Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CPL.V ·

Copper Lake Reports High-Grade Assays Obtained IN First Deep Hole ON New Vtem/Deep IP Discovery at Marshall Lake VMS Property, Ontario

Drill Results

News Release No: 22-07

COPPER LAKE REPORTS HIGH-GRADE ASSAYS OBTAINED IN

FIRST DEEP HOLE ON NEW VTEM/DEEP IP DISCOVERY

AT MARSHALL LAKE VMS PROPERTY, ONTARIO

June 14, 2022 – Toronto, ON – Copper Lake Resources Ltd. (TSX -V: CPL, Frankfurt: WOI,

OTC: WTCFZ) (“Copper Lake” or the “Company”) is pleased to report high- grade assay results

from its recently completed drill program, undertaken on its Marshall Lake copper-zinc- silver-

gold volcanogenic massive sulphide (VMS) property (the “Property”), located northeast of

Thunder Bay, Ontario. Specifically, the assays reported herein, are from drill hole Mar-22-01, the

first deep hole drilled on a new discovery known as the VTEM/Deep IP discovery.

Drill Results

A total of six (6) significant intervals of base and precious metal mineralization were obtained

from hole Mar -22-01, as tabulated below. Silver assays remain pending and will be reported

separately, when received.

Hole No. From

(m)

To (m) Interval

(m)

%Cu %Pb %Zn Ag (g/t) Au (g/t)

Mar-22-01 137.15 139.25 2.10 0.53 0.28 3.00 pending 0.02

236.00 239.00 3.00 1.47 0.01 1.54 pending 0.02

272.05 274.20 2.15 2.40 0.04 3.37 pending 0.22

298.06 300.17 2.11 8.13 0.05 7.26 pending 0.33

311.20 313.15 1.95 5.81 0.01 7.32 pending 0.02

369.00 374.11 6.00 2.37 0.01 1.75 pending 0.37

1Analyses completed by Activation Laboratories in Ancaster, Ontario, Ontario utilizing the 1A2 – Fire Assay AA

finish, IH INAA (INAAGEO)/Total Digestion (Total) and the UT-7, Sodium Peroxide Fusin (ICP & ICP MS)

analytical packages

Highlighting the results, are 2 high -grade intervals returning 8.14% Cu, 0.05% Pb, 7.26% Zn

and 0.33 g/t Au over 2.11 metres as well as 5.81% Cu, 0.01% Pb, 7.32% Zn and 0.02 g/t Au

over 1.95 metres. Intersected widths are believed to be close to true widths.

An earlier shallow drill hole completed on the VTEM/Deep IP discovery (Mar -21-03) yielded

1.43% Cu, 0.11% Pb, 2.35 Zn, 109.67 g/t Ag & 1.41 g/t Au over 11.87 metres (including

5.30% Cu, 0.06% Pb, 6.43% Zn, 315.58 g/t Ag & 2.27 g/t Au over 2.67 metres & 1.74% Cu,

0.05% Pb, 4.13% Zn, 122.24 g/t Ag & 0.51 g/t Au over 2.59 metres (see Copper Lake news

releases dated May 10, 2022 and April 19, 2022).

A recently completed borehole electromagnetic survey (BHEM) by the Company, defined two

strong to very strong conductors (A & B), situated approximately 325 metres below surface. These

conductors are situated below and at greater depth than the high- grade intervals obtained in hole

Mar-22-01. The presence of such strong conductors situated at depth and below high- grade

mineralization is very encouraging as it solidifies and confirms the potential for discovering much

greater thicknesses of high-grade mineralization at depth (see Figures 1A, 1B & 1C).

Additional drilling is clearly warranted to test the strong conductors at depth; the priority holes

will be to test the heart of the conductive source that will include Conductors A & B. Such drilling

will be completed in the summer of 2022.

QUALIFIED PERSON

Donald Hoy, M. Sc., P. Geo., Copper Lake’s Vice President of Exploration, is the Qualified Person

responsible for the technical content contained in this news release.

ABOUT COPPER LAKE RESOURCES

Copper Lake Resources Ltd. is a publicly traded Canadian min eral exploration and development

company with interests in two projects both located in Ontario. www.copperlakeresources.com

The Marshall Lake high-grade VMS copper, zinc, silver and gold project, comprises an area of

approximately 220 square km located 120 km north of Geraldton, Ontario and is accessible by

all-season road from the Trans-Canada Highway and just 22 km north of the main CNR rail line.

Copper Lake has a 75% interest in the joint ventured property, which consists of 233 claims and

52 mining leases. The project also includes 148 claim cells staked in 2018 and 2020 that are

100% owned and not subject to any royalties, which add approximately 30 square km to the

original property.

In addition to the original Marshall Lake property above, Marshall Lake also includes the Sollas

Lake and Summit Lake properties, which are 100% owned by the Company and are not subject

to any royalties. T he Sollas Lake property consists of 20 claim cells comprising an area of 4

square km on the east side of the Marshall Lake property where historical EM airborne

geophysical surveys have outlined strong conductors on the property hosted within the same

favorable felsic volcanic units. The Summit Lake property currently consists of 100 claim cells

comprising an area of 20.5 square km, is accessible year-round, and is located immediately west

of the original Marshall Lake property. The Marshall Lake project is located in the traditional

territories of the Aroland and Animbiigoo Zaagi igan Anishinaabek (“AZA”) First Nations.

Copper Lake also has a 71.41% joint venture interest in the Norton Lake nickel, copper, cobalt,

and palladium PGM property, located in the southern Ring of Fire area, is approximately 100 km

north of the Marshall Lake Property. The Norton Lake property has a NI 43- 101 compliant

Measured and Indicated resource of 2.26 million tonnes @ 0.67% Ni, 0.61% Cu, 0.03% Co and

0.46 g/t Pd. The Norton Lake property is located in the traditional territories of the Eabametoong

(“Fort Hope”) and Neskantaga First Nations.

On behalf of the Board of Directors,

Copper Lake Resources Ltd.

Terry MacDonald, CEO

(416) 561-3626

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.