CEO
ABOUT DESERT GOLD
Desert Gold Ventures Inc. is a gold exploration and development company which controls the 440 km2
SMSZ Project in Western Mali containing Measured and Indicated Mineral Resources of 8.47 million
tonnes grading 1.14 g/t gold totaling 310,300 ounces and Inferred Mineral Resources of 20.7 million
tonnes grading 1.16 g/t gold totaling 769,200 ounces. For further information please visit
www.sedarplus.ca
under the company's profile. Website:
www.desertgold.ca
.
CONTACT
Jared Scharf, President & CEO
Email:
This news release contains forward-looking statements respecting the Company's ability to
successfully complete the Offering. These forward-looking statements entail various risks and
uncertainties that could cause actual results to differ materially from those reflected in these forward-
looking statements. Such statements are based on current expectations, are subject to a number of
uncertainties and risks, and actual results may differ materially from those contained in such
statements, including the inability of the Company to successfully complete the Offering. These
uncertainties and risks include, but are not limited to, the strength of the capital markets, the price of
gold; operational, funding, and liquidity risks; the degree to which mineral resource estimates are
reflective of actual mineral resources; and the degree to which factors which would make a mineral
deposit commercially viable are present; the risks and hazards associated with mining operations.
Risks and uncertainties about the Company's business are more fully discussed in the company's
disclosure materials filed with the securities regulatory authorities in Canada and available at
www.sedarplus.ca
and readers are urged to read these materials. The Company assumes no
obligation to update any forward-looking statement or to update the reasons why actual results could
differ from such statements unless required by law.
Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release. This news release does not constitute an offer to sell or a solicitation of an offer to buy the
securities described herein in the United States. The securities described herein have not been and
will not be registered under the United States securities act of 1933, as amended, and may not be
offered or sold in the United States or to the account or benefit of a U.S. person absent an exemption
from the registration requirements of such act.
Figure 1. Property Compilation Map
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4954/218401_desertgoldfig1.jpg
Figure 2 - Barani East Metallurgical Hole Locations
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4954/218401_aea4b871d4ac8801_003full.jpg
Figure 3 - Gourbassi West and Gourbassi West North Metallurgical Hole Locations
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4954/218401_aea4b871d4ac8801_004full.jpg
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/218401