Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CTV.V ·

Flying Nickel Engages Lycopodium to Conduct Feasibility Study on Minago Nickel Project in Thompson Nickel Belt, Manitoba

Corporate Updates

Flying Nickel Engages Lycopodium to Conduct

Feasibility Study on Minago Nickel Project in

Thompson Nickel Belt, Manitoba

Vancouver, British Columbia--(Newsfile Corp. - March 16, 2022) -

Flying Nickel Mining Corp.

(TSXV:

FLYN)

("Flying Nickel

" or the

"Company

") is pleased to announce it has commissioned a Feasibility

Study ("FS") in accordance with National Instrument 43-101 -

Standards of Disclosure for Mineral

Projects

("NI 43-101") in respect of its Minago nickel project, located in the Thompson nickel belt,

Manitoba, Canada.

The FS will be prepared in collaboration amongst Lycopodium (project cost estimate, processing and

infrastructure), AGP Mining Consultants (mineral reserves, pit optimization), Mercator Geological

Services (geology and mineral resource), and Trek Geotechnical (geotechnical, tailings and waste

management). The FS is expected to take nine months to complete.

Minago currently has an NI 43-101 compliant Measured and Indicated resource of 722Mlbs contained

nickel grading 0.74% and Inferred resource of 319Mlbs contained nickel also grading 0.74%.

This

technical report, completed by Mercator and AGP, has an effective date of July 2, 2021, and is available

under the Company's profile on SEDAR. A majority of the resource is open pit optimized.

The FS will adhere to the parameters in the approved 2011 Environmental Act License ("EAL"), which

permits a 10,000 tonne-per-day open-pit mining operation at Minago. The EAL is currently valid,

pending the approval of a Notice of Alteration ("NOA") involving a minor change to the plant layout. The

NOA was submitted in late 2021, and the EAL is expected to be reissued to Flying Nickel in Q2 2022.

This is the final permitting hurdle for Flying Nickel to commence Minago mine construction. No federal

permit is required for Minago.

Dan Oosterman, CEO, commented: "Minago is one of the few open-pit optimized nickel sulphide

projects in North America with an excellent nickel grade of 0.74% that is a pure nickel play. Minago is in

the Thompson nickel belt in Manitoba, North America's second largest historic nickel camp with excellent

infrastructure. The potential future Minago operation could possibly have one of the lowest carbon

footprints in the world as the Province of Manitoba is 97% hydro-powered, producing concentrate for

Class 1 nickel products that are an ideal fit for automakers' green EV initiative."

Rob van Drunen, COO, commented: "Flying nickel is well on its path to complete the FS and achieve full

permitted status in 2022, a significant lead over other greenfield nickel projects in North America. The

company is fully financed for its 2022 work program from its recent $8.6 million equity offering."

Qualified Person

The technical contents of this news release have been prepared under the supervision of Danniel

Oosterman, CEO. Mr. Oosterman is not independent of the Company in that he is employed by it. Mr.

Oosterman is a qualified person as defined by the guidelines in NI 43-101.

About Flying Nickel

Flying Nickel Mining Corp. is a premier nickel sulphide mining and exploration company, which was spun

out from Silver Elephant Mining Corp in January 2022.

The company is advancing its 100% owned

Minago nickel project in the Thompson nickel belt in Manitoba, Canada.

Further information on the Company can be found at

www.flynickel.com

.

FLYING NICKEL MINING CORP.

ON BEHALF OF THE BOARD

"Danniel Oosterman"

Chief Executive Officer

For more information about the Company, please contact:

Phone: 1-604-569-3661 ext. 101

Email:

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Cautionary Note Regarding Forward-Looking Statements

Certain statements contained in this news release, including statements which may contain words such

as "expects", "anticipates", "intends", "plans", "believes", "estimates", or similar expressions, and

statements related to matters which are not historical facts, are forward-looking information within the

meaning of applicable securities laws. Such forward-looking statements, which reflect management's

expectations regarding the Company's future growth, results of operations, performance, business

prospects and opportunities, are based on certain factors and assumptions and involve known and

unknown risks and uncertainties which may cause the actual results, performance, or achievements to be

materially different from future results, performance, or achievements expressed or implied by such

forward-looking statements.

These factors should be considered carefully, and readers should not place undue reliance on the

Company's forward-looking statements. The Company believes that the expectations reflected in the

forward-looking statements contained in this news release and the documents incorporated by reference

herein are reasonable, but no assurance can be given that these expectations will prove to be correct. In

addition, although the Company has attempted to identify important factors that could cause actual

actions, events or results to differ materially from those described in forward looking statements, there

may be other factors that cause actions, events or results not to be as anticipated, estimated or

intended. The Company undertakes no obligation to release publicly any future revisions to forward-

looking statements to reflect events or circumstances after the date of this news or to reflect the

occurrence of unanticipated events, except as expressly required by law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/116996