Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CUU.V ·

Copper Fox Announces 2024 Third Quarter Operating and Financial Results

Financials

COPPER FOX ANNOUNCES 2024 THIRD QUARTER OPERATING AND FINANCIAL RESULTS

Calgary, Alberta – September 25, 2024. Copper Fox Metals Inc. (“Copper Fox” or the “Company”) (TSXV: CUU –

OTCQX: CPFXF) is pleased to announce that its unaudited interim consolidated July 31, 2024, financial statements

have been filed on SEDAR+.

For the nine months ended July 31, 2024, Copper Fox had a net loss of $826,730 (July 31, 2023 – $882,395) which

equated to $0.00 loss per share (July 31, 2023 - $0.00 loss per share). As of the date of the MD&A, September 24,

2024, the Company’s cash position was $1,145,000.

During the nine months ended July 31, 2024 , the Compan y incurred $825,069 in exploration expenditures

primarily furthering the development of the Van Dyke (Globe-Miami Mining District , AZ) , Mineral Mountain

(Mineral Mountain Mining District, AZ) , Sombrero Butte (Bunker Hill Mining District, AZ ) and Eaglehead (Liard

Mining District, BC) copper projects. Copies of the financial statements, notes , and related management

discussion and analysis may be obtained on SEDAR + at www.sedarplus.ca, the Company ’s web site at

www.copperfoxmetals.com or by contacting the Company directly. All references to planned activities and

technical information contained in this news release have been previously announced by way of news releases .

All amounts are expressed in Canadian dollars unless otherwise stated.

Elmer B. Stewart, President and CEO of Copper Fox stated, “ During the Quarter, the positive results from the

geotechnical study at Van Dyke included a safer, faster and more environmentally friendlier method to develop

the decline and that the project’s geotechnical data was sufficient to meet the threshold for a prefeasibility study

(PFS). The permitting process to allow completion of the four-drillhole “maiden” drilling program at Mineral

Mountain and the surface exploration at Sombrero Butte are progressing. The stream water sampling program

completed at Eaglehead during the Quarter showed no appreciable changes in the water quality since inception

of the program in 2021.

At Schaft Creek, the Schaft Creek Joint Venture (SCJV) completed the field portion of the most comprehensive

annual program since formation of the joint venture, budgeted at C$18.7 million. The drilling filled in gaps in the

geotechnical data and extended the mineralization in the Schaft Creek deposit to the north. While the preliminary

indications from the metallurgical testwork are encouraging, the testwork is progressing slower than expected .

Lock cycle testing of the rougher concentrate samples is underway and the testwork program is expected to be

completed in Q4-2024. The results of the metallurgical program are necessary to better understand the

metallurgical performance of the mineralization and optimize the processing flowsheet design.”

2024 Q3 Highlights

• On May 22, 2024, the Company provided an update on the application to obtain a permit to conduct drilling

operations at its 100% owned exploration stage Mineral Mountain porphyry copper property.

• On May 30, 2024, the Company provided an update on its 100% owned Sombrero Butte project which included

planning a deep penetrating geophysical survey to define the size and the chargeability anomalies underlying

Target #1 and #2.

• On June 18, 2024, the Company announced that the 2024 field program at the Schaft Creek project is

underway.

2

• On July 10, 2024, the Company announced the results of the geotechnical investigation at Van Dyke copper

project. Call & Nicholas was contracted to collect geotechnical data in support of a planned prefeasibility -

level design study of a decline from which to establish injection and recovery well stations to enable leaching

of the oxidized portion of the Van Dyke copper deposit. Highlights of the geotechnical investigation are as

follows:

• The current drillhole data coverage will support a PFS.

• Geotechnical parameters of the Gila Conglomerate are generally consistent, and match expected

ranges of the Gila Conglomerate in other parts of the Globe-Miami Mining District.

• A preliminary assessment of the rock quality of the Gila Conglomerate suggests that excavation of the

spiral decline utilizing a road header is viable.

• Shotcrete and rock bolting will be required for permanent ground support.

• When excavating the decline, a two-pass ground support strategy will consist of a first-pass flash coat

(two inches) of shotcrete and a second pass consisting of rock bolts and a final coat of shotcrete.

• On July 17, 2024, the Company extended the porphyry trend at Mineral Mountain and suggested the

introduction of several phases of molybdenite mineralization during emplacement of the porphyry system.

• The field portions of the archeological, cultural, and biological investigations required to complete the

Environmental Review (ER) have been completed. Results are being compiled.

• The ER and Solicitation of Public Comments on the P lan of Operations is expected to take

approximately four to six months to complete with an estimated cost of US$45,000. The estimated

timeline and costs are subject to change contingent on amendments to the scope of work that could

be requested by either Federal or State authorities.

• Utilization of fertility indices supports the porphyry potential of the Laramide -age Mineral Mountain

intrusive and has extended the potential strike length of this mineralized trend approximately three

kilometers to the northeast.

• Indicators of distal to proximal hydrothermal activity related to porphyry -style mineralization have

been identified within Target #1, #2, and #3.

• On July 31, 2024, the Company completed a non-brokered private placement for a total of 5,116,000 units at

$0.22 per unit for aggregate gross proceeds of $1,125,520.

Subsequent to the Quarter-end

On September 24, 2024, the Company provided an update on the Schaft Creek Project. Highlights of the program

are as follows:

• The 2024 Geotechnical Drilling Program has been completed with 6 drillholes totalling 2,472 meters (m).

• Three of the six geotechnical holes intersected significant intervals of porphyry style mineralization.

• The mineralization intersected in DDH SCK-24-472 extended the hydrothermal breccia of the Paramount

zone approximately 250 m to the north.

• Lock cycle testing of the rougher concentrate samples is underway. The metallurgical testwork is

expected to be completed by the end of Q4 2024.

• Environmental Baseline data collection continues with surface and ground water sampling and

hydrological measurements taken on a monthly basis as well as meteorology, fish and glacial surveys.

• Archaeology investigations were conducted in the area around the proposed Tailing Management (TMF)

and Rock Storage (RSF) facilities.

• Final reports on the 2023 Environmental Baseline programs are under review.

• Camp upgrades have been completed to support future programs of up to 85 people, including the

commissioning of the solar and battery power system.

3

Subsequent to July 31, 2024, the Company received $900,000 from the exercise of 3,600,000 warrants.

Elmer B. Stewart, MSc. P. Geol., President of Copper Fox, is the Company’s non-independent, nominated Qualified

Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, and has reviewed

and approves the scientific and technical information disclosed in this news release.

Selected Financial Results

3 Months Ended 3 Months Ended 3 Months Ended 3 Months Ended

July 31, 2024 April 30, 2024 January 31, 2024 October 31, 2023

Loss before taxes $ 293,185 $ 302,668 $ 230,877 $ 232,117

Net loss 293,185 302,668 230,877 232,117

Comprehensive (gain) / loss 199,184 (167,103) 905,445 (602,417)

Comprehensive loss per share,

basic and diluted 0.00 0.00 0.00 0.00

3 Months Ended 3 Months Ended 3 Months Ended 3 Months Ended

July 31, 2023 April 30, 2023 January 31, 2023 October 31, 2022

Loss before taxes $ 348,787 $ 254,018 $ 279,590 $ 461,137

Net loss 348,787 254,018 279,590 401,137

Comprehensive (gain) / loss 870,509 (43,966) 563,026 (668,062)

Comprehensive loss per share,

basic and diluted 0.00 0.00 0.00 0.00

Liquidity

As at July 31, 2024, the Company’s cash position was $689,082 (October 31, 2023 - $1,368,852).

About Copper Fox

Copper Fox is a Tier 1 Canadian resource company focused on copper exploration and development in Canada

and the United States. The principal assets of Copper Fox and its wholly owned Canadian and United States

subsidiaries, being Northern Fox Copper Inc. and Desert Fox Copper Inc., are the 25% interest in the Schaft Creek

Joint Venture with Teck Resources Limited on the Schaft Creek copper-gold-molybdenum-silver project located in

northwestern British Columbia and the 100% ownership of the Van Dyke oxide copper project located in Miami,

Arizona. For more information on Copper Fox’s other mineral properties and investments visit the Company’s

website at www.copperfoxmetals.com.

On behalf of the Board of Directors,

Elmer B. Stewart

President and Chief Executive Officer

For additional information please contact:

Fidel Montegu at 1-844-464-2820 or [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

4

Cautionary Note Regarding Forward-Looking Information

This news release contains forward -looking statements within the meaning of the Section 27A of the Securities

Act of 1933 and Section 21E of the Securities Exchange Act of 1934, and forward -looking information within the

meaning of the Canadian securities laws (collectively, “forward -looking information”). Forward-looking

information in this news release include statements about ; positive results from the geotechnical study at Van

Dyke and that the geotechnical data is sufficient for a PFS; obtaining permits for a “maiden” drilling program at

Mineral Mountain and the surface exploration at Sombrero Butte are progressing; the stream water sampling at

Eaglehead showed no appreciable changes; and that the drilling at Schaft Creek filled in geotechnical gaps and

extended the mineralization to the north.

In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries

have made numerous assumptions regarding, among other things: the geological, financial, and economic advice

that Copper Fox has received is reliable and is based upon practices and methodologies which are consistent with

industry standards; that the mineral reserve and resources estimates and the key assumptions and parameters

on which such estimates are based are reasonable; the costs and results of planned exploration activities are as

anticipated; and the stability of economic and market conditions. While Copper Fox considers these assumptions

to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies.

Additionally, there are known and unknown risk factors which could cause Copper Fox’s actual results,

performance, or achievements to be materially different from any future results, performance or achievements

expressed or implied by the forward -looking information contained herein. Known risk factors include, the Van

Dyke project may not progress to the PFS stage; exploration permits may not be received; surface exploration may

not progress as planned; metallurgical testwork results may not be received or provide the information expected;

the overall economy may deteriorate; uncertainty as to the availability and terms of future financing; copper

prices and demand may fluctuate; currency exchange rates may fluctuate; conditions in the financial markets may

deteriorate; trading prices of the Company’s common shares may decrease below the exercise price of any

outstanding warrants of the Company; and uncertainty as to timely availability of permits and other governmental

approvals.

A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's

continuous disclosure filings with Canadian securities regulatory authorities at www.sedarplus.ca. All forward-

looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any

obligation to revise or update any such forward -looking information or to publicly announce the result of any

revisions to any o f the forward -looking information contained herein to reflect future results, events, or

developments, except as required by law.