Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CUCU.V ·

Li3 Lithium Corp Announces Filing of NI 43-101 for the Mutare Lithium Project in Zimbabwe

Corporate Updates

Li3 Lithium Corp Announces Filing of NI 43-101 for

the Mutare Lithium Project in Zimbabwe

Toronto, Canada, July 26, 2023 – Li3 Lithium Corp. (TSXV: LILI) (FSE: WD9) (“Li3 Lithium” or

the “Company”) is pleased to announce that it has filed a technical report, in accordance with National

Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) for the Company’s 50%

owned Mutare Lithium Project located in Manicaland Province of northeastern Zimbabwe.

The Mutare Lithium Project consists of 66 claims of various sizes covering a surface area of 26.955 km2

along a 57 km northeast-trending strike of the highly mineralized Mutare Greenstone Belt. The large-

scale operating Sabi Star Lithium Mine is directly adjacent to the Mutare Lithium Project claims located

in the central region of the Mutare Greenstone Belt. The Mutare Lithium Technical Report documents

and confirms the results of historical prospecting and exploration activities completed by previous owners

of the property and recent data compilation, review and surface sampling work completed by the

Company. It also provides additional information on the project’s history, regional geology and history

of artisanal and commercial lithium and tantalum mining, mineralization styles and exploration targets,

and provides recommendations for exploration work.

In May 2023, Li3 Lithium Corp. and Premier African Minerals Limited entered into a joint venture

shareholders agreement whereby each of Li3 Lithium and Premier African Minerals respectively hold an

effective 50% partnership interest, with the two companies to jointly fund exploration work on the Mutare

Lithium Project. Li3 Lithium has been named as operator of the project which is to be co-explored and

co-developed with in-country expertise to be provided by Premier African Minerals, owner and operator

of the Zulu Lithium Tantalum Mine located in Zimbabwe.

The technical report, titled “NI 43-101 Technical Report, Mutare Lithium Project, Zimbabwe”, dated June

30, 2023 (with an effective date of June 30, 2023), was prepared for the Company in accordance with NI

43-101, by independent geological consultant, André Ciesielski, PGeo, D.Sc. and Francois Auclair,

P.Geo. M.Sc., CEO and President of Li3 Lithium, co-authored the report as a non-independent

Professional Geologist. The Mutare Lithium Technical Report is available on SEDAR (www.sedar.com)

under the Company’s issuer profile and on the Company’s website (www.lithium3.com).

Qualified Person

François Auclair, QP, M.Sc, Quebec Order of Geologists, CEO and President of Li3 Lithium, is the non-

independent qualified person as defined by National Instrument 43-101 - Standards of Disclosure for

Mineral Projects for the technical disclosure contained in this news release. Mr. Auclair has reviewed

and approved the technical disclosure contained in this news release.

About Li3 Lithium Corp.

Li3 Lithium is focused on acquiring and developing hard rock spodumene lithium assets in Zimbabwe

and Argentina, where the founders have significant experience and relationships. As evidenced by recent

market growth, hard rock lithium deposits are forecast to continue to dominate the global supply of

lithium given the scarcity, complexity and capex-intensive nature of alternative brine sources.

Contact Information:

Li3 Lithium Corp.

Francois Auclair, P.Geo, M.Sc., CEO and President

Tel: 514-889-5089

Email: [email protected]

www.lithium3.com

CAUTIONARY STATEMENT:

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts

responsibility for the adequacy or accuracy of this release.

This news release contains certain “forward-looking information” within the meaning of applicable securities laws.

Forward looking information is frequently characterized by words such as “ plan”, “expect”, “project”, “intend”,

“believe”, “anticipate”, “estimate”, “may”, “will”, “would”, “potential”, “proposed” and other similar words, or

statements that certain events or conditions “may” or “will” occur. These statements are only predictions. Forward-

looking information is based on the opinions and estimates of management at the date the information is provided,

and is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to

differ materially from those projected in the forward- looking information. For a description of the risks and

uncertainties facing the Company and its business and affairs, readers should refer to the Company’s Management’s

Discussion and Analysis. The Company undertakes no obligation to update forward- looking information if

circumstances or management’s estimates or opinions should change, unless required by law. The reader is

cautioned not to place undue reliance on forward-looking information.