Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CPER.V ·

CopperCorp Awarded EDGI Co-Funding for Phase 2 Drilling at Jukes Cu-Au Prospect

Exploration Programs

Vancouver, B.C. (TSXV: CPER) (OTCQB: CPCPF)

CopperCorp Awarded EDGI Co-Funding for Phase 2

Drilling at Jukes Cu-Au Prospect

VANCOUVER, BC June 12, 2025 – CopperCorp Resources Inc. (TSXV: CPER) (OTCQB: CPCPF) (“CopperCorp”

or the “Company”) is pleased to announce that it has been awarded a Tasmanian Government’s

Exploration Drilling Grant Initiative (EDGI) for drilling at the Jukes prospect on its 100% owned Razorback

Copper-Gold-REE property in western Tasmania, Australia (Figures 1 and 2).

The Company applied for co -funding to undertake the drilling of a proposed 550m deep diamond core

drill hole located in a currently non-vehicle accessible part of the Jukes prospect. The EDGI grant allows

the Company to apply for a total refund of up to AUD $70,000 from 50% of direct diamond drilling costs,

plus AUD $20,000 for helicopter support costs incurred in drilling the proposed hole, subject to signing of

a funding agreement.

CopperCorp has recently submitted work program applications for a phase 2 drilling program at Jukes

where the Company completed a successful maiden drill campaign during late 20241. The planned second

phase includes up to 2,000m of initial drilling designed to test for strike and depth extensions to known

Cu-Au mineralization, with further drilling to be considered subject to results.

Stephen Swatton, President and CEO of CopperCorp commented:

“The Government has continued to demonstrate their belief in the importance of resources to the state by

offering these grants for new exploration greenfield initiatives and by their general support for ongoing

mining development in Tasmania. We are pleased to be awarded our third such grant.”

Jukes Prospect Recap

The Jukes prospect is located within the 100% C opperCorp owned Razorback Cu-Au-REE property, 10km

south of the Sibanye -Stillwater owned Mt Lyell copper -gold mining camp (3Mt contained copper and

3Moz contained gold). Jukes is characterized by anomalous IP chargeability , magnetics, and surface

geochemistry over a strike length of at least 700m (open) (Figure 3).

Previous drilling, including CopperCorp’s recent campaign in late 2024 1,2, has so far only tested the

southern edge of the interpreted mineralized system at Jukes (Figure 3), but results are very encouraging

with significant drill intercepts including:

JDD0011,2:

• 132.0m @ 0.35% Cu and 0.19g/t Au from 72.0m, including

• 25.0m @ 0.75% Cu and 0.4g/t Au from 72.0m,

• 10.1m @ 0.94% Cu and 0.69g/t Au from 128.5m, and

• 10.0m @ 0.67% Cu and 0.29g/t Au from 194.0m

550-800 West Pender St. Vancouver, BC V6C 2V6 | E: [email protected] | W: coppercorpinc.com

JDD002W1:

• 50.0m @ 0.66% Cu and 0.27g/t Au from 498.0m, including

• 20.0m @ 0.76% Cu and 0.17g/t Au from 498.0m; and

• 19.0m @ 0.86% Cu and 0.48g/t Au from 529.0m, including

• 2.05m @ 4.2% Cu and 1.66g/t Au from 545.4m

Historical underground adit channel sampling by CopperCorp also includes:

Jukes No.3 Main Adit (channel sampling)3:

• 31.0m @ 1.48% Cu and 0.83g/t Au, including

• 9.0m @ 2.92% Cu and 1.79g/t Au

Planned Phase 2 Drill Program

The Company is planning to drill up to 2,000m at Jukes. The proposed drilling work program is currently

awaiting formal approvals . The final drill plan for Razorback will be publicly announced when we have

received all permits in hand and can work with greater certainty on the scheduling going forward.

Initial drilling will step out approximately 400m north of previous drilling to test mineralization indicated

by very strong chargeability responses in previous gradient array IP surveys (Figure 3) and historical

exploration results such as 58.0m @ 0.74% Cu and 0.39g/t Au, including 18.0m @ 1.34% Cu and 1.09g/t

Au (Figure 4) from channel sampling of the King Jukes No. 1 Adit3. Extension drilling of 2024-hole JDD001

(132m @ 0.35% Cu, 0.19g/t Au) is also planned. The program may be expanded based on initial drilling

results or upcoming dipole-dipole IP survey findings.

550-800 West Pender St. Vancouver, BC V6C 2V6 | E: [email protected] | W: coppercorpinc.com

Figure 1. Southern Skyline Project properties and exploration target areas with magnetics TMI RTP image.

550-800 West Pender St. Vancouver, BC V6C 2V6 | E: [email protected] | W: coppercorpinc.com

Figure 2. Location of the Razorback property and the Jukes Zone target area relative to the Mt Lyell copper-

gold mine. Blue outlines are CopperCorp’s 100% owned licenses.

550-800 West Pender St. Vancouver, BC V6C 2V6 | E: [email protected] | W: coppercorpinc.com

Figure 3. Jukes prospect summary plan with Scintrex 1982 gradient array IP survey chargeability

(psuedocolour image) and historical rock chip sample copper assays.

550-800 West Pender St. Vancouver, BC V6C 2V6 | E: [email protected] | W: coppercorpinc.com

Figure 4. Jukes prospect 3D model section slice (looking oblique towards SSW) showing drill results with

historical mine adit channel sampling, 3D magnetic inversion model core (blue), and gradient array IP

chargeability image draped on topography.

About CopperCorp

CopperCorp is focused on the exploration and development of its Skyline, AMC, and Whisky Creek copper-

gold-REE projects in western Tasmania. The company is well -financed with approximately C$ 2.2M in

working capital.

Qualified Person & National Instrument 43-101 Disclosure

The Company’s disclosure of technical or scientific information in this news release has been reviewed

and approved by Sean Westbrook, VP Exploration for the Company. Mr. Westbrook is a Qualified Person

(QP) as defined in National Instrument 43-101.

Information on historical and recent prospecting, mining, and exploration activities at the Skyline Project

group of properties contained within this news release has been reviewed and verified by the Qualified

550-800 West Pender St. Vancouver, BC V6C 2V6 | E: [email protected] | W: coppercorpinc.com

Person. In the opinion of the Qualified Person, sufficient verification of historical and new data has been

undertaken to provide sufficient confidence that past exploration programs were performed to adequate

industry standards and the data reported is fit for substantiating the prospectivity of the project in

general, supporting the geological m odel/s proposed, planning exploration programs, and identifying

targets for further investigation.

This news release contains information about adjacent properties on which the Company does not have

an interest. The QP has been unable to verify the information on these adjacent properties and the

information is not necessarily indicative to the mineralization on the properties that is the subject of this

news release.

References

1CPER: TSXV News Release 19th December 2024

2CPER: TSXV News Release 15th October 2024

3CPER: TSXV News Release 13th May 2024

Adjacent Property (Mt Lyell) Information Sources:

Sibanye-Stillwater company website information as of May 12th 2024

New Century Resources: ASX Announcement 23rd January 2023

New Century Resources: ASX Announcement 27th October 2021

Seymour, D.B., Green, G.R., and Calver, C.R. 2007. The Geology and Mineral Resource of Tasmania: a

summary. Geological Survey Bulletin 72. Mineral Resources Tasmania, Department of Infrastructure,

Energy and Resources Tasmania

Contact:

Stephen Swatton

President, CEO & Director

[email protected]

Additional information about CopperCorp can be found on its website: www.coppercorpinc.com and at

www.sedar.com.

CAUTIONARY STATEMENT REGARDING FORWARD- LOOKING INFORMATION: This news release includes certain

“forward-looking statements” under applicable Canadian securities legislation relating the Company’s expectations and

plans regarding the Skyline Project, Razorback property and Jukes prospect in Tasmania; plans for future exploration

and drilling at the Jukes prospect and the timing of same; the merits of the Company’s mineral projects and other plans

of the Company. Forward-looking statements are statements that are not historical facts; they are generally, but not

always, identified by the words “encouraging”, "expects”, "plans”, "anticipat es”, "believes”, “interpret”, "intends",

"estimates", "projects", "aims", “s uggests”, “often”, “target”, “future”, “likely”, “pending”, "potential", "goal",

"objective", "prospective", “possibly”, “preliminary” and similar expressions, or that events or conditions "will", "would",

"may", "can", "could" or "should" occur, or other statements, which, by their nature, refer to future events. The Company

cautions that forward- looking statements are based on the beliefs, estimates and opinions of the Company's

management on the date the statements are made, and that such statements are subject to risks and uncertainties that

may cause actual results, performance or developments to differ materially from those contained in the statements.

Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future

events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue

reliance on forward-looking statements.

Factors that could cause future results to differ materially from those anticipated in forward-looking statements include

risks associated the timing and outcome of the approval process for final granting of the EL11/2024 application; that

550-800 West Pender St. Vancouver, BC V6C 2V6 | E: [email protected] | W: coppercorpinc.com

the Company may experience difficulties in exploration and drilling and carrying out related work ; the timing and

content of upcoming work programs; geological interpretations based on drilling that may change with more detailed

information; possible accidents; the possibility that the Company may not be able to secure permitting and other

governmental approvals necessary to carry out the Company's plans; the risk that the Company will not be able to raise

sufficient funds to carry out its business plans; the possibility that future exploration results will not be consistent with

the Company’s expectations; increases in costs; environmental compliance and changes in environmental and other

local legislation and regulation; interest rate other risks associated with mineral exploration operations, the risk that the

Company will encounter unanticipated geological factors and exchange rate fluctuations; changes in economic and

political conditions; and other risks involved in the mineral exploration industry. The reader is urged to refer to the

Company's Management’s Discussion and Analysis, publicly available through the Canadian Securities Administrators'

System for Electronic Document Analysis and Retrieval (SEDAR+) at www.sedarplus.ca for a more complete discussion

of risk factors and their potential effects.

Forward-looking statements are based on a number of assumptions, including management’s assumptions about the

following: the availability of financing for the Company’s exploration activities; operating and exploration costs; the

Company’s ability to attract and retain skilled staff; timing of the receipt of necessary regulatory and governmental

approvals; market competition; and general business and economic conditions. The Company disclaims any intention or

obligation to update or revise any forward-looking statements, whether as a result of new information, future events or

otherwise, except as required by law.

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.