Wednesday, September 16, 2026
MiningNewsTerminal
Wednesday, September 16, 2026 Admin

CVV.V ·

CanAlaska Plans Large 2026 Exploration Program at West McArthur Joint Venture $15 Million Program and Budget to Advance High-Grade Pike Zone Discovery 2026 Program will be Co-Funded on a Pro-Rata Basis

Mergers & Acquisitions Exploration Programs Partnerships & JV

CanAlaska Plans Large 2026 Exploration

Program at West McArthur Joint Venture

$15 Million Program and Budget to Advance High-Grade Pike Zone Discovery

2026 Program will be Co-Funded on a Pro-Rata Basis

Saskatoon, Saskatchewan--(Newsfile Corp. - January 6, 2026) -

CanAlaska Uranium Ltd. (TSXV:

CVV)

(OTCQX: CVVUF) (FSE:

DH7)

("

CanAlaska

" or the "

Company

") is preparing for the start of the

approved $15 million exploration program on the West McArthur Joint Venture project (the "Project") in

the southeastern Athabasca Basin (Figure 1). The 2026 West McArthur program will focus on continued

step outs from the Pike Zone high-grade mineralization to evaluate for additional zones of high-grade

uranium mineralization and continuation of the associated large hydrothermal alteration system. The

West McArthur project, a Joint Venture with Cameco Corporation, is operated by CanAlaska that holds

an estimated 88.86% ownership in the Project as a result of sole-funding exploration in 2025. The 2026

exploration program will be co-funded by Cameco and CanAlaska under the Joint Venture.

Figure 1 – West McArthur Project Location

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2864/279518_a5a1084814546bfc_002full.jpg

2026 West McArthur Exploration Program

During the 2025 exploration program on the West McArthur Project, the Company successfully

completed a winter and summer drilling program. During the winter drilling program, the Company

significantly expanded the high-grade footprint of the Pike Zone and geochemical assay results confirm

the best drillholes to date on the project, including composite intervals in WMA079-01 which intersected

8.6 metres at 34.59% U

3

O

8

, including 5.5 metres at 53.90% U

3

O

8

at the unconformity and WMA076-

01 which intersected

14.8 metres at 14.71% U

3

O

8

, including 5.4 metres at 39.67% U

3

O

8

at the

unconformity (see News Release dated July 17

th

, 2025). During the summer program, the Company

focused on continued step outs from the Pike Zone high-grade mineralization footprint to evaluate for

additional zones of uranium mineralization and continuation of the associated large hydrothermal

alteration system. Results from the summer drill program indicate the strong hydrothermal alteration,

intense structural disruption, and uranium mineralization appear to be increasing to the southwest along

the C10S trend approximately 250 metres away from the high-grade zone. These results highlight the

potential for additional zones of high-grade unconformity-associated uranium mineralization to exist (see

News Release dated November 6

th

, 2025). The mineralized footprint of the Pike Zone at the

unconformity has now been traced over 500 metres with a 140-metre-long high-grade pod outlined by

multiple drill fences.

Figure 2 – 2026 Winter Drill Target Areas on West McArthur Project

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/2864/279518_a5a1084814546bfc_004full.jpg

Starting in early January of 2026, the Company will have three drills working on the West McArthur

Project as part of the $15 million exploration program. The drill rigs will be focused on continued step

outs from the Pike Zone high-grade mineralization to evaluate for additional zones of uranium

mineralization and continuation of the associated large hydrothermal alteration system. During the 2026

winter exploration program, the primary focus will be step outs to the immediate southwest and northeast

along the C10S trend (Figure 2).

To the southwest of the high-grade core, the unconformity target area along the C10S trend was only

sparsely tested over 250 metres strike length during the 2025 summer drill program and remains

completely untested for approximately 800 metres further southwest where alteration and fault structures

were intersected in a previous drill program. No drilling of the C10S corridor has occurred from this area

to the southwest property boundary providing approximately 9 kilometres of untested target corridor.

To the northeast of the Pike Zone along the C10S trend, the unconformity target area remains very

sparsely tested with one drillhole completed approximately 500 metres along strike to the northeast

where alteration and fault structures were intersected in a previous drill program. Beyond this drillhole,

the C10S corridor to the northeast remains poorly tested over approximately six kilometres to the

northeastern property boundary with anomalous alteration, structure, and geochemistry identified on

multiple drill fences between the Pike Zone and 42 Zone.

Outside of the Pike Zone and 42 Zone mineralization areas on the Project, the 16-kilometre-long

C10/C10S conductive corridor remains relatively untested. Based on the recent positive results and the

already proven uranium endowment of the C10 and C10S corridors, the Company believes there is

significant potential for discovery of additional unconformity-related high-grade zones of uranium

mineralization.

As part of the 2026 exploration program, the Company is also completing a ground-based

electromagnetic survey to investigate the extension of the Epp Lake conductor on to the West McArthur

Project. A modern Stepwise Moving Loop Time Domain Electromagnetics survey, using the same

survey design that led to the discovery of the Pike Zone, is planned to advance this part of the West

McArthur Project. The survey will be completed by Abitibi Geophysics.

The geochemical assay results from the summer portion of the 2025 exploration program are pending.

CanAlaska CEO, Cory Belyk, comments,

"It is nice to have our joint venture partner return to funding

the West McArthur program in 2026. The CanAlaska team believes the 2025 program delivered on

our mandates: 1) to delineate and expand the known footprint of the high-grade uranium

mineralization at Pike Zone; and 2) to evaluate the nearby C10S corridor for additional uranium

mineralization. Both mandates were successfully met as part of the 2025 program and the Pike Zone

unconformity uranium mineralization now has a strike length of 500 metres and remains open in both

directions for potential expansion. We look forward to advancing the West McArthur project to the next

level of understanding in 2026."

About CanAlaska Uranium

CanAlaska is a leading explorer of uranium in the Athabasca Basin of Saskatchewan, Canada. With a

project generator model, the Company has built a large portfolio of uranium projects in the Athabasca

Basin. CanAlaska owns numerous uranium properties, totaling approximately 500,000 hectares, with

clearly defined targets in the Athabasca Basin covering both basement and unconformity uranium

deposit potential. The Company has recently concentrated on the West McArthur high-grade uranium

expansion with targets in 2024 and 2025 leading to significant success at Pike Zone. Fully financed for

the upcoming 2026 drill season, CanAlaska is focused on uranium deposit discovery and delineation in

a safe and secure jurisdiction. The Company has the right team in place with a track record of discovery

and projects that are located next to critical mine and mill infrastructure.

The Company's head office is in Saskatoon, Saskatchewan, Canada with a satellite office in Vancouver,

BC, Canada.

The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for

this news release is Nathan Bridge, MSc., P. Geo., Vice-President Exploration for CanAlaska Uranium

Ltd., who has reviewed and approved its contents.

On behalf of the Board of Directors

"Cory Belyk"

Cory Belyk, P.Geo., FGC

CEO, President and Director

CanAlaska Uranium Ltd.

Contacts:

Cory Belyk, CEO and President

General Enquiry

Tel: +1.306.668.6900

Tel: +1.306.668.6915

Email:

[email protected]

Email:

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-looking information

All statements included in this press release that address activities, events or developments that the

Company expects, believes or anticipates will or may occur in the future are forward-looking

statements.

Forward-looking statements are frequently identified by such words as "may", "will",

"plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and

results. Forward-looking statements are based on the current opinions and expectations of

management.

These forward-looking statements involve numerous assumptions made by the

Company based on its experience, perception of historical trends, current conditions, expected future

developments and other factors it believes are appropriate in the circumstances. In addition, these

statements involve substantial known and unknown risks and uncertainties that contribute to the

possibility that the predictions, forecasts, projections and other forward-looking statements will prove

inaccurate, certain of which are beyond the Company's control.

Actual events or results may differ

materially from those projected in the forward-looking statements and the Company cautions against

placing undue reliance thereon.

The Company assumes no obligation to revise or update these

forward-looking statements except as required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/279518