Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

CUU.V ·

Copper Fox Provides Analytical Results from 2024 Geotechnical Drilling Program at Schaft Creek Project

Exploration Programs

DR

COPPER FOX PROVIDES ANALYTICAL RESULTS FROM 2024

GEOTECHNICAL DRILLING PROGRAM AT SCHAFT CREEK PROJECT

Calgary, Alberta – January 16, 2025. Copper Fox Metals Inc. (“Copper Fox” or the “Company”) (TSXV:CUU

| OTCQX:CPFXF | FRA:HPU) is pleased to provide the analytical results for the six (6) geotechnical drillholes

completed at the Schaft Creek project in 2024. The Schaft Creek project is managed through the Schaft Creek Joint

Venture (SCJV). Teck Resources Limited (Teck) is the Operator of the SCJV and holds a 75% interest with Copper

Fox holding the remaining 25% interest. The Schaft Creek deposit, located in northwestern British Columbia , is

one of the largest undeveloped porphyry copper deposits in North America that contains significant gold -

molybdenum-silver by-products.

In 2024, the SCJV approved a C$1 8.9 million budget to advance key project activities including the collection of

geotechnical, metallurgical, engineering, and environmental data and community engagement. The geotechnical

drillholes were designed to collect additional geomechanical, downhole geophysical, structural, and

hydrogeological data to be used to generate updated deposit scale hydrogeological and slope stability models. Three

of the six geotechnical drillholes intersected significant intervals of mineralization.

Highlights and analytical results for the geotechnical drilling program are summarized below.

- Four of the six geotechnical drillholes were completed along the east side of the Paramount zone referred

to as the ‘highwall” and two drillholes were completed on the west side of the Paramount zone.

- The mineralization intersected in DDH SCK-24-472 extended the mineralization in the Paramount zone

approximately 250 meters (m) to the north.

- Analytical highlights include:

o DDH SCK-24-471, intersected a core interval of 134.60m (21.60 to 156.20m) that averaged

0.338% copper, 0.0 37% molybdenum, 0.058 g/t gold and 0. 78 g/t silver that included a 63.80m

core interval (59.20 to 123.00 m) that averaged 0. 437% copper, 0.0 66% molybdenum, 0 .050 g/t

gold and 1.11 g/t silver.

o DDH SCK-24-472, intersected a core interval of 208.64m (406.10 to 614.74m) that averaged

0.253% copper, 0.014% molybdenum, 0.115 g/t gold and 0.88 g/t silver.

o DDH SCK-24-476, intersected a core interval of 202.60m (189.70 to 392. 30m) that averaged

0.324% copper, 0.0 23% molybdenum, 0. 044 g/t gold and 1.68 g/t silver that included a 14.40m

core interval (196.80 to 211.20m) that averaged 0. 634% copper, 0.104% molybdenum, 0.092 g/t

gold and 3.48 g/t silver.

- The other three geotechnical drillholes were not expected to intersect mineralization due to their locations

and returned background metal concentrations.

Elmer B. Stewart, President and CEO of Copper Fox, stated, “While the primary purpose of the geotechnical drilling

program was to augment the geotechnical information for the Schaft Creek deposit, the 2024 drilling expanded the

mineralized envelope of the Schaft Creek deposit to the northwest and intersected significant intervals of “near

surface” higher -grade copper-molybdenum mi neralization that provides additional information on the

distribution/continuity of the mineralization within the Paramount zone.”

Analytical Results

The mineralized intervals reported in this news release were calculated using a 0.10% copper equivalent (CuEq)

cut-off grade. Samples lower than the 0.10% CuEq cut-off were included in the weighted average interval provided

that the sample interval below the cut-off did not exceed 10.0m in core length. Intervals of core lost with zero metal

2

concentrations are included in the interval and weighted average metal grades and CuEq estimation. The weighted

average grades of the mineralized intervals are set out in Table-1:

Table 1: Weighted average grades of mineralized intervals from the 2024 geotechnical drilling program.

DDH ID

From

(m)

To

(m)

Interval

(m)

Cu

(%)

Mo

(%)

Au

(g/t)

Ag

(g/t)

CuEq

(%)

SK-24-471 21.60 156.20 134.60 0.338 0.037 0.058 0.78 0.497

including 59.20 123.00 63.80 0.437 0.066 0.050 1.11 0.694

196.65 243.20 46.55 0.125 0.004 0.043 0.39 0.162

330.50 344.85 14.35 0.193 tr. tr. 0.36 0.206

354.90 377.32 22.42 0.096 tr. tr. 0.22 0.108

SK-24-472 94.00 105.60 11.60 0.342 0.024 0.180 2.36 0.521

139.20 163.60 24.40 0.164 tr. 0.284 1.59 0.320

179.20 216.30 37.10 0.064 0.004 0.078 0.58 0.118

284.13 313.50 29.37 0.041 0.005 0.124 0.58 0.121

351.50 391.98 40.48 0.125 0.014 0.084 0.54 0.216

406.10 614.74 208.64 0.253 0.014 0.115 0.88 0.361

including 442.50 507.98 65.48 0.428 0.020 0.221 1.61 0.614

SK-24-476 24.50 169.13 144.63 0.344 0.012 0.041 1.27 0.409

including 24.50 81.50 57.00 0.487 0.012 0.052 1.28 0.560

including 91.50 110.05 18.55 0.492 0.013 0.045 2.34 0.567

189.70 392.30 202.60 0.324 0.023 0.044 1.68 0.433

including 196.80 211.20 14.40 0.634 0.104 0.092 3.48 1.051

including 264.00 294.10 30.10 0.432 0.040 0.051 2.91 0.606

including 354.85 371.50 16.65 0.602 0.030 0.041 1.55 0.752

402.00 426.00 24.00 0.137 0.002 tr. 0.59 0.153

Notes: The mineralized intervals listed in the above table are down hole drill core intervals. Drilling data is insufficient to determine the

true width of the mineralized zone. CuEq = copper equivalent, % = percent, g/t = grams per tonne, m = meter, tr. = trace. Copper equivalent

grades are for comparative purposes onl y and based on calculating the CuEq on an individual sample basis using 100.0% of the copper

content plus 71% of the gold content, 60.1% of the molybdenum content and 40.3% of the silver content . Metal prices used in the copper

equivalent calculation are copper US$ 4.00/lb, gold US$1,900/oz, molybdenum US$23.00/lb and silver US$26.00/oz. Mo concertation less

than 0.003% and gold concentration less than 0.020 g/t are listed as trace. The CuEq (%) are based on the weighted average of the individual

CuEq for each sample over the interval of interest.

Drill collar information and locations of the 2024 geotechnical drillholes is set out in Table 2 and Figure 1 below.

Table 2: Drill collar information for the 2024 geotechnical drilling program.

DDH ID Easting Northing Elevation Azimuth Dip

Total Depth

(m)

SK-24-471 379478 6360338 903.50 290 -65 380.00

SK-24-472 379538 6361053 1165.70 290 -65 624.00

SK-24-473 379986 6360575 1089.40 90 -75 377.00

SK-24-474 380719 6360710 1423.60 220 -65 194.50

SK-24-475 380532 6361102 1569.70 330 -70 381.50

SK-24-476 379481 6360334 903.50 200 -64 516.50

3

The drillhole locations and hole traces of the 2024 geotechnical drilling program are shown in Figure-1:

Figure 1: Plan map of the Schaft Creek deposit showing locations of the 202 4 drillholes, the Five-Year pit shell and Life-of-Mine pit shell

as set out in the “Schaft Creek Preliminary Economic Assessment, an NI 43-101 Technical Report”, with an effective date of September 10,

2021, prepared by Tetra Tech Canada Inc., H. Ghaffari, M.Sc., P.Eng, et al as Qualified Persons.

4

Discussion of Mineralized Drillhole Results

DDH SCK-24-471 was drilled to the northwest and is located on the western side of the Paramount zone . The

higher-grade copper-molybdenum mineralization (core interval from 21.60 to 156.20m) starts at the

overburden/bedrock contact. Three additional intervals of low-grade mineralization were intersected at depth.

DDH SCK-24-472 located at the north end of the Paramount zone was drilled to the west. Due to intensely broken

ground conditions, core recovery started at a downhole depth of 94.0m. In the core interval 94.0 0-391.98m five

intervals ranging from 11.60m to 40.48m of copper-gold-molybdenum mineralization were intersected. The most

significant interval of copper-gold-molybdenum occurs in the core interval 412.0-614.74m and includes a 65.48m

interval of higher-grade copper-molybdenum-gold mineralization.

DDH SCK-24-476 was drilled to the southwest and intersected two significant intervals of mineralization. The

upper mineralized interval (24.5-169.13m) contains two intervals of higher-grade copper mineralization. The lower

interval (189.70-392.50m) contains three intervals of higher-grade copper-molybdenum mineralization and is

underlain by an interval (402.00-426.00m) of significantly lower-grade copper mineralization.

Diamond Drilling and Sampling Procedures

The geotechnical drilling was completed using PQ and HQ diameter core. Overall core recovery was estimated to

be greater than 90%. After cutting with a diamond saw, one half of the core was collected for sample preparation

and analysis and the other half was retained for future reference. Sample intervals were selected to not cross major

lithological or hydrothermal alteration changes and ranged from 0.76 to 3.00m in length, with most intervals being

an average of 2.0m.

Quality Control

The SCJV follows a rigorous Quality Assurance/Quality Control program. In total, 1,253 samples were submitted

as part of the drill core analysis including 1 ,037 split-core samples, 89 commercial certified reference materials

(CRMs) standards, 38 field blanks, 26 pulp duplicates, 38 field duplicates and 25 crush duplicates. The matrix

material of the CRMs is matched to the Schaft Creek deposit geology. All standards used are certified for 4 -acid

digestion and Au by fire assay. Four standards, one field blank, and three duplicates (crush, field, and pulp) were

inserted to each batch of 100 samples. The insertion rate of the CRMs during 2024 was 7:1.

Analytical data for each standard was reviewed on a batch -by-batch basis. Only the performance of Au (by Au -

ICP21), Cu, Mo, and Ag (ME -MS61) were considered in the failure criteria. The performance of non -economic

elements As, Fe, Mg (ME-MS61), Total S by IR08, and Total Cu by sequential leach (Cu-PKG06LI) were used to

monitor digestion and method specific failures. ALS Limited (ALS) located in North Vancouver, British Columbia

completed the analysis of the samples provided. ALS has a 9001:2008 International Standard Organization rating

for Quality Management Systems. ALS has an ISO/IEC 17025:2017 UKAS (ref 4028) accreditation.

Four drillholes from the 2024 program were analyzed using analytical package; Au-ICP21(30g), ME-MS61(0.75g):

Four acid digestion followed by ICP-MS measurement, ME-IR08: Total C by C-IR07 and total S by S -IR08, Cu-

PKG06LI (Seq. Leach Cu) + S -IR06a). Two drillholes were assayed using the modified method multi -element,

analytical package; Au-ICP21(30g), ME-MS61(0.75g): Four acid digestion followed by ICP-MS measurement,

ME-IR08: Total C by C-IR07 and total S by S-IR08, + S-IR06a).

Qualified Person

Elmer B. Stewart, MSc. P. Geol., President and CEO of Copper Fox, is the Company’s non-independent, nominated

Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has

reviewed and approved the scientific and technical information disclosed in this news release.

5

About Copper Fox

Copper Fox is a Tier 1 Canadian resource company listed on the TSX Venture Exchange (TSXV:CUU) focused on

copper exploration and development in Canada and the United States. The principal assets of Copper Fox and its

wholly owned Canadian and United State s subsidiaries, being Northern Fox Copper Inc. and Desert Fox Copper

Inc., are the 100% ownerships of the Van Dyke ISCR project, and the Mineral Mountain and Sombrero Butte

porphyry copper exploration projects all located in Arizona, the 25% interest in the Schaft Creek Joint Venture with

Teck Resources Limited on the Schaft Creek copper -gold-molybdenum-silver project and the 100% owned

Eaglehead polymetallic porphyry copper project each located in northwestern British Columbia. For more

information on Cop per Fox’s mineral properties and investments visit the Company’s website at

www.copperfoxmetals.com.

On behalf of the Board of Directors

Elmer B. Stewart

President and Chief Executive Officer

For additional information contact: Fidel Montegu at 1-844-484-2820 or [email protected].

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains “forward -looking information” within the meaning of the Canadian securities laws.

Forward-looking information is generally identifiable by use of the words “believes,” “may,” “plans,” “will,”

“anticipates,” “intends,” “budgets ,” “could ,” “estimates ,” “expects ,” “forecasts ,” “projects ,” and similar

expressions, and the negative of such expressions. Forward-looking information in this news release includes

statements regarding average grade of mineralized intervals ; CuEq calculati ons: geotechnical drillin g; and

collection of additional geotechnical, hydrogeological, environmental data.

In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries

have made numerous assumptions , regarding, among other things: th e geological, metallurgical, engineering,

financial and economic advice that Copp er Fox has received is reliable and is based upon practices and

methodologies which are consistent with industry standards. While Copper Fox considers these assumptions to be

reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.

Additionally, there are known and unknown risk factors which could cause Copper Fox’s actual results,

performance, or achievements to be materially different from any future results, performance or achievements

expressed or implied by the forward -looking information contained herein. Known risk factors include, among

others: the average grade of mineralized intervals may not be correct or significant; the CuEq calculations may not

be accurate; the additional geotechnical, hydrogeological, environmental data may not provide the expected results,

the need to obtain additional financing; uncertainty as to the availability and terms of future financing.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's

continuous disclosure filings with Canadian securities regulatory authorities at www.sedarplus.ca. All forward-

looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any

obligation to revise or update any such forward -looking information or to publicly announce the result of any

revisions to any of the forward -looking information contained herein to reflect future results, events, or

developments, except as required by law.