Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CUU.V ·

Copper Fox Completes Ni 43-101 Technical Report FOR Eaglehead Project

Resource Estimates Technical Reports (NI 43-101)

COPPER FOX COMPLETES NI 43-101 TECHNICAL REPORT FOR

EAGLEHEAD PROJECT

Calgary, Alberta – July 21, 2017. Copper Fox Metals Inc. (“Copper Fox” or the “Company”)

(TSX-V: CUU – OTC: CPFXF) announces that pursuant to its news release dated May 30, 2017 it is

pleased to provide its shareholders with the results of a recently completed report entitled “Technical

Report on the Eaglehead Project”, Effective Date July 10, 2017 (the “ Report”) prepared in accordance

with National Instrument 43 -101, Standards of Di sclosure for Mineral Projects. The Report was

prepared by Moose Mountain Technical Services (“ MMTS”), with Mr. Robert Lane, MSc. P.Geo., as

Qualified Person . The Report has been filed on SEDAR and will be uploaded to the Company’s

website.

Copper Fox, through its wholly owned subsidiary Northern Fox Copper Inc., owns 65.4% of the issue d

shares of Carmax Mining Corp. (“Carmax”) (TSX-V: CXM). Carmax is the registered owner of the

Eaglehead copper/gold/molybdenum project (the “Project”) located in northwestern British Columbia.

Highlights:

 The Project hosts a calc -alkalic porphyry copper -molybdenum-gold-silver system of

significance.

 A multi -parameter exploration program estimated to cost $ 4.95 million is warranted to more

fully evaluate the potent ial of the Project to host an economic calc -alkalic porphyry Cu-Mo-Au-

Ag deposit.

 The proposed recommended exploration program includes among other activities 11,000m of

drilling, preliminary metallurgical testwork and geophysical surveys.

 The Project is at an early -to-intermediate stage of exploration with modern ground -based and

airborne geophys ical surveys, 126 diamond drill holes, and preliminary metallurgical test work

completed.

 Six zones of copper -molybdenum-gold-silver mineralization occur within a prospective,

mineralized corridor (0.5-1.5km in width and in excess of 8km long) characterized by:

o a belt of moderate magnetic response with small, irregular -shaped moderate -to-high

magnetic features that coincides with the western margin of the Eaglehead pluton;

o a 10km long, semi-continuous copper soil geochemical anomaly;

o a 6km long, open-ended chargeability-high anomaly, within which five zones of copper -

molybdenum-gold-silver mineralization are located. This anomaly averages 900m wide

and is open below a depth of 500m;

o a Far East zone, located approximately 3,000m from the end of the chargeability

anomaly, exhibits several mineralized drill holes and a 1,000m by 1,000m copper and

molybdenum soil geochemical anomaly;

2

o moderate-to-intense potassic (princip ally K -feldspar), pervasive phyllic (sericitic) and

late propylitic alteration of the mineralized intrusive host rocks;

o multiple phases of mineralization, consisting primarily of chalcopyrite and bornite with

minor molybdenite in quartz veins, quartz stockworks, and zones of fracturing and

brecciation; and

o drilling has intersected good grades of copper-molybdenum-gold-silver over narrow-to-

wide intervals (ranging from 1.5 to 521.2m) in 120 of 126 holes completed to-date.

Elmer B. Stewart, President and C EO of Copper Fox, stated, “We are pleased to have an independent

technical update completed on the Eaglehead project. The technical report concluded that a significant,

large porphyry copper-molybdenum-gold environment exists on the Eaglehead project and recommends

additional exploration consisting of geophysical surveys, diamond drilling and preliminary rock

characterization and metall urgical testwork be completed. The estimated cost (including contingencies

at 10%) of the proposed multi-year exploration program is $4.95 million.”

Mr. Robert A. Lane; MSc., P. Geo. of MMTS is the Qualified Person who prepared the technical report

disclosed in this news release and has approved the scientific and technical content of this news release.

Elmer B. Stewart, MS c. P. Geol., President and CEO of Copper Fox, is the Company’s non -

independent, nominated Qualified Person pursuant to National Instrument 43 -101, Standards for

Disclosure for Mineral Projects, and has reviewed and approves the scientific and technical inf ormation

disclosed in this news release.

About Copper Fox

Copper Fox is a Tier 1 Canadian resource company listed on the TSX Venture Exchange (TSX -V:

CUU) focused on copper exploration and development in Canada and the United States. The principal

assets of Copper Fox and its wholly owned Canadian and United States subsidiaries, being Northern Fox

Copper Inc. and Desert Fox Copper Inc., are the 25% interest in the Schaft Creek Joint Venture with

Teck Resources Limited on the Schaft Creek copper -gold-molybdenum-silver project located in

northwestern British Columbia and a 100% ownership of the Van Dyke oxide copper project located in

Miami, Arizona. For more information on Copper Fox’s other mineral properties and investments visit

the Company’s website at http://www.copperfoxmetals.com.

For additional information contact: Investor line 1-844-484-2820 or Lynn Ball, at 1-403-264-2820.

On behalf of the Board of Directors

Elmer B. Stewart

President and Chief Executive Officer

Neither TSX Venture Exchange n or its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary Note Regarding Forward-Looking Information

This news release contain s forward -looking information within the meaning of the Canadian securities laws and forward -

looking statements within the meaning of the Section 27A of the Securities Act of 1933 and Section 21E of the Securities

Exchange Act of 1934 (collectively, “forwa rd-looking information”). Forward -looking information in this news release

3

include statements about: the Project hosting a calc -alkalic porphyry copper-molybdenum-gold-silver system of significance;

a multi-parameter exploration program estimated to cost $4.95 million to more fully evaluate the potential of the Project to

host an economic calc -alkalic porphyry Cu -Mo-Au-Ag deposit; the proposed exploration activities of the Project; the

existence, size, and characterization of six zones of copper -molybdenum-gold-silver mineralization located within a

prospective 0.5-1.5km wide and in excess of 8km long mineralized corridor, including a belt of moderate magnetic response

with small, irregular -shaped moderate -to-high magnetic features, a semi -continuous copper soil geochemical anomaly, an

open-ended chargeability -high anomaly, a Far East zone exhibiting several mineralized drillholes and a copper and

molybdenum soil geochemical anomaly, moderate -to-intense potassic (principally K -feldspar), pervasive phyllic (s ericitic)

and late propylitic alteration of the mineralized intrusive host rocks, the multiple phases of chalcopyrite and bornite

mineralization with minor molybdenite in quartz veins, quartz stockworks, and zones of fracturing and brecciation, and the

narrow-to-wide intervals of mineralization in 120 of 126 holes. Information concerning exploration potential also may be

deemed to be forward -looking information in that it reflects a prediction of the mineralization that would be encountered by

further successful exploration.

In connection with the forward -looking information contained in this news release, Copper Fox and its subsidiaries have

made numerous assumptions, regarding, among other things: the geological, metallurgical, engineering, financial and

economic advice that Copper Fox has received is reliable and is based upon practices and methodologies which are consistent

with industry standards. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently

subject to significant uncertainties and contingencies. Additionally, there are known and unknown risk factors which could

cause Copper Fox’s actual results, performance or achievements to be materially different from any future results,

performance or achievements expressed or implied by the forward -looking information contained herein. Known risk factors

include, among others: the Project may not host a calc -alkalic porphyry copper -molybdenum-gold-silver system of

significance, or at all; a multi -parameter exploration program may not be conducted on a timely basis, or at all, or may cost

more than estimated; the zones of copper -molybdenum-gold-silver mineralization may not be of the size or characterization

estimated; additional exploration may not locate similar grades of mineralization or at all; the actual mineralization in the

Project may not be as favorable as suggested by the drill data; the mineralization may not be as extensive as suggested by th e

geophysical and drill hole data; uncertainties relating to interpretation of drill results and the geology, continuity and grade of

mineral deposits; the need to obtain additional financing to develop properties and uncertainty as to the availability and te rms

of future financing; the possibility of delay in explo ration or development programs or in construction projects and

uncertainty of meeting anticipated program milestones; and uncertainty as to timely availability of permits and other

governmental approvals.

A more complete discussion of the risks and uncert ainties facing Copper Fox is disclosed in Copper Fox's continuous

disclosure filings with Canadian securities regulatory authorities at www.sedar.com. All forward -looking information herein

is qualified in its entirety by this cautionary statement, and Co pper Fox disclaims any obligation to revise or update any such

forward-looking information or to publicly announce the result of any revisions to any of the forward -looking information

contained herein to reflect future results, events or developments, except as required by law.