Doré Copper Reports High-Grade Copper Results from 2022 Infill Drilling Program at Its Flagship Corner BAY Copper-GOLD Project

Drill Results

PRESS RELEASE

DORÉ COPPER REPORTS HIGH-GRADE COPPER RESULTS FROM 2022 INFILL

DRILLING PROGRAM AT ITS FLAGSHIP CORNER BAY COPPER-GOLD PROJECT

Toronto, Ontario – July 11th, 2022 – Doré Copper Mining Corp. (the "Corporation" or "Doré Copper")

(TSXV: DCMC; OTCQX: DRCMF; FRA: DCM) is pleased to announce the first set of results from its 2022

drilling program of 45,000 meters at its flagship Corner Bay property, located in the Chibougamau mining

camp, approximately 40 kilometers by road from Chibougamau, Québec. As of July 4, 2022, Doré Copper

has completed 32 holes totaling 33,900 meters and is reporting today the results from 13 holes.

This drilling program is part of the feasibility study work to upgrade the Inferred Mineral Resource to the

Indicated category. Another infill drilling program of approximately 2,000 meters is planned at Devlin.

Drilling Highlights

Main Vein above dyke

• CB-22-77: 2.6 meters of 2.33% Cu, and 10.7 g/t Ag

Main Vein below dyke

• CB-22-63: 2.5 meters of 5.07% Cu, 0.17 g/t Au, 14.3 g/t Ag and 889 ppm Mo

• CB-22-64: 13.3 meters of 3.47% Cu, 0.13 g/t Au and 20.0 g/t Ag, including 1.8 meters of 11.07%

Cu, 0.17 g/t Au, 57.3 g/t Ag and 3.1 meters of 5.15% Cu, 0.24 g/t Au and 29.6 g/t Ag

• CB-22-68: 10.9 meters of 4.24% Cu, 0.62 g/t Au, 15.2 g/t Ag, and 1,226 ppm Mo, including 4.0

meters of 7.36 % Cu, 0.45 g/t Au and 23.4 g/t Ag

• CB-22-76: 5.4 meters of 3.37% Cu, 1.0 g/t Au, 23.7 g/t Ag and 1,597 ppm Mo

• CB-22-78: 4.7 meters of 2.3 % Cu, 0.14 g/t Au and 7.7 g/t Ag

Ernest Mast, President and CEO of Doré Copper, commented, “As part of the feasibility study, Dore Copper

is completing a 45,000 meter drilling program in 2022 at its flagship high-grade Corner Bay copper-gold

deposit. Results from the first infill holes are confirming the continuity of the copper mineralization. The next

part of the program will target the infill and expansion drilling of the highest grade part of the deposit where

a number of intercepts returned greater than 8% copper and were announced during the second half of

2021.”

Corner Bay Drilling Program

The 2022 drilling program is designed to infill the Corner Bay deposit at a 50 to 60 meter spacing from

surface to a depth of 1,000 meters and to potentially expand the higher grade copper zone in the Main Vein

above the dyke.

From today’s results, three holes intersected the Main Vein above the dyke and the remaining 10 holes

intersected the Main Vein below the dyke. The results are confirming the continuity of the copper

mineralization at Corner Bay (Figure 1 and Table 1).

2

Corner Bay Deposit

In the Preliminary Economic Assessment announced on May 10, 2022, the Mineral Resource estimate for

Corner Bay contains an Indicated Resource of 2.68 Mt at 2.66% Cu and 0.26 g/t Au containing 157 million

pounds of copper and 22,000 ounces of gold and an Inferred Resource of 5.86 Mt at 3.43% Cu and 0.27

g/t Au containing 443 million pounds of copper and 51,000 ounces of gold, based on a cut-off grade of

1.3% Cu and a copper price of US$3.75 per pound (refer to Technical Report dated June 15, 2022). Silver

and molybdenum have not been included in the previous Mineral Resource estimates. Due to their

consistent presence in the intersections, they will be included in future estimates.

The Corner Bay deposit is hosted by the intrusive Lac Doré Complex on the southern flank of the

Chibougamau anticline. A regional north-northeastern diorite dyke also cuts the area. Several significant

shear zones oriented north-south and northwest-southeast have been identified in the area. The Corner

Bay area is characterized by copper porphyry style mineralization and by copper mineralization in shear

zones commonly associated with dykes related to the Chibougamau Pluton.

Figure 1. Long Section of the Corner Bay Deposit Showing the 2022 Drill Results

3

Table 1. Corner Bay Drill Assays Highlights from the 2022 Drill Program

Hole From (m) To

(m) Width1 (m) Cu (%) Au (g/t) Ag (g/t) Mo

(ppm) Zone

CB-22-75 626.5 628.7 2.2 1.43 0.07 14.0 107 MV above dyke

CB-22-77 549.0 551.6 2.6 2.33 0.08 10.7 382 MV above dyke

CB-22-70 628.5 632.0 3.5 1.03 0.06 7.4 - MV above dyke

CB-22-63 1107.2 1109.7 2.5 5.07 0.17 14.3 889 MV below dyke

CB-22-64 905.8 919.1 13.3 3.47 0.13 20.0 163

MV below dyke

Including

909.3 911.1 1.8 11.07 0.17 57.3 160

914.2 917.3 3.1 5.15 0.24 29.6 420

CB-22-66 895.4 897.8 2.4 1.47 0.18 12.1 365 MV below dyke

CB-22-67 991.8 994.1 2.3 1.49 0.50 5.0 466 MV below dyke

CB-22-68 924.6 935.5 10.9 4.24 0.62 15.2 1,226

MV below dyke

Including

931.5 935.5 4.0 7.36 0.45 23.4 573

CB-22-74 982.6 984.7 2.1 1.19 0.16 4.8 132 MV below dyke

CB-22-76 954.8 960.2 5.4 3.37 1.00 23.7 1,597 MV below dyke

CB-22-78 1049.1 1053.8 4.7 2.30 0.14 7.7 150 MV below dyke

CB-22-79 1051.7 1054.2 2.5 2.00 0.13 6.1 1,011 MV below dyke

CB-22-82 1123.2 1125.6 2.4 2.25 0.05 5.1 335 MV below dyke

1. The true width of the structures intersected is estimated at approximately 55-60% of the downhole width.

Drilling and Quality Control

The Company is using Miikan Drilling as the drilling contractor. Miikan is a joint venture between

Chibougamau Diamond Drilling Ltd., the First Nations community of Ouje-Bougoumou and the First Nations

community of Mistissini both located in the Eeyou Istchee territory.

Sample preparation and analysis within the mineralized zones are completed at AGAT Laboratories in

Mississauga, Ontario. For AGAT, samples are weighed, dried, crushed to 75% passing 2 mm, split to 250 g,

and pulverized to 85% passing 75 microns. Samples are then fire assayed for Au (50 g) and 4 acid digest

ICP-OES finish for 43 elements. Outside the mineralized zones, sample preparation is completed at SGS

Canada Inc. in Val-d’Or, Québec and analysis (fire assay and ICP analysis) is completed at SGS Canada

Inc. in Burnaby, B.C. Samples are weighed, dried, crushed to 75% passing 2 mm, split to 250 g, and

pulverized to 85% passing 75 microns. Samples are then fire assayed for Au (50 g) and sodium peroxide

fusion ICP-MS finish for 34 elements.

QA/QC is done in house by Doré Copper Geologists with oversight from the Vice President Exploration.

The check samples (blanks and standards – 4% of total samples with another 2% of core duplicates) that

were inserted into the sample batches are verified against their certified values and are deemed a pass if

they are within 3 standard deviations of the certified value. The duplicates are evaluated against each other

to determine mineralization distribution (nugget). If there are large discrepancies in the check samples, then

the entire batch is requested to be re-assayed.

Sylvain Lépine, M.Sc, P.Geo., Vice President Exploration of the Corporation and a "Qualified Person" within

the meaning of National Instrument 43-101, has reviewed and approved the technical information contained

in this news release.

4

About Doré Copper Mining Corp.

Doré Copper Mining Corp. aims to be the next copper producer in Québec with an initial production target

of +50 Mlbs of copper equivalent annually by implementing a hub-and spoke operation model with multiple

high-grade copper-gold assets feeding its centralized Copper Rand mill. The Corporation has delivered its

PEA in May 2022 and plans to commence a feasibility study and submit permit applications in Q3 2022.

The Corporation has consolidated a large land package in the prolific Lac Doré/Chibougamau and Joe

Mann mining camps that has produced 1.6 billion pounds of copper and 4.4 million ounces of gold1. The

land package includes 13 former producing mines, deposits and resource target areas within a 60-kilometre

radius of the Corporation’s Copper Rand Mill.

For further information, please contact:

Ernest Mast Laurie Gaborit

President and Chief Executive Officer Vice President, Investor Relations

Phone: (416) 792-2229 Phone: (416) 219-2049

Email: [email protected] Email: [email protected]

Visit: www.dorecopper.com

Facebook: Doré Copper Mining

LinkedIn: Doré Copper Mining Corp.

Twitter: @DoreCopper

Instagram: @DoreCopperMining

1. Sources for historic production figures: Economic Geology, v. 107, pp. 963 –989 - Structural and Stratigr aphic Controls on

Magmatic, Volcanogenic, and Shear Zone -Hosted Mineralization in the Chapais -Chibougamau Mining Camp, Northeaster n

Abitibi, Canada by François Leclerc et al. (Lac Dore/Chibougamau mining camp) and NI 43 -101 Technical Report on the Joe

Mann Property dated January 11, 2016 by Geologica Groupe -Conseil Inc. for Jessie Ressources Inc. (Joe Mann mine).

Cautionary Note Regarding Forward-Looking Statements

This news release includes certain "forward -looking statements" under applicable Canadian securities legislation.

Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by

the use of words such a s "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project",

"target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or

"might" occur or be achieved and other similar expressions and includes the negatives thereof. Specific forward -looking

statements in this press release include, but are not limited to aiming to be the next copper producer in Québec with

an initial production target of +50 Mlbs of copper equ ivalent annually; implementing a hub-and spoke operation model;

plans to commence a feasibility study and submit permit applications in Q3 2022.

All statements other than statements of historical fact included in this release, including, without limitation, statements

regarding the timing and ability of the Corporation to receive necessary regulatory approvals , and the plans, operations

and prospects of the Corporation and its properties are forward -looking statements. Forward -looking statements a re

necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to

known and unknown risks, uncertainties and other factors which may cause actual results and future events to differ

materially from those expr essed or implied by such forward-looking statements. Such factors include, but are not limited

to, actual exploration results, changes in project parameters as plans continue to be refined, future metal prices,

availability of capital and financing on acce ptable terms, general economic, market or business conditions, uninsured

risks, regulatory changes, delays or inability to receive required regulatory approvals, health emergencies, pandemics

and other exploration or other risks detailed herein and from ti me to time in the filings made by the Corporation with

securities regulators. Although the Corporation has attempted to identify important factors that could cause actual

actions, events or results to differ from those described in forward -looking statements, there may be other factors that

cause such actions, events or results to differ materially from those anticipated. There can be no assurance that such

statements will prove to be accurate, as actual results and future events could differ materially fro m those anticipated

in such statements. Accordingly, readers should not place undue reliance on forward -looking statements. The

Corporation disclaims any intention or obligation to update or revise any forward -looking statements, whether as a

result of new information, future events or otherwise, except as required by law.

5

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

news release.