CanAlaska Acquires Nebula Project from F3 Uranium 14,854 Hectare Property Covers Over 40 Kilometres of Key Lake Structural Corridor Multiple Drill Targets, Significant Faults, Alteration, and Uranium Boulder Train Already
CanAlaska Acquires Nebula Project from F3
Uranium
14,854 Hectare Property Covers Over 40 Kilometres of Key Lake Structural Corridor
Multiple Drill Targets, Significant Faults, Alteration, and Uranium Boulder Train Already
Identified
Vancouver, British Columbia--(Newsfile Corp. - January 22, 2024) -
CanAlaska Uranium Ltd. (TSXV:
CVV) (OTCQX: CVVUF) (FSE: DH7)
("CanAlaska" or the "Company") is pleased to announce it has
signed a Property Swap Agreement (the "Agreement") with F3 Uranium Corp. ("F3 Uranium") dated
January 16, 2024 for the acquisition of the Nebula Project (the "Nebula Project") in the Athabasca Basin,
Saskatchewan (Figure 1). The Nebula Project, formerly known as F3 Uranium's Hobo Lake Property, is
located in the southeastern Athabasca Basin and covers 14,854 hectares. The Project is located
approximately 35 kilometres southwest of the Key Lake Mine and Mill complex and covers over 40
kilometres of the interpreted Key Lake structural corridor and associated conductors.
Figure 1 – Nebula Project Location
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2864/195010_9e4f036de4a70b29_001full.jpg
About the Nebula Project
The Nebula Project is located approximately 25 kilometres south of the present-day Athabasca Basin
margin and covers the extension of the Key Lake structural corridor and stratigraphy where it trends
along the western contact of the highly prospective Wollaston-Mudjatik transition zone (Figure 1). The
Project also runs immediately adjacent to Highway 914, providing excellent access to all the claims.
The Nebula Project has been explored in several stages with historical regional and project scale ground
and airborne geophysical surveys, focused prospecting programs targeting lake sediment and boulder
anomalies, and historical shallow diamond drilling. Historical prospecting in the region identified several
uranium occurrences both on and proximal to the project. Most notably, prospecting identified the
Karpinka Lake Boulder train in the northern portion of the Nebula Project.
The Karpinka Lake Boulder
train consists of 111 radioactive boulders, 81 of which returned grab sample results containing
up to 0.39% U
3
O
8
.
In 2017, F3 Uranium completed a VTEM Plus airborne geophysical survey on the Project that, in
conjunction with historical VTEM surveys, identified a series of conductors associated with an arcuate
belt of meta-sedimentary rocks (Figure 2). Follow-up drilling was carried out in 2019, consisting of 1,300
metres in 8 drillholes, that focused on VTEM targets coupled with favourable geology and litho-structural
features in the interpreted Key Lake structural corridor. Graphitic meta-sedimentary rocks with fault
structures were intersected during the program. The drill program was highlighted by drillhole KL19-005
which intersected a
40 metre wide strongly graphitic, chlorite and clay altered fault zone
. This fault
target remains open along strike. Prior to this drill program, this 40-kilometre-long section of the Key
Lake structural
corridor has had
limited drill testing.
Figure 2 – Nebula Conductor Map on Key Lake Corridor
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2864/195010_9e4f036de4a70b29_003full.jpg
The Nebula Project is part of the Company's strategy to increase its landholdings in the infrastructure-
rich southeastern Athabasca Basin region. Land acquisitions in this part of the Athabasca Basin
deliberately focus on staking or acquiring the interpreted structural corridors that are host to, or
geologically similar to, the nearby Key Lake deposits, or corridors with Arrow or Eagle Point basement-
hosted uranium potential. This project is well situated in relation to other projects in the Company's
portfolio and critical infrastructure such as power, road, and the Key Lake mill. The main target areas on
the Nebula Project are centered around the 40-kilometre-long conductive structural corridor which
extends from the Key Lake Mine and Mill complex, down through the Company's Key Lake Extension
and Voyager projects, and onto the Nebula Project. Off property, the interpreted corridor is host to the
Key Lake deposits that consist of a series of east-northeast striking pods of unconformity associated
uranium mineralization, which have historically produced over 150 million lbs U
3
O
8
from the Gaertner
and Deilmann open pits. The Company believes this target corridor represents a vastly underexplored
opportunity for the discovery of basement-hosted uranium deposits like Arrow or Eagle Point.
Initial work by CanAlaska is expected to include property wide compilation of all historical data to
generate further target areas for immediate exploration and drilling follow-up.
CanAlaska CEO, Cory Belyk, comments,
"The Nebula Project deal provides CanAlaska with 100%
ownership in an area with historical exploration which has already identified several significant
uranium occurrences including the large Karpinka Lake Uranium Boulder train. In conjunction with the
Company's Key Extension, Voyager, Enterprise, and Constellation projects, CanAlaska now has a
semi-contiguous, commanding, and dominant land position in an extremely prospective and
underexplored region of the southeastern Athabasca Basin. I am very pleased with the team's effort to
assemble this 100%-owned land position in the last 18 months that realizes management's vision of
focussing our asset portfolio and shareholder investment near critical mine and mill infrastructure. I
thank F3 Uranium management for moving this process forward quickly to help bring value to both
asset portfolios."
Property Swap Details
Pursuant to the Property Swap Agreement, CanAlaska agreed to sell its 100% ownership in the two
mineral claims comprising the Patterson West Property to F3 Uranium in consideration for the Nebula
Project and a 2.5% net smelter returns (NSR) royalty over the Patterson West Property, subject to a buy-
back right permitting F3 Uranium to purchase 40% of the NSR royalty (being a 1% NSR royalty) for
$3,000,000.
Under the same agreement, F3 Uranium agreed to sell its 100% ownership in the 37
mineral claims comprising the Nebula Project to CanAlaska in consideration for the Patterson West
Property and a 2.5% NSR royalty over the Nebula Project, subject to a buy-back right permitting
CanAlaska to purchase 40% of the NSR royalty (being a 1% NSR royalty) for $3,000,000.
Other News
Join the Company's management team at the Vancouver Resource Investment Conference ("VRIC") on
January 21
st
and 22
nd
in Vancouver, BC at booth #635 to discuss this and other exciting projects within
its portfolio of discovery opportunities.
VRIC - 2024
About CanAlaska Uranium
CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7) holds interests in approximately
350,000 hectares (865,000 acres), in Canada's Athabasca Basin - the "Saudi Arabia of Uranium."
CanAlaska's strategic holdings have attracted major international mining companies. CanAlaska is
currently working with Cameco and Denison at two of the Company's properties in the Eastern
Athabasca Basin. CanAlaska is a project generator positioned for discovery success in the world's
richest uranium district. The Company also holds properties prospective for nickel, copper, gold and
diamonds. For further information visit
www.canalaska.com
.
The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for
this news release is Nathan Bridge, MSc., P. Geo., Vice-President Exploration for CanAlaska Uranium
Ltd., who has reviewed and approved its contents.
On behalf of the Board of Directors
"Cory Belyk"
Cory Belyk, P.Geo., FGC
CEO, President and Director
CanAlaska Uranium Ltd.
Contacts:
Cory Belyk, CEO and President
Tel: +1.604.688.3211 x 138
Email:
General Enquiry
Tel: +1.604.688.3211
Email:
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Forward-looking information
All statements included in this press release that address activities, events or developments that the
Company expects, believes or anticipates will or may occur in the future are forward-looking
statements.
These forward-looking statements involve numerous assumptions made by the Company
based on its experience, perception of historical trends, current conditions, expected future
developments and other factors it believes are appropriate in the circumstances. In addition, these
statements involve substantial known and unknown risks and uncertainties that contribute to the
possibility that the predictions, forecasts, projections and other forward-looking statements will prove
inaccurate, certain of which are beyond the Company's control.
Readers should not place undue
reliance on forward-looking statements.
Except as required by law, the Company does not intend to
revise or update these forward-looking statements after the date hereof or revise them to reflect the
occurrence of future unanticipated events.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/195010