Vancouver, B.C. (November 13, 2024) – Canterra Minerals Corporation (TSXV:CTM) (OTCQB: CTMCF) (“Canterra”
or the “Company”) is pleased to report initial results from the maiden drilling program at its 100% owned Buchans
Project within the Central Newfoundland Mining District (Figure 1).
Canterra holds Newfoundland’s second-largest combined critical minerals inventory with seven resource-stage
deposits. The Buchans Project hosts the Lundberg Copper-Zinc-Lead deposit, the largest and most advanced critical
minerals deposit within the Central Newfoundland Mining District. In addition, the Buchans Project possesses
considerable infrastructure and has previously included mining operations making it an excellent site for future
development.
Results for the first six drill holes of the eight hole program are highlighted below and are further summarized in
Table 1. The purpose of the first six holes was to expand the Lundberg deposit as well as provide an initial testing of
the Two Level target area located approximately 50 m etres (“m”) northwest of the Lundberg deposit (within the
Buchans Project)(Figure 2).
Drill Highlights – Lundberg (1&2):
• 2.25% CuEq over 60.25 m (0.74% Cu, 3.92% Zn, 1.16% Pb, 11.5 g/t Ag & 0.16 g/t Au) from surface in hole
H-24-3531
o Including 3.17% CuEq over 26.00 m (0.95% Cu, 6.13% Zn, 1.63% Pb, 13.9 g/t Ag and 0.20 g/t Au)
• 0.90% CuEq over 121.45m (0.41% Cu, 1.08% Zn, 0.54% Pb, 4.41 g/t Ag & 0.04 g/t Au) in hole H-24-3527
• Low all-in drill cost of approximately $200/m across 1,600 m program
• Results should augment and enhance future resource estimate updates at Lundberg, the largest and most
advanced Copper-Zinc-Lead deposit within the Central Newfoundland Mining District
• Results will be incorporated into future VRIFY AI predictive modelling to identify and target mineralization
elsewhere on the property
• Assays are pending for the remaining two holes that targeted the area of higher-grade mineralization
intersected in hole H-12-3531 as well as to test the central corridor of the Lundberg mineralization where
potential remains to extend the deposit both at depth below the 2019 pit shell (165 m) and up to 35 metres
north of the current resource inventory.
Chris Pennimpede, President and CEO of Canterra commented: “The drill results received to date continue to
confirm the value of Lundberg as the foundation asset of the Buchans Project. The 2024 drill program also
demonstrates the benefit of ultralow drill costs on the project. This is a testament to the jurisdiction’s infrastructure
and mining friendly disposition, establishing Buchans among Canada’s lowest cost jurisdictions to explore and
discover new resources. The last resource estimate at the Lundberg deposit was completed in 2019 during a period
of lower metal prices, particularly with respect to copper, which is a significant component of th is resource. With
today’s drill results and improved metal prices, we believe Lundberg has the potential for further expansion and
remains a foundation for long-term development of the district with Canterra’s goal to grow from its current ~26 Mt
global critical minerals resource base to 40 Mt . We look forward to expanding our exploration efforts in the near
term to wards the discovery of new high -grade resources comparable to the project’s historical production that
established Buchans as one of the world’s highest grade volcanogenic massive sulphide mining districts.”
Drilling – Key Points:
2
• H-24-3531 tested the Lundberg deposit starting at surface and confirmed and extended high grade
mineralization in this area. This drill hole will support future resource modelling where historical drilling is
limited and assay records are incomplete.
• H-24-3527 extends near-surface mineralization to depths 240 m below surface , which is below previous
drilling, and Lundberg’s historical resource estimate that currently extends to a depth of ~180 m in this area.
• H-24-3529 tested for an extension to the Two Level sulphide horizon ~180 m laterally, northwest of the
Lundberg mineral resource where it intersected a 16.6 m thick ore clast-bearing horizon unit , including a
2.0 m section assaying 0.04% Cu, 0.39% Zn, 0.26% Pb, 6.9 g/t Ag & 0.05 g/t Au (0.31% CuEq). This hole also
intersected Lundberg stockwork mineralization below the Two Level horizon averaging 0.07% Cu, 0.36% Zn,
0.19% Pb, 1.7 g/t Ag & 0.06 g/t Au (0.25% CuEq) over 13.00 m. These intercepts extend the Two Le vel
horizon beyond the limits of past mining where the horizon continues to remain poorly tested down plunge
to the northwest and extend the Lundberg deposit’s stockwork mineralization ~ 50 m n orth of previous
resource drilling.
Table 1. Assay Highlights. Assays for holes H-24-3532 and 3524 are pending. See notes at end of release.
Hole ID From
(m)
To
(m)
Width
(m)
Cu
%
Zn
%
Pb
%
Ag
g/t
Au
g/t
Cu eq
(%) Comments
H-24-3531 0.75 61.00 60.25 0.74 3.92 1.16 11.50 0.16 2.25 Lundberg
incl. 4.00 60.00 56.00 0.74 4.15 1.23 10.74 0.14 2.30 " "
incl. 6.00 32.00 26.00 0.95 6.13 1.63 13.94 0.20 3.17 " "
incl. 46.00 54.00 8.00 0.53 3.14 1.11 7.83 0.04 1.70 " "
H-24-3530 abandoned in old workings
H-24-3529 270.10 272.10 2.00 0.04 0.39 0.26 6.9 0.05 0.36 Two Level horizon
and 318.25 331.25 13.00 0.07 0.36 0.19 1.7 0.06 0.29 Lundberg
H-24-3528 96.50 99.80 3.30 0.04 0.62 0.30 8.4 0.08 0.45 Lundberg
incl. 97.30 98.80 1.50 0.06 1.04 0.52 13.5 0.14 0.75 " "
H-24-3527 67.55 189.00 121.45 0.41 1.08 0.54 4.4 0.03 0.90 Lundberg
incl. 67.85 81.00 13.15 1.76 1.69 1.01 13.4 0.08 2.68 " "
incl. 137.00 147.00 10.00 0.27 2.83 1.20 4.2 0.04 1.36 " "
and 239.70 240.40 0.70 4.23 1.46 0.15 9.7 0.08 4.78 " "
H-24-3381EXT 133.00 145.00 12.00 0.23 0.46 0.32 1.6 0.02 0.47 Lundberg
incl. 135.00 144.00 9.00 0.26 0.54 0.41 1.8 0.02 0.55 " "
incl. 135.00 141.00 6.00 0.14 0.81 0.49 1.7 0.02 0.51 " "
Buchans Project
The Buchans Project is an advanced critical mineral s project hosting significant undeveloped mineral deposits
adjacent to the past producing Buchans Mine. This brownfield project covers 83.25 square kilometres near the town
of Buchans and hosts the past producing Buchans mine operated by Asarco from 1928 to 1984. The project also
hosts the undeveloped Lundberg deposit, a VMS stockwork sulphide deposit comprising a large, near -surface
resource located beneath and adjacent to workings of the previously mined, high -grade Lucky Strike massive
sulphide orebody. At Lucky Strike, Asarco is reported to have mined 5.6 million tonnes(4) of high-grade ore averaging
18.4% Zn, 8.6% Pb, 1.6% Cu, 112 g/t Ag & 1.7 g/t Au. Lucky Strike’s historic production is a significant portion of the
former Buchans Mine’s past production that is reported to have totaled 16.2 million tonnes (4) at an average grade
of 14.5% Zn, 7.6% Pb, 1.3% Cu, 1.37 g/t Au & 126 g/t Ag mined from five orebodies.
Lundberg Deposit
Lundberg’s Resource Estimate(3) includes In-pit Indicated Mineral Resources containing 156 million pounds Cu, 566
million pounds Zn, 237 million pounds Pb, 3.1 million ounces Ag, & 37,000 ounces Au as well as In-pit Inferred
Mineral Resources totaling 380,000 tonnes containing 3.0 million pounds Cu, 17 million pounds Zn, 9 million pounds
Pb, 270,000 ounces Ag, & 38,000 ounces Au) and assigns 97.8% of the In -Pit resources to the Indicated category.
Table 2: Lundberg Deposit Mineral Resource Estimate – Effective Date: February 28, 2019
NSR Cut-off ($US/t) Category Tonnes Cu % Zn % Pb % Ag g/t Au g/t NSR ($US/t)
20 Indicated 16,790,000 0.42 1.53 0.64 5.69 0.07 54.98
3
Inferred 380,000 0.36 2.03 1.01 22.35 0.31 72.95
1. Mineral Resources were prepared in accordance with the CIM Definition Standards for Mineral Resources and Mineral Reserves (MRMR)
(2014) and CIM MRMR Best Practice Guidelines (2019).
2. Mineral Resources are defined within an optimized pit shell with pit slope angles of 45⁰ and an overall 2.9:1 strip ratio (wa ste: mineralized
material)
3. Price assumptions used were US$1.20 /lb Zn, US$1.00 /lb Pb, US$3.00 /lb Cu, US$1250 /oz Au, and US$17 /oz Ag.
4. Metallurgical recoveries to concentrates are based on the “Centralized Milling of Newfoundland Base Metal Deposits - Bench Scale DMS and
Flotation Test Program” (Thibault & Associates Inc., 2017). Metal recoveries are 83.0% Cu, 13.3% Au, and 7.84% Ag in the copper concentrate,
84.3% Pb, 10.5% Au, and 50.3% Ag in the lead concentrate, and 87.2% Zn, 8.28% Au, and 14.8% Ag in the zinc concentrate.
5. Net Smelter Return (NSR) $US/t values were determined by calculating the value of each Mineral Resource model block using an NSR
calculator. The NSR calculator uses the stated metal pricing, metallurgical recoveries to concentrates, concentrate payable f actors and
current shipping and smelting terms for similar concentrates.
6. Pit optimization parameters include: mining at $3 US per tonne, processing at $15 US per tonne, and G&A at $2 US per tonne (total $20 US
per tonne).
7. Mineral Resources are reported at a cut -off value of $20 US/t NSR within the optimized pit shell and is considered to reflect reasonable
prospects for economic extraction by open pit mining methods.
8. Mineral Resources were interpolated using Inverse Distance Squared methods applied to 1.5 m downhole assay composites.
9. Results of an interpolated Inverse Distance Squared bulk density model (g/cm3) were applied.
10. Mineral resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant
issues.
11. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.
12. Mineral Resource tonnages have been rounded to the nearest 10,000. Totals may vary due to rounding.
Figure 1. Central Newfoundland Mining District
Table 2. 2024 drill collar locations:
Hole ID Length
(m) Azimuth Dip Northing
(UTM NAD83 Zone 21)
Easting
(UTM NAD83 Zone 21)
H-24-3381Ext 286.0 0 -90 5374038 521046
4
H-24-3527 310.0 180 -80 5408010 509775
H-24-3528 298.2 180 -80 5407971 509490
H-24-3529 367.0 180 -80 5408196 509525
*H-24-3530 77.5 256 -53 5407974 509835
H-24-3531 61.0 0 -70 5407771 510003
H-24-3532 90.0 0 -80 5407796 510003
H-24-3533 253.0 0 -90 5408013 509728
*H-24-3530 abandoned in former mine workings before reaching target depth. Assays for holes 3532 and 3533 are
pending.
Figure 2. 2024 drill collar locations relative to limits of the Lundberg stockwork mineralization (projected vertically to surface).
Newfoundland and Labrador Junior Exploration Assistance
Canterra gratefully acknowledges the financial support it may receive from the Junior Exploration Assistance
Program from the government of Newfoundland and Labrador in relation to the Company’s Buchans drilling
program.
QA/QC Protocols
Core and rock samples, including standards, blanks and duplicates, were submitted to Eastern Analytical Ltd. in
Springdale, Newfoundland for preparation and analysis. All samples were acquired by saw -cut (NQ drill core) with
one-half retained for reference and one -half submitted for analys es. Samples were submitted in sealed bags
delivered by Canterra personnel to Eastern’s assay laboratory, an accredited assay lab conforming to ISO/IEC 17025
requirements. Samples were analyzed using the Au (Fire assay) 30g + ICP -34 method utilizing a 200 mg subsample
dissolved in four acids and analyzed by the ICP -OES analytical technique. Over -limits for Cu, Pb, Zn and Ag were
analyzed using the atomic absorption method where a 0.200 g to 2.00 g sub -sample was digested with three acids.
Eastern Analytical Ltd. achieved ISO 17025 accreditation in February 2014 (for more details on the scope of
accreditation visit the CALA website). Canterra also routinely submits representative pulps prepared by Eastern to
ALS Geochemistry’s laboratory in Moncton New Brunswick as additional independent check assays.
5
Qualified Person
Paul Moore MSc. P.Geo . (NL), Vice President of Exploration for Canterra Minerals Corporation, a Qualified Person
within the meaning of National Instrument 43 -101, has reviewed the technical disclosure in this news release for
accuracy and either prepared or supervised its preparation.
About Canterra Minerals
Canterra is a diversified minerals exploration company focused on critical minerals and gold in central
Newfoundland. The Company’s projects include six mineral deposits located in close proximity to the world -
renowned, past producing Buchans mine and Teck Resources’ former Duck Pond mine that collectively produced
copper, zinc, lead, silver and gold. Several of Canterra’s deposits support historical Mineral Resource Estimates
prepared in accordance with National Instrument 43 -101 and the Canadian Institute of Mining, Metallurgy, and
Petroleum Definition Standards for Mineral Resources and Mineral Reserves current at their respective effective
dates (collectively the “Historical Resource Estimates”). Canterra’s Historical Resource Estimates are deemed
historical as they were prepared prior to their acquisition by Canterra. Canterra’s gold projects are located on-trend
of Calibre Mining’s Valentine mine currently under construction and cover a ~60 km extension of the same structural
corridor that host s mineralization within Calibre’s mine project. Past drilling by Canterra and others within the
Company’s gold projects intersected multiple occurrences of orogenic style gold mineralization within a large land
position that remains underexplored.
Notes:
(1) True widths estimated to be a minimum of 90% of reported core lengths. Copper equivalents based on total contained
copper and metal prices as of October 22, 2024 (Cu – US$4.28/lb, Pb – US$0.93/lb, Zn – US$1.41/lb, Ag US$34.80/oz
and Au -US$2,746.50/oz).
(2) Copper Equivalent % = Cu% + ((Pb% * 22.046 * Pb Rec.* Pb price) + (Zn% * 22.046 *Zn Rec. * Zn price) + (Ag g/t/31.10348
*Ag Rec. * Ag price) + (Au g/t/31.10348 * Au Rec. * Au Price))/(Cu Price * 22.046 *Cu Rec.). Assumed total m Metal
recoveries are assumed to be 100%(Rec.)
(3) Lundberg mineral resource details available in Technical Report titled: “NI 43 -101 Technical Report and Mineral
Resource Estimate on the Lundberg Deposit, Buchans Area, Newfoundland and Labrador, Canada”; dated May 16, 2024,
effective date March 12, 2024; prepared by Matthew Harrington, P.Geo., of Mercator Geological Services, an
independent QP as defined under NI 43 -101 (report available under the Company’s profile on SEDAR+ at
www.sedarplus.ca or the Company’s website at www.canterraminerals.com).
(4) Past production figures from Kirkham, R.V., ed., 1987, Buchans Geology, Newfoundland. Geological Survey of Canada,
Paper 86-24, 288 p.
ON BEHALF OF THE BOARD OF CANTERRA MINERALS CORPORATION
Chris Pennimpede
President & CEO
Additional information about the Company is available at www.canterraminerals.com
For further information, please contact: +1 (604) 687-6644
Email: [email protected]
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Information
This press release contains statements that constitute “forward -looking information” (collectively, “forward-looking
statements”) within the meaning of the applicable Canadian securities legislation, including statements with respect
to estimated mineral r esources, the opening of avenues for substantial discoveries within the belt, the Buchans
Project being ripe for a modern approach with significant exploration potential for high grade VMS mineralizatio n,
the Company anticipating being strongly positioned to unveil the next mineral discovery in central Newfoundland. All
statements, other than statements of historical fact, are forward-looking statements and are based on expectations,
estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations,
beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases
such as “expects”, or “does not expect ”, “is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”,
“scheduled”, “forecasts”, “estimates”, “believes” or “intends” or variations of such words and phrases or stating that
certain actions, events or results “may” or “could”, “would” , “might” or “will” be taken to occur or be achieved) are
6
not statements of historical fact and may be forward-looking statements. Consequently, there can be no assurances
that such statements will prove to be accurate and actual results and future events could differ materially from those
anticipated in such statements. Except to the extent required by applicable securities laws and the policies of the TSX
Venture Exchange, the Company undertakes no obligation to update these forward -looking statements if
management’s beliefs, estimates or opinions, or other factors, should change. Factors that could cause future results
to differ materially from those anticipated in these forward -looking statements include risks associated possible
accidents and other risks associated with mineral exploration operations, the ris k that the Company will encounter
unanticipated geological factors, the possibility that the Company may not be able to secure permitting and other
governmental clearances necessary to carry out the Company’s exploration plans, the risk that the Company will not
be able to raise sufficient funds to carry out its business plans, and the risk of political uncertainties and regulatory
or legal changes that might interfere with the Company’s business and prospects.; as well as those risks and
uncertainties identified and reported in the Company's public filings under its SEDAR+ profile at www.sedarplus.ca.
Accordingly, readers should not place undue reliance on the forward -looking statements and information contained
in this press release. Except as required by law, the Company disclaims any intention and assumes no obligation to
update or revise any forward -looking statements to reflect actual results, whether as a result of new information,
future events, changes in assumptions, changes in factors affecting suc h forward-looking statements or otherwise.