Capstone Copper Reports Second Quarter 2025 Results Revenue reaches new all-time high Adjusted EBITDA sets quarterly record

Financials

July 31, 2025

Capstone Copper Reports Second Quarter 2025 Results

Revenue reaches new all-time high

Adjusted EBITDA sets quarterly record

Vancouver, British Columbia – Capstone Copper Corp. (“Capstone” or the “Company”) (TSX: CS) (ASX:

CSC) today reported financial results for the six months and quarter ended June 30, 2025 (“Q2 2025”). Link

HERE for Capstone’s Q2 2025 webcast presentation. Unless otherwise stated, results are presented in

United States dollars on a 100% basis.

Cashel Meagher, President and CEO of Capstone, commented: "Our second quarter was defined by

several key accomplishments, including achieving record copper production, generating significant cash

flow, and completing our balance sheet refinancing strategy. Earlier this month we also announced another

significant milestone with receipt of the Mantoverde Optimized permit, meaning we are no longer permit

constrained on throughput, and we plan to commence this lower risk, capital efficient project imminently. The

first half of the year was marked by solid performance, which we expect to further improve in the second half

as we track towards our reaffirmed full year guidance. Capstone Copper is extremely well-positioned for the

current environment and for the future, with a diverse portfolio of operating assets in the Americas, a robust

pipeline of peer leading growth projects, a highly experienced team and a strong financial position."

Q2 2025 OPERATIONAL AND FINANCIAL HIGHLIGHTS

• Record consolid ated total copper production for Q2 2025 was 57,416 tonnes at C1 cash

costs1 of $2.45/lb. Total Q2 2025 copper sold of 53,977 payable tonnes was approximately 1,800

tonnes below payable production largely driven by timing of sales at Mantos Blancos.

• Sulphide copper production for Q2 2025 was 47,086 tonnes at C1 cash costs 1 of $ 2.20/lb

compared to 30,374 tonnes at $2.58/lb in Q2 2024, largely driven by contributions from Mantoverde

sulphides following the successful ramp-up in 2024. Mantoverde sulphides produced 16,507 tonnes

of copper at C1 cash costs1 of $1.51/lb in Q2 2025.

• Net income attributable to shareholders of $24.0 million , or $0.03 per share for Q2 2025 ,

compared to net income attributable to shareholders of $29.3 million , or $0.04 per share for Q2

2024. Adjusted net income attributable to shareholders 1 of $27.5 million, or $0.04 per share

for Q2 2025, compared to adjusted net income attributable to shareholders 1 of $20.9 million in Q2

2024.

• Record adjusted EBITDA1 of $215.6 million for Q2 2025 compared to $123.1 million for Q2 2024,

primarily due to increased sulphide copper production.

• Operating cash flow before changes in working capital of $212.4 million in Q2 2025 compared

to $102.9 million in Q2 2024.

• Net debt1 decreased to $691.9 million as at June 30, 2025 compared to $788.1 million as at

March 31, 2025 . Total available liquidity 1 of $1,106.6 million as at June 30, 2025 , comprised of

$311.6 million of cash and short-term investments, and $795.0 million of undrawn amounts on the

corporate revolving credit facility.

• Completed the balance sheet re-financing with a repayment of the $477 million outstanding

balance on the Mantoverde project finance facility, of which $334 million represented Capstone's

share. A new term loan was put in place for Mitsubishi Materials Corp.'s $145 million attributable

portion that includes a two-year grace period and termed out debt maturities.

NEWS RELEASE

TSX:CS ● ASX:CSC ● capstonecopper.com

1

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”.

• The Company reiterates the 2025 guidance of 220,000 to 255,000 tonnes of copper production

at $2.20 to $2.50 per pound cash costs1. Higher production is expected in the second half of 2025,

largely driven by mine sequence with Mantoverde moving out of transitional ore. Total 2025

sustaining and expansionary capital expenditure guidance of $315 million, plus an additional $210

million for capitalized stripping and $25 million for exploration, is also reaffirmed.

• The Company received the DIA environmental permit (“Declaración de Impacto Ambiental”)

for its Mantoverde Optimized ("MV Optimized" or "MV-O") project from the Atacama Regional

Environmental Assessment Commission.

OPERATIONAL OVERVIEW

Refer to Capstone's Q2 2025 MD&A and Financial Statements for detailed operating results.

Q2 2025 Q2 2024 2025 YTD 2024 YTD

Sulphide business

Copper production (tonnes)

Mantoverde2 16,507 58 32,775 58

Mantos Blancos 13,945 8,170 26,217 17,333

Pinto Valley 10,125 15,994 21,011 31,666

Cozamin 6,509 6,152 13,033 12,158

Total sulphides 47,086 30,374 93,036 61,215

C1 cash costs1 ($/pound) produced

Mantoverde2 1.51 — 1.51 —

Mantos Blancos 1.87 3.43 2.04 3.18

Pinto Valley 3.89 2.46 3.86 2.50

Cozamin 1.49 1.71 1.38 1.83

Total sulphides 2.20 2.58 2.17 2.57

Cathode business

Copper production (tonnes)

Mantoverde2 8,479 8,663 14,751 18,139

Mantos Blancos 1,851 1,900 3,425 3,704

Total cathodes 10,330 10,563 18,176 21,843

C1 cash costs1 ($/pound) produced

Mantoverde2 3.96 3.67 4.32 3.75

Mantos Blancos 3.64 3.15 3.79 3.32

Total cathodes 3.90 3.58 4.22 3.67

Consolidated

Copper production (tonnes) 57,416 40,937 111,212 83,058

C1 cash costs1 ($/pound) produced 2.45 2.80 2.52 2.84

Copper sold (tonnes) 53,977 39,748 107,112 80,744

Realized copper price1 ($/pound) 4.39 4.53 4.38 4.18

2 Mantoverde shown on a 100% basis (Capstone Copper ownership 70%).

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. 2

Sulphide Business

Q2 2025 sulphide production of 47,086 tonnes of copper in concentrate was 55% higher than 30,374 tonnes

in Q2 2024. The uplift was primarily driven by strong performance from the new sulphide concentrator at

Mantoverde, which contributed 16,507 tonnes versus negligible production in the prior year. Mantos Blancos

also delivered a notable increase in sulphide output, supported by higher throughput and grades driven by

the successful debottlenecking project in 2024 and mine sequence. These gains were partially offset by

lower production at Pinto Valley driven by lower mill throughput and grades. Cozamin maintained stable

output, with modest year-on-year improvement driven by higher grades aligned with the mine plan.

Q2 2025 C1 cash costs 1 decreased by 12% to $2.45/lb in Q2 2025 from $2.80/lb in Q2 2024, reflecting

increased production and lower unit costs at Mantoverde sulphides ($1.51/lb) and Mantos Blancos sulphides

($1.87/lb), where volumes have ramped up significantly. Cozamin further contributed to the reduction ($1.49/

lb), where lower unit costs were driven by higher by-product credits and a favourable foreign exchange

impact. These gains were partially offset by higher unit costs at Pinto Valley ($ 3.89/lb), where lower

throughput and operational disruptions led to cost inefficiencies. The combined C1 cash costs 1 profile

improvement reflects the benefit of scaling up low-cost sulphide operations.

Cathode Business

Q2 2025 cathode production of 10,330 tonnes of copper was 2% lower than 10,563 tonnes in Q2 2024 ,

mainly driven by lower oxide grades at Mantoverde, which more than offset stable performance at Mantos

Blancos.

Q2 2025 C1 cash costs 1 for the cathode business increased to $3.90/lb in Q2 2025 from $3.58/lb in Q2

2024. Cathode C1 cash costs 1 were primarily impacted by the combined effects of lower production

volumes, along with higher acid prices and consumption. The Company continues to actively manage this

business segment through grade optimization and cost hedging strategies to ensure positive margin

contribution.

Consolidated Production

Q2 2025 copper production of 57,416 tonnes was 40% higher than Q2 2024 primarily as a result of sulphide

production ramping up at Mantoverde and Mantos Blancos.

Q2 2025 C1 cash costs 1 of $2.45/lb were 12% lower than $2.80/lb in Q2 2024 mainly due to higher copper

production and lower production costs (-$0.12/lb) particularly at Mantoverde and Mantos Blancos as well as

increased by-product credits (-$0.15/lb) driven by higher gold production at Mantoverde and stronger gold

and silver prices. Additionally, favourable treatment and refining charges (-$0.04) provided further benefit.

Mantoverde Mine (70% owned)

Q2 2025 copper production of 24,986 thousand tonnes was 187% higher than Q2 2024 mainly due to higher

copper in concentrate production of 16,507 tonnes, partially offset by slightly lower cathode production

mainly driven by lower heap oxide copper grades as a result of mine sequence (0.30% in Q2 2025 versus

0.39% in Q2 2024).

In Q2 2025, Mantoverde's new sulphide concentrator delivered another strong operational performance,

contributing 16,507 tonnes of copper in concentrate. Q2 2025 sulphide plant throughput averaged 32,372

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. 3

tpd (April - 30,444 tpd, May - 31,861 tpd, June - 34,830 tpd), which exceeded the plant's design capacity.

Meanwhile, copper grades and recoveries were impacted by transitional mixed ore with elevated oxide

content in April and May. Q2 2025 copper grades averaged 0.72% (April - 0.67%, May - 0.73%, June -

0.76%), while copper recoveries averaged 77.6% (April - 73.6%, May - 72.7%, June - 85.2%).

Q2 2025 combined C1 cash costs 1 were $2.35/lb, 36% lower than $3.65/lb in Q2 2024 mainly related to

higher production driven by the new concentrate plant (-$1.34/lb). Q2 2025 cathode C1 cash costs 1 were

$3.96/lb, 8% higher compared to Q2 2024, mainly due to higher acid prices ($188/t in Q2 2025 versus $153/t

in Q2 2024) and consumption ($0.43/lb), partially offset by lower oxide mine movement (-$0.17/lb).

Mantos Blancos Mine (100% owned)

Q2 2025 production was 15,796 tonnes, composed of a record 13,945 tonnes of copper in concentrate from

sulphide operations and 1,851 tonnes of cathode from oxide operations, which was 57% higher than Q2

2024. The increase was attributable to higher sulphide mill throughput (quarterly record 21,295 tpd in Q2

2025 versus 16,219 tpd in Q2 2024) and higher sulphides feed grades as a result of mine sequence (0.89%

in Q2 2025 versus 0.76% in Q2 2024). Since achieving design sulphide mill throughput capacity in

November 2024, the plant has met or exceeded average design capacity in seven of the last eight months.

Combined Q2 2025 C1 cash costs 1 of $2.09/lb ($1.87/lb sulphides and $3.64/lb cathodes) were 35% lower

compared to combined C1 cash costs 1 of $3.22/lb in Q2 2024, mainly due to higher production in line with

plan (-$1.22/lb), lower diesel prices ($0.62/l in Q2 2025 versus $0.77/l in Q2 2024) (-$0.06/lb) and lower

treatment and selling costs (-$0.11/lb), partially offset by higher acid, diesel, explosive and energy

consumption ($0.11/lb) due to higher material moved driven by higher mill throughput.

Pinto Valley Mine (100% owned)

Q2 2025 copper production of 10,125 thousand tonnes was 37% lower than in Q2 2024 due to mine

sequence resulting in lower grades (Q2 2025 – 0.31% versus Q2 2024 - 0.36%) and lower mill throughput

during the quarter ( Q2 2025 - 38,268 tpd versus Q2 2024 - 55,420 tpd). Mill throughput in Q2 2025 was

impacted by unplanned downtime driven by water constraints due to the drought conditions in central

Arizona, as well as mechanical and electrical issues. The water constraints resulted in Pinto Valley operating

at two-thirds availability with four out of six mills online since May. Mitigation measures are in progress and

process availability is expected to increase to five out of six mills online in August, and all mills operational

by the end of Q3.

C1 cash costs 1 of $3.89/lb in Q2 2025 were 58% higher than Q2 2024 of $ 2.46/lb primarily due to lower

production volume ($1.53/lb) and higher contractor spend ($0.35/lb), partially offset by lower treatment and

selling costs (-$0.28/lb).

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. 4

Cozamin Mine (100% owned)

Q2 2025 copper production of 6,509 thousand tonnes was 6% higher than the same period prior year,

mainly on higher grades ( 2.01% in Q2 2025 versus 1.97% in Q2 2024 ) driven by mine sequence. Mill

throughput and recoveries were consistent quarter over quarter.

Q2 2025 C1 cash costs1 were $1.49/lb, 13% lower than $1.71/lb in the same period last year, mainly due to

higher production, higher silver by-product volume and price (-$0.12/lb), as well as lower operating costs

than the previous year (-$0.07/lb) impacted by a weakening of the Mexican peso relative to the US dollar.

2025 Guidance

The Company reiterates its 2025 consolidated production, C1 cash costs 1, capital expenditure, capitalized

stripping and exploration expenditure guidance as follows: 220-255kt consolidated production of copper,

$2.20-$2.50 C1 cash costs 1 per payable pound of copper, $315 million sustaining and expansionary capital

expenditure, $210 million capitalized stripping and $25 million exploration expenditure.

With respect to the asset level copper production and C1 cash cost 1 guidance ranges provided in January

2025, the Company notes the following: Mantos Blancos and Cozamin are trending towards the upper end

of production and the lower end of costs, Mantoverde is trending towards the mid point of both production

and costs, and Pinto Valley is trending towards the lower end on production and upper end of costs. This is a

result of a combination of stronger sulphide throughput at Mantoverde and Mantos Blancos, as well as

higher-than-expected grades at Cozamin, offset by lower-than-expected throughput at Pinto Valley due to

unplanned downtime and water constraints, as well as lower recoveries at Mantoverde based on mining

transitional mixed ore in April and May.

KEY UPDATES

Capstone Copper has expansion optionality across its portfolio with a combination of attractive brownfield

and greenfield opportunities in top-tier mining jurisdictions in the Americas. Capstone Copper is advancing

these growth opportunities, which are at various stages. A potential sanctioning decision for each project is

subject to a variety of factors, including macroeconomic conditions.

MV Optimized Brownfield Expansion Project

Mantoverde Optimized (“MV Optimized” or “MV-O”) is a capital-efficient brownfield expansion of

Mantoverde's sulphide concentrator, increasing throughput from 32,000 to 45,000 ore tpd and extending the

mine life from 19 to 25 years.

During Q2 2025 approximately $20 million in long lead items for MV-O were approved. In July 2025, the

Company received the DIA environmental permit (“Declaración de Impacto Ambiental”) for the Mantoverde

Optimized project from the Atacama Regional Environmental Assessment Commission. The issuance of this

permit represents a significant milestone for the advancement of the project, as it was the only major permit

required for the development and operation of MV-O.

The Company plans to provide further updates with respect to its 2025 expansionary capital guidance and

MV-O project timing upon formal project sanctioning, subject to all Board approvals in Q3 2025.

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. 5

Mantoverde Phase II

The Company is in the early stages of evaluating the next major phase of growth for Mantoverde, which

could include the addition of an entire second processing line. There are 0.2 billion tonnes of Measured &

Indicated Mineral Resources and 0.6 billion tonnes of Inferred sulphide Mineral Resources in addition to the

reserves that are currently being considered as part of MV Optimized. In addition, exploration targets include

the northern portion of the current Mantoverde pit and the northern extension (~10km long) of the projection

of the prospective Atacama fault system, which are planned to assist in determining the location of key

infrastructure and the economic viability of the project.

Santo Domingo Project

Capstone Copper announced the results of an updated Feasibility Study ("FS") for its 100%-owned Santo

Domingo copper-iron-gold project in Region III Chile, 35km northeast of Mantoverde on July 31, 2024. The

updated FS, completed by Ausenco, outlines the next phase of transformational growth for the Company in

the world-class Mantoverde-Santo Domingo ("MV-SD") district.

The FS for Santo Domingo outlines a robust copper-iron-gold project with an after-tax NPV (8%) of $1.7

billion and an after-tax internal rate of return of 24.1% based on long-term copper, 65% iron ore, and gold

price assumptions of $4.10/lb, $110/t, and $1,800/oz, respectively. Total initial capital cost of $2.3 billion

drives a capital intensity of approximately $21,900 per tonne of annual copper equivalent production over the

life of mine. Over the first seven years of the mine plan, production is expected to average 106,000 tonnes of

copper and 3.7 million tonnes of iron ore magnetite concentrate at first quartile cash costs of $0.28 per

payable pound of copper produced.

The FS updated the level of engineering to Association for the Advancement of Cost Engineering ("AACE")

Class 3. During 2025, detailed engineering efforts are underway to increase the precision of capital

estimates to AACE Class 2.

The Company is at an advanced stage in its Santo Domingo partnership process and we expect to

announce a partner during Q3. In parallel, we are advancing opportunities to incorporate the recently

acquired Sierra Norte project, along with Santo Domingo’s copper oxide and cobalt material into the mine

plan, while also advancing financing discussions. A potential project sanctioning decision is not anticipated

prior to mid-2026.

Sierra Norte is located approximately 15 kilometers northwest of the Santo Domingo Project and represents

an opportunity to potentially be a future sulphide feed source for Santo Domingo, extending the higher grade

copper sulphide life. Potential oxide material at Sierra Norte represents an opportunity to be a future oxide

feed for Mantoverde's underutilized SX-EW plant.

Mantoverde - Santo Domingo Pyrite Augmentation & Cobalt

A district cobalt plant for the MV-SD district is designed to unlock cobalt production while reducing sulphuric

acid consumption and increasing heap leach copper production. The cobalt recovery process comprises a

pyrite flotation step to recover cobaltiferous pyrite from the tailings streams at Mantoverde and Santo

Domingo and redirect it to the dynamic heap leach pads, which will be upgraded to a bioleach configuration

through the addition of an aeration system as part of MV Optimized. The pyrite oxidizes in the leach pads

and the solubilized cobalt is recovered via an ion exchange plant treating a bleed stream from the copper

solvent extraction plant. The approach has been successfully demonstrated at the bench and pilot scales.

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. 6

An initial cobalt assay of expected quality has been sent to potential customers for feedback, which has

been overall positive.

As currently envisioned, a smaller capacity plant will initially treat cobalt by-product streams from

Mantoverde only, producing up to 1,500 tonnes per annum of cobalt, and following sanctioning of the Santo

Domingo project, the facility will be expanded to accommodate by-product streams from Santo Domingo. A n

initial study focused on Mantoverde's pyrite augmentation and cobalt opportunity is expected in 2025,

followed by a Santo Domingo study in 2026, for a combined MV-SD target of 4,500 to 6,000 tonnes per

annum of cobalt production.

Mantos Blancos Phase II

The Company is currently evaluating the next phase of growth for Mantos Blancos, which is analyzing the

potential to increase the concentrator plant throughput to at least 27,000 tpd and increase cathode

production from the underutilized SX-EW plant. The sulphide concentrator plant expansion is expected to

utilize existing and unused or underutilized process equipment, plus additional equipment for concentrate

filtration, thickening and filtering of tailings. During Q2 2025, individual peak daily sulphide mill throughput

totaled 25,980 tpd as the plant was pushed to identify bottlenecks. The increase in cathode production is

being evaluated based on an opportunity to re-leach spent ore from historical leaching and flotation

operations. The increase in cathode production would utilize existing SX-EW plant capacity, with the addition

of a dynamic leach pad, agglomeration and stacking infrastructure. The Mantos Blancos Phase II study is

expected in 2026.

PV District Growth

The Company continues to review and evaluate the consolidation potential of the Pinto Valley district.

Opportunities under evaluation include a potential mill expansion and increased leaching capacity supported

by optimized water, heap and dump leach, and tailings infrastructure. Pinto Valley district consolidation could

unlock significant ESG opportunities and may transform the Company's approach to create value for all

stakeholders in the Globe-Miami District.

Corporate Exploration Update

Capstone Copper’s exploration team is predominantly focused on organic growth opportunities to expand

Mineral Resources and Mineral Reserves at all four mines and at the Santo Domingo development project.

Capstone Copper also recently acquired Sierra Norte and maintains a portfolio of 100% owned claims

acquired by staking in Sonora, Mexico and in Northern Chile.

At Mantoverde, during Q2 2025, exploration activities continued with up to eight rigs operating on site. The

ongoing two-year exploration program, totaling approximately $25 million and 61,500 metres of drilling, has

reached 40% completion by the end of the quarter. The first phase, comprising ~30,000 metres of drilling is

on track and is expected to be completed in Q3 2025. Drilling has focused on areas adjacent to the MV-

Optimized pit, aiming to improve copper grades and mineralization continuity within and near the pit

boundaries, as well as to begin testing priority targets located just north of the current Mantoverde pit. Initial

results from the Animas and Santa Clara Corridor targets have been encouraging, providing strong support

for continued follow-up drilling.

The next and second phase of the drilling program is expected to commence in Q4 2025 and will

concentrate on follow-up drilling at the targets adjacent to the northern portion of the pit, in addition to testing

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. 7

high-priority targets along the 10-kilometre-long northern corridor, which were defined based on the results

of the induced polarization (IP) geophysical survey completed in Q1 2025.

Additionally, at Mantoverde, infill drilling continued to advance during the quarter, with efforts focused on the

southern Mantoverde area, specifically at the West Wall zone. The objective of this drilling is to improve

resource categorization in support of future mine planning

At Mantos Blancos, infill drilling continued during Q2 2025, with activities focused on Phases 15, 16, 23, and

25. In parallel, sonic drilling advanced over the historic stockpile.

At Sierra Norte, work continued during Q2 2025 with the completion of the re-logging of representative cross

sections, as well as the validation of the historical drilling database and the development of an updated

geological model. A re-assay program is currently in progress to further support the validation of the drilling

database. This work is intended to support potential future drilling programs and a Mineral Resource

estimation.

At Cozamin during Q2 2025, exploration drilling continued targeting step-outs up-dip and down-dip from the

Mala Noche West Target, down-dip of other historical Mala Noche Vein workings, and deep drill tests below

MNFWZ. Drilling at Mala Noche was conducted with one underground rig positioned at the level 19.1 cross-

cut, a second underground rig positioned at the level 12.7 cross-cut, and one surface rig. Drilling at MNFWZ

was conducted with one underground rig positioned at the level 11 cross-cut.

FINANCIAL OVERVIEW

Please refer to Capstone's Q2 2025 MD&A and Financial Statements for detailed financial results.

($ millions, except per share data) Q2 2025 Q2 2024 2025 YTD 2024 YTD

Revenue 543.2 393.1 1,076.5 733.0

Net income (loss) 30.0 27.5 28.9 21.7

Net income (loss) attributable to shareholders 24.0 29.3 17.2 24.5

Net income (loss) attributable to shareholders per common share - basic

and diluted ($) 0.03 0.04 0.03 0.03

Adjusted net income1 27.5 20.9 35.5 16.4

Adjusted net income attributable to shareholders per common share - basic

and diluted 0.04 0.03 0.05 0.02

Operating cash flow before changes in working capital 212.4 102.9 378.4 165.1

Adjusted EBITDA1 215.6 123.1 395.5 203.2

Realized copper price1

($/pound) 4.39 4.53 4.38 4.18

1 These are Non-GAAP performance measures. Refer to the section titled “Non-GAAP and Other Performance Measures”. 8