Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CUU.V ·

Files Van Dyke Technical Report ON SEDAR

Resource Estimates Technical Reports (NI 43-101)

COPPER FOX

FILES VAN DYKE TECHNICAL REPORT ON SEDAR

Calgary, Alberta

–

May

5

, 2020

.

Copper Fox Metals Inc.

(“Copper Fox” or the “Company”) (TSX

-

V: CUU

–

OTC: CPFXF)

and its wholly owned subsidiary

,

Desert Fox

Van

Dyke Co

.

,

are pleased to re

port that it ha

s

filed

on SEDAR a National Instrument 43

-

101 (“NI 43

-

101”) Technical Report

(the “Technical Report”)

which

includes an updated resource estimation for the Van Dyke copper project located in the

Globe

-

Miami mining

district of Arizona.

The

Technical Report

is titled “Technical Report and Updated Resource Estimate for the Van Dyke Copper

Project” dated May

4

, 2020

and

was prepared by Moose Mountain Technical Services (“MMTS”).

The

effective

date of the Technical Report is January

9

, 2020

and the

resource es

t

imate

w

as

disclosed in a news release dated

March

25, 2020.

Highlights are:

Highlights:

1)

The exploration potential for additional resources is extensive to the south and at depth.

2)

M

etallurgical testwork indicates that the deposit is amenable to recovery

using in

-

situ leaching (ISL) with

a

n estimated

met

allurgical recovery of 90%.

3)

Recommendation

s include

a

combined

eight

-

hole

(4,500m) drilling, metallurgical, geotechnical and

hydrogeological program

estimated to cost

US

$2.13 million

.

4)

Additional engineeri

n

g studies

to update the PEA

.

Elmer B. Stewart, Presi

dent and CEO of Copper Fox stated, “

The

2019 work has

significantly changed the

understanding of the

origin

and mineral potential of the Van Dyke project.

The

highlighted

results of the updated

resourc

e

estimate include

:

1)

an upgrade

of a portion of the

resource

to the Indicated

category

;

2)

a

n overall

50%

increase in soluble copper content

;

and

3)

a potentially 2km long extension of the Van Dyke deposit to the

southwest.

The Technical Report

recommen

d

s

a drilling program

and

additional engineering st

udies

which

highlights the exploration potential to add value by expanding the limits of the Van Dyke project

.

”

The updated

R

esource

E

stimate for the Van Dyke project

is summari

zed

in

the table below

(

s

e

e

n

ews

r

elease

dated March 25, 2020 for details)

:

Resource Estimate for the Van Dyke Deposit, effective date January 9, 2020

:

Cu Metal (Mlbs)

Class

KTonnes

(000)

Rec Cu

(%)

TCu

(%)

ASCu

(%)

CNCu

(%)

Recovery

(%)

Soluble

Cu

Total Cu

Indicated

97,637

0

.

24

0.33

0.23

0.04

90

517

717

Inferred

168,026

0

.19

0.27

0.17

0.04

90

699

1,007

M(lbs)=millions of pounds, (%)=percent, ASCu=acid soluble copper, CNCu=cyanide soluble copper, Rec Cu(%)=estimated recoverabl

e

copper grade, Soluble Cu=sum of ASCu + CNCu, To

t

al Cu=total copper

Notes for Table

:

1.

The “reas

onable prospects for eventual economic extraction” shape has been created based on a copper price of US$2.80/lb,

employment of in

-

situ leach extraction methods, processing costs of US$0.60/lb copper, and all

in operating and sustaining costs

of $US1.25/ton

ne, a recovery of 90% for total soluble copper and an average Specific Gravity of 2.6t/m3.

2.

Approximate drill

-

hole spacings is 80m for Indicated Mineral Resources

3.

The average dip of the deposit within the Ind

i

cated and Inferred Mineral Resource outlines is

20 degrees.

Vertical thickness of

the mineralized envelope ranges from 40m to over 200m.

4.

Numbers may not add due to rounding.

2

Cautionary Note to Investors

:

While the terms “measured (mineral) resource”, “in

d

icated (mineral) resource” and “inferred (minera

l) resource”

are recognized and required by National Instrument 43

-

101

–

Standards of Disclosure for Mineral Projects

,

investors are cautioned that except for that portion of mineral resources classified as

m

ineral reserves, mineral

resources do not have d

emonstrated economic viability. Investors are cautioned not to assume that all or any part

of measured or indicated mineral resources will ever be upgraded into mineral reserves. Additionally, investors

ar

e

cautioned that inferred mineral resources have

a high degree of uncertainty as to their existence, as to whether

they can be economically or legally mined, or will ever be upgraded to a higher category.

I

nvestors are advised that current Mineral Resourc

e

s are not current Mineral Reserves and do not ha

ve

demonstrated economic viability.

Recommended Exploration Program:

The recommended

program is

estimated to cost

$

US

2.13 million

; the main comp

onents of which are outlined

below:

1)

Diamond Drilling & Anal

y

sis: an 8

-

hole

(

4

,

500

m

)

program

to test the extension o

f the

Van Dyke deposit

to the southwest

and

collect

whole

core

samples

for

additional

metallurgical testwork.

2)

Down

-

Hole Geophysics

:

Downhole

acoustic televiewer

survey to collect geotechnical data on

rock mass

characteristics

such as fracture orientations

and density

.

3)

Metallurgical Test

w

ork: 6

-

8 pressure leach tests on whole core from select areas of the deposit

to obtain

additional data on copper recoveries, leach time, reagent consumption and solutio

n chemist

ry.

4)

Hydrogeology: Installation of piezometers

to

obtain additional

data

on

water level

fluctuations and

sampling points

for

ground water geochemi

cal analyses.

Recommendations for Ongoing Engineering Studies

:

Recommendation

s

for ongoing engineerin

g studies

include

:

run a

p

ilot ISL test

;

update the

Cost Estimate,

Geotechnical and Water Management Studies

;

and then revise the Van Dyke ISL PEA project dated December

18, 2015 using the updated

r

esource

e

stimate

.

The estimated cost for this work is

$

US

10

millio

n

.

Exploration Potential

:

U

pd

a

t

ing

the geological model for the Van Dyke deposit

included the

review and compilation of all available

historical geological, geophysical and drilling reports

on work

completed on the Van Dyke project since the late

1960

s.

In 1970,

Occidental Mine

rals identified

the

Azurite target

approximately 2km

south of the Van Dyke

deposit

.

The review completed in 2019 did not locate any reports on activities completed on the Azurite target

,

h

owever,

several map

s

showing the

results o

f an Induced Potential s

urvey and exploration activities for this target were

reviewed.

Historical e

xploration activities

include

:

1)

three drill holes

;

2)

several long surface trenches

;

and

3)

nine outcrops

containing secondary (

azurite

)

copper miner

alization

.

The updated re

source estimate

combined with historical exploration results suggest

s

that the

area of the project

extending from the southwest edge of the

Van Dyke

deposit to the

Azurite target is a high priority exploration

target

, see map b

e

low:

3

Figure 1: Van Dyke exploration potential

Qualified Person

s

:

Sue Bird

–

P.

Eng.

of MMTS is the Qualified Person (“QP”)

who

prepared the mineral resource estimate, T.

Meintjes

–

P.Eng., of MMTS is the QP

who

completed the metallurgical review and analyses and R. Lane

–

P.

Geo., of MMTS

is

th

e QP who

compiled

and reviewed the QA/QC for the resource estimate disclosed in this

4

news release. Ms. Bird, as the

QP

, has approved

the scientific and technical content of this news release. Elmer

B. Stewart, MSc. P. Geol., President of Copper Fox, is t

he

Compan

y’s nominated

QP

pursuant to National

Instrument 43

-

101, Standards for Disclosure for Mineral Projects,

and

has reviewed the scientific and technical

information disclosed in this news release. Mr. Stewart is not independent of Copp

er Fox.

About

Copper F

ox

:

Copper Fox is a Tier 1 Canadian resource company listed on the TSX Venture Exchange (TSX

-

V: CUU) focused

on copper exploration and development in Canada and the United States. The principal assets of Copper Fox and

its wholly ow

ned Canadian a

nd United

States subsidiaries, being Northern Fox Copper Inc. and Desert Fox

Copper Inc., are the 25% interest in the Schaft Creek Joint Venture with Teck Resources Limited on the Schaft

Creek copper

-

gold

-

molybdenum

-

silver project located in

northwestern B

ritish Co

lumbia and a 100% ownership

of the Van Dyke oxide copper project located in Miami, Arizona. For more information on Copper Fox’s other

mineral properties and investments visit the Company’s website at http://www.copperfoxmetals.com.

For addition

al inform

ation

contact

: Investor line 1

-

844

-

464

-

2820 or Lynn Ball, at 1

-

403

-

264

-

2820.

On behalf of the Board of Directors

Elmer B. Stewart

President and Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provi

der (as that t

erm is de

fined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward

-

Looking Information

This news release contains forward

-

looking statements wit

hin the meanin

g of the

Section 27A of the Securities

Act of 1933 and Section 21E of the Securities Exchange Act of 1934, and forward

-

looking information within the

meaning of the Canadian securities laws (collectively, “forward

-

looking information”).

Forward

-

looking

in

formation

is generally identifiable by use of the words “believes,” “may,” “plans,” “will,” “anticipates,”

“intends,” “budgets”,

“could”, “estimates”, “expects”, “forecasts”, “projects” and similar expressions, and the

negative of such expressions.

Forwar

d

-

looking

information in this news release include statements

regarding:

the

exploration potential for additional resource

s;

anticipated

metallurgical recover

ies and methods

;

r

ecommendations

for future work on the Van Dyke project;

potential components and

estimate

d costs of future exploration and

studies; expanding the limits of the Van Dyke project; and statements about Cop

per Fox’s strategy, future

operations, prospects and the plans of management.

Information concerning mineral resource estimates also

may

be de

emed to be forward

-

looking information in that it reflects a prediction of the mineralization that would be

encou

ntered if a mineral deposit were developed and mined.

Information concerning

i

ndicated and inferred

mineral resource estimates also ma

y be deem

ed to be forward

-

looking information in that it reflects a prediction

of the mineralization that would be encoun

tered if a mineral deposit were developed and mined.

In connection with the forward

-

looking information contained in this news release

, Copper

Fox and its subsidiary

have made numerous assumptions

regarding, among other things: the geological, metallurgic

al, engineering,

financial and economic advice that Copper Fox has received is reliable and is based upon practices and

methodologies w

hich are

consistent with industry standards

;

and the stability of economic and market conditions

.

While Copper Fox consi

ders these assumptions to be reasonable, these assumptions are inherently subject to

significant uncertainties and contingencies.

Ad

ditionall

y, there are known and unknown risk factors which could cause Copper Fox’s actual results,

performance or achiev

ements to be materially different from any future results, performance or achievements

expressed or implied by the forward

-

looking info

rmation c

ontained herein. Known risk factors include among

others: the recommended additional metallurgical testwork on

the Van Dyke copper deposit may not result in

5

copper recoveries as favorable as presented in the metallurgical testwork or recover any

copper at

all;

uncertainties relating to interpretation of the previous drill results and the geology, continuity and gra

de of

the

Van Dyke deposit; the recommendations of the Technical Report may not be completed as suggested, or at all;

the

actual minera

lization

in the Van Dyke deposit may not be as favorable as suggested by the resource estimate;

the

indicated and inferre

d resource estimate for the Van Dyke deposit may not be reliable or indicative of any

commercial benefit to Copper Fox;

the possibility

that fut

ure drilling on the Van Dyke project may not occur on a

timely basis, or at all; the need to obtain a

dditional financing to develop properties and uncertainty as to the

availability and terms of future financing; the possibility of delay in explor

ation or

development programs or in

construction projects

;

the uncertainty of meeting anticipated program mile

stones;

uncertainty as to timely

availability of permits and other governmental approvals

;

fluctuations in copper prices and demand; currency

exch

ange rate

s;

and

conditions in the financial markets and the overall eco

nomy may

deteriorate

.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's

continuous dis

closure filings with Canadian securities re

gulatory

authorities at www.sedar.com. All forward

-

looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any

obligation to revise or update any such forwar

d

-

looking information or to publicly announ

ce the re

sult of any

revisions to any of the forward

-

looking information contained herein to reflect future results, events or

developments, except as required by law.