Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CPL.V ·

Copper Lake Announces Filing of Ni 43-101 Technical Report and Updated Mineral Resource Estimate FOR Norton Lake Nickel-Copper-Cobalt-PGE Deposit, Northwestern Ontario

Resource Estimates Technical Reports (NI 43-101)

News Release No: 23-09

COPPER LAKE ANNOUNCES FILING OF NI 43-101 TECHNICAL

REPORT AND UPDATED MINERAL RESOURCE ESTIMATE FOR

NORTON LAKE NICKEL-COPPER-COBALT-PGE DEPOSIT,

NORTHWESTERN ONTARIO

October 3, 2023 – Toronto, ON – Copper Lake Resources Ltd. (TSX-V: CPL, Frankfurt: WOI, OTC:

WTCZF) (“Copper Lake” or the “Company”) is pleased to announce the filing of the technical report (the

“Report”) for the updated Mineral Resource Estimate (the “MRE”), prepared in accordance with National

Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”), on its Norton Lake Nickel-

Copper-Cobalt-Palladium-Platinum Deposit (the “ Deposit”), situated 50 km northeast of Fort Hope and

approximately 413 km northeast of the port City of Thunder Bay, northwestern Ontario. The Report is

titled, “National Instrument 43-101 Mineral Resource Estimate and Technical Report for the Norton Lake

Ni-Cu-Co-Pd-Pt Property”, with an effective date of August 12, 2023, and prepared for Copper Lake by

Caracle Creek Chile SpA and Atticus Geoscience Consulting S.A.C. The Report is available under the

Company’s profile on S EDAR+ at www.sedarplus.ca or from the Company’s website at

www.copperlakeresources.com. This news release and Mineral Resource Estimate supersedes the news

release dated September 7, 2023, which reported erroneously on an earlier version of the Norton Lake

Deposit mineral resource estimate.

Highlights of the current Mineral Resource Estimate (Table 1) are as follows:

• Open pit and underground Measured + Indicated Resources of 1,795,000 tonnes at an average grade

of 0.72% NI, 0.69% Cu, 339 ppm Co, 0.52 g/t P d, 0.17 g/t Pt and containing 28.3Mlbs of nickel and

27.3Mlbs of copper.

• Open pit and underground Measured Resources of 86 1,000 tonnes at an average grade of 0.66% Ni,

0.62% Cu, 326 ppm Co, 0.46 g/t P d, 0.17 g/t Pt and containing 12.5Mlbs of nickel and 11.8Mlbs of

copper.

• Open pit and underground Indicated Resources of 934,000 tonnes at an average grade of 0.77% Ni,

0.75% Cu, 351 ppm Co, 0.56 g/t P d, 0.18 g/t Pt and containing 15.8Mlbs of nickel and 15.5Mlbs of

copper.

• Open pit and underground Inferred Resources of 562, 000 tonnes at an average grade of 0.67% Ni,

0.63% Cu, 310 ppm C o, 0.50 g/t P d, 0.14 g/t P t and containing 8.2Mlbs of nickel and 7.8Mlbs of

copper.

“This updated Mineral Resource Estimate confirms that the Norton Lake Deposit has sufficient size, grade

and expansion potential to be regarded as a significant exploration project in the North American EV metal

space.”, stated Terry MacDonald, CEO of Copper Lake , “Additionally, the style of magmatic nickel -

bearing mineralization and the favourable geological setting, indicate significant expansion potential for

the deposit itself and for finding additional similar deposits elsewhere on the Property.”

The Norton Lake Deposit is hosted within the Norton Lake intrusion, a discrete sill- like mafic-ultramafic

body of Archean age. Semi -massive to massive sulphide mineralization occurs in the mafic- ultramafic

intrusion, at the contact between an underlying, sheared amphibolitic tuff and sedimentary rocks and an

overlying sequence of mafic volcanic rocks. The Deposit is characterized by two, higher -grade semi -

massive sulphide lenses within it and has been traced by diamond drilling over a strike length of close to

300 metres and to a maximum depth of 400 metres below surface. It currently remains open at depth for

expansion.

Table 1. Mineral Resource Statement: Measured, Indicated and Inferred Resources as of August 12, 2023.

1. The independent Qualified Person for the MRE, as defined by NI 43-101, is Mr. Simon Mortimer,

(FAIG #7795) of Atticus Geoscience Consulting S.A.C., working with Caracle Creek International

Consulting Inc. The effective date of the MRE is August 12, 2023.

2. These Mineral Resources are not Mineral Reserves as they do not have demonstrated economic

viability. The quantity and grade of reported Inferred Resources in this MRE are uncertain in nature

and there has been insufficient exploration to define these Inferred Resources as Indicated.

However, it is reasonab ly expected that the majority of Inferred Mineral Resources could be

upgraded to Indicated Mineral Resources with continued exploration.

3. The MRE was prepared following CIM Definition Standards on Mineral Resources and Reserves

(2014) and CIM Best Practice Guidelines (2019).

4. 3D geological modelling revealed that the mineralization exists as a single steeply dipping

continuous unit that runs along the basal contact of an ultramafic-mafic intrusion which has been

sheared and brecciated.

5. The estimation domains were defined by combining the lithology and structural models then

utilizing a nickel mineralization threshold of 1.08% Ni as a proxy to define the high-grade massive

sulphide domain. Geological and block models for the MRE used core assays (970 samples), data

and information from 60 surface diamond drill holes (4 from Copper Lake and 56 historical). The

drill hole database was validated prior to resource estimation and QA/QC checks were made using

industry-standard control charts for blanks, core duplicates and commercial certified reference

material inserted into the core assay batches.

6. Estimates have been rounded to three significant figures for Measured and Indicated categories,

and two significant figures for the Inferred categorization.

7. The MRE was constrained by a conceptual open pit using the following optimization parameters,

as reviewed and agreed to by the QP. Metal prices in US$: $8.00/lb nickel, $3.25/lb copper,

$13.00/lb cobalt, $900/oz for platinum and $1,200/oz for palladium. An overall pit slope of 45

degrees was used. Mining and processing costs (US$) were based on benchmarking from similar

deposit types, utilizing a mining cost of $4.23 /t, a processing cost of C$11.54/t, a G&A cost of

C$2.31/t, and considering an exchange rate of 1.30C$/US$. All resources below the conceptual pit

are considered extractable via underground mining scenarios. A cut -off grade of 0.30% Ni was

applied to the resource block model for the reporting of the mineral resource statement.

8. The block model was prepared using Micromine 2020. A 4 m x 4 m x 4 m block model was created,

with sub-blocks to 1 m x 1 m x 1 m. Drill composites of 1 m intervals were generated within the

estimation domains, and sub sequent grade estimation was carried out for Ni, Cu, Co, Pt and Pd

using an inverse distance weighting (IDW) interpolation method.

9. Grade estimation was validated by a secondary estimation method (nearest neighbour) and through

comparison of input and output statistics, swath plot analysis, and by visual inspection of the assay

data, block model, and grade shells in cross-sections.

10. Density estimation was carried out for the mineralized domains using the inverse distance

weighting (IDW) interpolation method within the mineralised domains and through assigning a

standard value to each rock type outside the mineralised area. A total of 121 specific gravity

measurements were used, and as a reference, the average estimated density value withi n the

mineralised domain is 3.35 g/cm3 (t/m3).

Qualified Persons

The Norton Lake M ineral Resource Estimate and Technical Report was prepared by Simon Mortimer,

FAIG of Atticus Geoscience Consulting S.A.C., Scott Jobin-Bevans, P.Geo, PhD, PMP of Caracle Creek

Chile SpA, and John Siriunas, P.Eng., M.A.Sc. of Caracle Creek International Consulting Inc. who are all

independent Qualified Persons, for the purposes of National Instrument 43 -101, Standards of Disclosure

for Mineral Projects. Dr. Jobin-Bevans, Mr. Mortimer, and Mr. Siriunas have reviewed and approved the

technical content of this news release.

Norton Lake Ni-Cu-Co-Pd-Pt Property - Exploration Upside

Geological and geophysical evidence suggests that there is more than 11 km of strike length on the Property

prospective for the discovery of additional magmatic Ni -Cu-Co-PGE mineralization. Ultramafic rocks,

similar to those that host the Norton Lake deposit have been mapped on the property; accordingly, these

are prospective for the discovery of similar type deposits as Norton La ke. Geological evidence at the

Deposit suggests a conduit -feeder dike style of mineralization – such deposits tend to occur in clusters,

auguring well for exploration potential.

The Norton Lake deposit is associated with a series of airborne geophysical conductors situated on the south

flank of a magnetic high. Numerous other conductors are present in the locale of the Norton Lake deposit

and elsewhere on the property, which warrant follow-up.

Legacy borehole and large-loop electromagnetic (EM) data was recently recovered for surveys completed

on the Norton Lake Deposit and surrounding area. As far as known, aside from logistical reports, there was

no formal interpretation of this data completed at the time of the surveys. Such data will be interpreted and

modelled and will be of great assistance in directing future drill programs testing for depth extensions to

the Norton Lake deposit as well as for drill targeting, in and around the known deposit in the search for

additional mineralization.

Historic drilling testing the Norton Lake deposit intersected a new zone of Ni-Cu-Co-PGE mineralization,

known as the South zone. Drill holes U-4 and U-14 returned drill intercepts of 0.80% Ni, 1.07% Cu and

3.2 g/t Pt + Pd over 7.0 metres and 0.80% Ni, 0.30% Cu and 1.10 g/t Pt + Pd over 5.0 metres ,

respectively. The South zone appears to underlie the Norton Lake deposit and has only been tested by the

2 above drill holes, both at very shallow depth. Additional drilling is clearly warranted to expand this new

zone of mineralization.

Next Steps for Norton Lake

A thorough compilation of all data available for the Norton Lake property and surrounding area will be

completed to prioritize targets for upcoming exploration programs. This will include the integration of

legacy airborne surveys, historic diamond drilling data as well as all ground surveys that have been

completed to date.

Borehole and large-loop EM data generated from an earlier exploration program testing the Norton Lake

deposit and immediate locale, have been retrieved by Copper Lake. Interpretation and modelling of such

data will be completed to assist in directing future drilling programs, specifically to expand on the limits of

the known Norton Lake deposit and to provide targets prospective for satellite or nearby magmatic Ni-Cu-

Co-PGE deposits.

QUALIFIED PERSON

The scientific and technical information in this press release has been reviewed and approved by Donald

Hoy, M.Sc., P.Geo. and Copper Lake’s Vice President of Exploration, the Qualified Person as defined in

National Instrument 43-101.

ABOUT COPPER LAKE RESOURCES

Copper Lake Resources Ltd. is a publicly traded Canadian mineral exploration and development company

with interests in two projects both located in Ontario. www.copperlakeresources.com

The Marshall Lake high-grade VMS copper, zinc, silver and gold project , comprises an area of

approximately 220 square km located 120 km north of Geraldton, Ontario and is accessible by all-season

road from the Trans-Canada Highway and just 22 km north of the main CNR rail line. Copper Lake has a

79.45% interest in the joint ventured property, which consists of 233 claims and 52 mining leases . The

project also includes 148 claim cells staked in 2018 and 2020 that are 100% owned and not subject to any

royalties, which add approximately 30 square km to the original property.

In addition to the original Marshall Lake property above, Marshall Lake also includes the Sollas Lake and

Summit Lake properties, which are 100% owned by the Company and are not subject to any royalties.

The Sollas Lake property consists of 20 claim cells comprising an area of 4 square km on the east side of

the M arshall Lake property where historical EM airborne geophysical surveys have outlined strong

conductors on the property hosted within the same favorable felsic volcanic units. The Summit Lake

property currently consists of 100 claim cells comprising an area of 20.5 square km, is accessible year-

round, and is located immediately west of the original Marshall Lake property. The Marshall Lake project

is located in the traditional territories of the Aroland and Animbiigoo Zaagi igan Anishinaabek (“AZA”)

First Nations.

Copper Lake has a 69.79% joint venture interest in the Norton Lake nickel, copper, cobalt, and palladium

PGM property, located in the southern Ring of Fire area, is approximately 100 km north of the M arshall

Lake Property. The Norton Lake property is located in the traditional territories of the Eabametoong (“Fort

Hope”) and Neskantaga First Nations.

On behalf of the Board of Directors,

Copper Lake Resources Ltd.

Terry MacDonald, CEO

(416) 561-3626

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary and Forward-Looking Statements

This news release includes certain forward -looking statements and forward- looking information (collectively,

"forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements, other

than statements of historical fact, included herein including, without limitation, statements regarding the Private

Placement and proposed uses of the proceeds of the Private Placement, are forward-looking statements. Although the

Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to

be correct. Often, but not always, forward looking information can be identified by words such as "pro forma",

"plans", "expects", "will", "may", "should", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates",

"believes", "potential" or variations of such words including negative variations thereof, and phrases that refer to

certain actions, events or results that may, could, would, might or will occur or be taken or achieved. Forward-looking

statements involve known and unknown risks, uncertainties and other factors which may cause the actual results,

performance or achievements of the Company t o differ materially from any future results, performance or

achievements expressed or implied by the forward- looking statements. This forward-looking information reflects the

Company’s current beliefs and is based on information currently available to the Company and on assumptions the

Company believes are reasonable. These assumptions include but are not limited to: TSX Venture Exchange

acceptance of the Private Placement ; Market acceptance and approvals; and the anticipated closing date for the

Private Placement . Forward -looking information is subject to known and unknown risks, uncertainties and other

factors that may cause the actual results, level of activity, performance o r achievements of the Company to be

materially different from those expressed or implied by such forward-looking information. Such risks and other factors

may include, but are not limited to: general business, economic, competitive, political and social uncertainties;

general capital M arket conditions and M arket prices for securities; delay or failure to receive board or regulatory

approvals; the actual results of future operations; competition; changes in legislation, including environmental

legislation, affecting the Company; the timing and availability of external financing on acceptable terms; and lack of

qualified, skilled labour or loss of key individuals. A description of additional assumptions used to develop such

forward-looking information and a de scription of additional risk factors that may cause actual results to differ

materially from forward- looking information can be found in the Company’s disclosure documents on the System for

Electronic Document Analysis and Retrieval ( “SEDAR”) website at w ww.sedar.com. Although the Company has

attempted to identify important factors that could cause actual results to differ materially from those contained in

forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or

intended. Readers are cautioned that the foregoing list of factors is not exhaustive. Readers are further cautioned not

to place undue reliance on forward- looking information as there can be no assurance that the plans, intentions or

expectations upon which they are placed will occur. Forward- looking information contained in this news release is

expressly qualified by this cautionary statement. The forward- looking information contained in this news release

represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change

after such date. However, the Company expressly disclaims any intention or obligation to update or revise any

forward-looking information, whether as a result of new informati on, future events or otherwise, except as expressly

required by applicable securities law.