Critical Elements Announces the Appointment of Mr. Kenneth Williamson as Director of Exploration
1
PRESS RELEASE
CRITICAL ELEMENTS ANNOUNCES THE APPOINTMENT OF MR. KENNETH
WILLIAMSON AS DIRECTOR OF EXPLORATION
November 10th, 2025 - MONTRÉAL, QUÉBEC – Critical Elements Lithium Corporation (TSX-V: CRE) (US
OTCQX: CRECF) (FSE: F12) ( "Critical Elements" or the "Corporation”) is pleased to announce the
appointment of Mr. Kenneth Willi amson to the position of Director of Exploration. This newly created role
with Critical Elements follows his experience as Vice-President Exploration for Power Metallic Mines Inc.
(formerly Power Nickel), where his efforts were material to the confirmation and expansion of the Nisk
Copper-Nickel deposit and participated to the discovery and the growth of the polymetallic Lion zone.
Mr. Kenneth Williamson (M.Sc., P.Geo), is a professional geologist with over 20 years of experience in the
mining industry. Ken neth graduated from the University of Laval with a Master's Degree in Structural
Geology in 2002. He was a Ph.D. candidate from 2002 to 2006, with studies on the structural controls
leading to the formation of the world-class Goldcorp High Grade Zone. His work led to his appointment as
Special Project Geologist at the Goldco rp Red Lake Mine in 2004. Kenneth brings his robust industry
experience born of a strong scientific approach combined with the practicality necessitated by the “daily
rush to feed the mill with high grade material”.
Throughout Ken’s career, 3D modeling has been central to his work, materially advancing the knowledge
of:
• The Red Lake Mine litho-structural model during his Ph.D.
• The unified Campbell -Red Lake deposit -scale and Red Lake district -scale 3D litho -structural
models after the merger of Goldcorp and Placer Dome in 2006.
• The Matagami district scale 3D geology model while at Québec’s Ministère des Ressources
naturelles et des Forêts in 2011.
• While with Premier Gold Mines in 2013 to 2015, the structural framework used at the Greenstone
Gold Mine, now in its first year of production by Equinox Gold Corp.
• The structural model and targeting strategies at Radisson Mining Resources Inc.’s O’Brien mine
between 2017 to 2019.
• The confirmation and expansion of the Nisk Copper -Nickel deposit and the discovery of the
polymetallic Lion zone between 2019 to 2024, while working as consultant and later as Vice-
President Exploration for Power Metallic Mines Inc.
“I am excited to team up with Critical Elements on this project and participate in the generation of a robust
3D model and targeting strategy along the Corporation’s extensive 100 kilometer-long Nemaska belt land
position,” noted Kenneth Williamson . “We will build a r igorous drill plan benefiting from the exciting
preliminary exploration results recently published on the Nemaska Belt properties.” See the news release
dated November 4, 2025.
CEO Jean-Sébastien Lavallée a dded, “We are excited to have Ken join the Critical Elements team and
apply his extensive skill and experience. The logistics and preparation for a winter drill program on the Rose
West lithium discovery located within 10 km of our flagship Rose Lithium-Tantalum project are in progress
with drilling expected to commence this winter, shortly after freeze-up. Drill targeting on the Nemaska Belt
will flow from compilation of the summer exploration data and Ken’s invaluable work.”
2
About Critical Elements Lithium Corporation
Critical Elements aspires to become a large, responsible supplier of lithium to the flourishing electric vehicle
and energy storage system industries. To this end, Critical Elements is advancing the wholly -owned, high-
purity Rose Lithium-Tantalum project in Québec, the Corporation’s first lithium project to be advanced within
a land portfolio of over 1,0 16 km2. On August 29, 2023, the Corporation announced results of a new
Feasibility Study on Rose for the production of spodumene concentrate. The after-tax internal rate of return
for the Project is estimated at 65.7%, with an estimated after -tax net present value of US$2.2B at an 8%
discount rate. In the Corporation’s view, Québec is strategically well-positioned for US and EU markets and
boasts good infrastructure including a low-cost, low-carbon power grid featuring 94% hydroelectricity. The
project has received approval from the Federal Minister of Environment and Climate Change on the
recommendation of the Joint Assessment Committee, comprised of represen tatives from the Impact
Assessment Agency of Canada and the Cree Nation Government, received the Certificate of Authorization
under the Environment Quality Act from the Québec Minister of the Environment, the Fight against Climate
Change, Wildlife and Parks, and the project mining lease from the Québec Minister of Natural Resources
and Forests under the Québec Mining Act.
For further information, please contact:
Jean-Sébastien Lavallée, P. Géo.
Chief Executive Officer
819-354-5146
www.cecorp.ca
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is described in the policies of
the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary statement concerning forward-looking statements
This news release contains “forward -looking information” within the meaning of Canadian Securities
legislation. Generally, forward -looking information can be identified by the use of forward -looking
terminology such as “scheduled”, “anticipates”, “expects” or “does not expect”, “is expected”, “scheduled”,
“targeted”, or “believes”, or variations of such words and phrases or statements that certain actions, events
or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forwa rd-looking
information contained herein include, without limitation, statements relating to the planned 2026 exploration
program on the Nemaska Belt properties and the planned drilling campaign on the Corporation’s Rose
West zone. Forward-looking information is based on assumptions management believes to be reasonable
at the time such statements are made. There can be no assurance that such statements will prove to be
accurate, as actual results and future events could differ mate rially from those anticipat ed in such
statements. Accordingly, readers should not place undue reliance on forward -looking information.
Forward-looking information contained herein is made as of the date of this news release. Although the
Corporation has attempted to identify important factors that could cause actual results to differ materially
from those contained in the forward -looking information or implied by forward -looking information, there
may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers
should not place undue reliance on forward-looking statements or information. The Corporation undertakes
no obligation to update or reissue forward -looking information as a result of new information or events
except as required by applicable securities laws.