Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CYG.V ·

Dore Copper Announces Management Changes

Management Changes

PRESS RELEASE

DORE COPPER ANNOUNCES MANAGEMENT CHANGES

Toronto, Ontario – February 26, 2024 – Doré Copper Mining Corp. (the " Company" or "Doré Copper")

(TSXV: DCMC; OTCQX: DRCMF; FRA: DCM) announces the resignation of Vice -President, Exploration

Sylvain L épine, effective March 1, 2024. Mr. L épine has been appointed General Manager of Nord du

Québec Investissement Minier (NQIM), a new regional institutional fund sponsored by SDBJ (Société de

développement de la Baie-James) and ARBJ (Administration régionale Baie-James) that will mainly invest

in mining exploration companies in the administrative region of Nord -du-Québec. Mr. Lépine will remain a

Technical Advisor to the Company to ensure a smooth transition during the search for a new Vice President

Exploration.

Ernest Mast, President and CEO of Doré Copper , commented, “On behalf of the Board, we would like to

thank Sylvain for his leadership, dedication and contributions to the Company and we wish him well in his

new role at NQIM . During the period of management transition, Sylvain will remain a consultant to the

Company.”

About Doré Copper Mining Corp.

Doré Copper Mining Corp. aims to be the next copper producer in Québec with an initial production target

of +50 Mlbs of copper equivalent annually by implementing a hub-and-spoke operation model with multiple

high-grade copper-gold assets feeding its centralized Copper Rand mill .1 The Company has delivered its

PEA in May 2022 and is proceeding with a feasibility study.

The Company has consolidated a large land package in the prolific Lac Doré/Chibougamau and Joe Mann

mining camps that has historically produced 1.6 billion pounds of copper and 4.4 million ounces of gold .2

The land package includes 13 former producing mines, deposits and resource target areas within a 60 -

kilometre radius of the Company's Copper Rand Mill.

For further information, please contact:

Ernest Mast Laurie Gaborit

President and Chief Executive Officer Vice President, Investor Relations

Phone: (416) 792-2229 Phone: (416) 219-2049

Email: [email protected] Email: [email protected]

Visit: www.dorecopper.com

Facebook: Doré Copper Mining

LinkedIn: Doré Copper Mining Corp.

Twitter: @DoreCopper

Instagram: @DoreCopperMining

1. Sources for historic production figures: Economic Geology, v. 107, pp. 963 –989 - Structural and Stratigraphic Controls on

Magmatic, Volcanogenic, and Shear Zone -Hosted Mineralization in the Chapais -Chibougamau Mining Camp, Northeastern

Abitibi, Canada by F rançois Leclerc et al. (Lac Dore/Chibougamau mining camp) and NI 43 -101 Technical Report on the Joe

Mann Property dated January 11, 2016 by Geologica Groupe-Conseil Inc. for Jessie Ressources Inc. (Joe Mann mine).

2. Technical report titled "Preliminary Economic Assessment for the Chibougamau Hub -and-Spoke Complex, Québec, Canada"

dated June 15, 2022, in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The Technical

Report was prepared by BBA Inc. with several consulting firms contributing to sections of the study, including SLR Consulting

(Canada) Ltd., SRK Consulting (Canada) Inc. and WSP Inc.

2

Cautionary Note Regarding Forward-Looking Statements

This news release includes certain "forward -looking statements" under applicable Canadian securities legislation.

Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by

the use of words such a s "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project",

"target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or

"might" occur or be achieved and oth er similar expressions and includes the negatives thereof. All statements other

than statements of historical fact included in this news release, including, without limitation, statements with respect to

the timing and ability of the Company to receive necessary regulatory approvals , the Company's ability to meet its

production target, the commencement, timing and completion of a feasibility study, and the plans, operations and

prospects of the Company and its properties are forward -looking statements. Forward -looking statements are

necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to

known and unknown risks, uncertainties and other factors which may cause actual results and future events to differ

materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited

to, actual exploration results, changes in project parameters as plans continue t o be refined, future metal prices,

availability of capital and financing on acceptable terms, general economic, market or business conditions, uninsured

risks, regulatory changes, delays or inability to receive required regulatory approvals, health emergencies, pandemics

and other exploration or other risks detailed herein and from time to time in the filings made by the Company with

securities regulators. Although the Company has attempted to identify important factors that could cause actual actions,

events or results to differ from those described in forward -looking statements, there may be other factors that cause

such actions, events or results to differ materially from th ose anticipated. There can be no assurance that such

statements will prove to be accurate, as actual results and future events could differ materially from those anticipated

in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company

disclaims any intention or obligation to update or revise any forward -looking statements, whether as a result of new

information, future events or otherwise, except as required by law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.