Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

COSA.V ·

Cosa Resources Announces Airborne Geophysical Surveys at Ursa, Orion Uranium Projects in Athabasca Basin, Saskatchewan

Exploration Programs

Cosa Resources Announces Airborne Geophysical Surveys at Ursa,

Orion Uranium Projects in Athabasca Basin, Saskatchewan

Vancouver, British Columbia , May 11, 2023 – Cosa Resources Corp. (CSE: COSA) (“ Cosa Resources ” or the

“Company”) is pleased to announce it has engaged Expert Geophysics Limited (“Expert”) to co nduct airborne

MobileMT™ surveys at its 100% owned Ursa and Orion uranium projects in the Athabasca Basin.

Highlights

 Magnetotelluric (MT) survey method capable of detecting basement electromagnetic (EM) conductors and

anomalous resistivity zones in the sandstone

 Planned surveying totals 2,900 line-kilometres to provide property-wide coverage at Ursa and Orion

 Modern geophysical dataset will facilitate identification and prioritization of target areas for follow-up

Keith Bodnarchuk, President & CEO, commented: “Cosa’s first pass work at the Ursa and Orion projects demonstrates

our commitment to efficiently and effectively exploring these projects for the next major uranium deposit. We are

eager to see the results of this survey and work towards drill testing.”

Andy Carmichael, VP of Exploration commented: “ Ursa and Orion contain nearly 75 kilometres of combined strike

length of highly underexplored magnetic lows hosting EM conductors. With such a large area to explore, MobileMT

results will evaluate prospective corridors in their entirety to identify and prioritize key areas for follow-up.”

Planned Survey

Approximately 2,900 line-kilometres of MobileMT surveying is planned at Ursa and Orion in summer 2023, with 90%

of the work to be completed at Ursa. MobileMT is a modern, helicopter-borne, magnetotelluric (MT) survey system

capable of detecting both the basement-hosted EM conductors and sandstone-hosted zones of anomalous resistivity

commonly associated with significant Athabasca Basin uranium deposits. MobileMT is capable of resolving resistivity

contrasts to depths exceeding 1000 metres, and MT surveys have mapped basement conductors and sandstone

alteration zones at both the McArthur River and Shea Creek uranium deposits.

The planned survey is a time - and cost-effective approach to gaining a high-level assessment of the nearly 75

kilometres of underexplored, prospective strike length covered by the properties, and will accelerate exploration

through the prioritization of target areas. Surveying is planned to begin in late June and will take approximately three

weeks to complete.

Ursa Property

Existing geophysical coverage at Ursa comprises a patchwork of historical airborne and ground surveys, most of

which were completed between 1978 and 2008. Historical airborne EM surveys generally confirmed that basement-

hosted EM conductors are present but lacked the resolution for meaningful interpretation. Historical ground EM

surveys also in dicate basement EM conductors are present, but follow -up drilling rarely intersected conductive

basement units. Despite ineffective targeting, the sparse historical drilling intersected structurally disrupted

sandstone and basement, hydrothermal alteration, and weak mineralization. Most notably, drill holes CR-03 and CR-

08 intersected up to 0.05% and 0.18% U3O8 uranium in the basement, respectively, which has not been adequately

followed up (Figure 2).

The upcoming MobileMT survey will be the first time this portion of the Cable Bay Shear Zone (CBSZ) has been

covered by an airborne system capable of imaging the basement well beyond the unconformity. Cosa believes the

results will greatly improve the understanding of this regional-scale structural corridor.

The 65 kilometres of the CBSZ covered by Ursa offers a highly prospective, significantly underexplored geological

analogue to the geological settings underpinning major current- and past-producing uranium mines in the eastern

Athabasca Basin. The depth to the unconformity on the project is estimated to be between 600 and 1000 metres.

Orion Property

Located 15 kilometres northeast of Ursa, Orion cove rs eight kilometres of a curvilinear zone of low magnetic

susceptibility with historical electromagnetic conductors mantling a magnetic high , implying favorable structural

complexity. No historical drilling has been completed on the project, and the depth to the unconformity is estimated

to be between 750 and 900 metres based on neighboring drilling.

Expected Follow-up

Following receipt of the finalized MobileMT dataset, 3D inversion of the survey results will be completed by third

party specialists. Cosa aims to utilize inversion results to guide ground-based EM surveys over high- priority target

areas and generate quality targets for subsequent drill testing.

Figure 1 – Cosa’s Eastern Athabasca Portfolio with Prospective Uranium Corridors

Figure 2 – Survey Coverage at Ursa, Orion

About Cosa Resources

Cosa Resources is a Canadian mineral exploration company based in Vancouver, BC and is focused on the exploration

of its uranium and copper properties in northern Saskatchewan. The portfolio includes six uranium exploration

properties: Ursa, Or ion, Castor, Charcoal, Helios, and Astro, totaling 140,677 ha in the eastern and northern

Athabasca Basin.

The team behind Cosa Resources has a track record of success in Saskatchewan, with several decades of combined

experience in uranium exploration, discovery, and development in the province.

Qualified Person

The Company’s disclosure of technical or scientific information in this press release has been reviewed and approved

by Andy Carmichael, P.Geo., Vice President, Exploration for Cosa Resources. Mr. Carmichael is a Qualified Person

as defined under the terms of National Instrument 43 -101. This news release refers to neighboring properties in

which the Company has no interest. Mineralization on those neighboring properties does not necessarily indicate

mineralization on the Company’s properties.

Contact

Keith Bodnarchuk, President and CEO

[email protected]

+1 888-899-2672 (COSA)

Cautionary Statements

Neither the Canadian Securities Exchange nor the Market Regulator (as that term is defined in the policies of the

Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release includes certain “Forward -Looking Statements” within the meaning of applicable securities laws .

When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target”, “plan”, “forecast”,

“may”, “would”, “could”, “schedule” and similar words or expressions, identify forward- looking st atements or

information. These forward looking statements or information relate to, among other things: the exploration,

development, and production at the Company’s mineral projects.

Forward-looking statements and forward- looking information relating to any future mineral production, liquidity,

enhanced value and capital markets profile of the Company, future growth potential for the Company and its

business, and future exploration plans are based on management’s reasonable assumptions, estimates, expectations,

analyses and opinions, which are based on management’s experience and perception of trends, current conditions

and expected developments, and other factors that management believes are relevant and reasonable in the

circumstances, but which may prove to be incorrect. Assumptions have been made regarding, among other things,

the price of metals; no escalation in the severity of the COVID- 19 pandemic; costs of exploration and development;

the estimated costs of development of exploration projects; the Company’s ability to operate in a safe and effective

manner.

These statements reflect the Company’s respective current views with respect to future events and are necessarily

based upon a number of other assumptions and estimates that, while considered reasonable by management, are

inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies.

Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially

different from the results, performance or achievements that are or may be expressed or implied by such forward-

looking statements or forward -looking information and the Company has made assumptions and estimates based

on or related to many of these factors . Such factors include, without limitation: the Company's dependence on one

mineral project; precious metals price volatility; risks associated with the conduct of the Company's mining activities;

regulatory, consent or permitting delays; risks relating to reliance on the Company's management team and outside

contractors; the Company's inability to obtain insurance to cover all risks, on a commercially reasonable basis or at

all; currency fluctuations; risks regarding the failure to generate suffici ent cash flow from operations; risks relating

to project financing and equity issuances; risks and unknowns inherent in all mining projects; contests over title to

properties, particularly title to undeveloped properties; laws and regulations governing the environment, health and

safety; the ability of the communities in which the Company operates to manage and cope with the implications of

COVID-19; the economic and financial implications of COVID-19 to the Company; operating or technical difficulties in

connection with mining or development activities; employee relations, labour unrest or unavailability; the Company's

interactions with surrounding communities; the speculative nature of exploration and development; stock market

volatility; conflicts of interest among certain directors and officers; lack of liquidity for shareholders of the Company;

litigation risk; and the factors identified in the Company’s public disclosure documents . Readers are cautioned

against attributing undue certainty to forward- looking statements or forward- looking information. Although the

Company has attempted to identify important factors that could cause actual results to differ materially, there may

be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and

does not assume any obligation, to update these forward- looking statements or forward- looking information to

reflect changes in assumptions or changes in circumstances or any other events affecting such statements or

information, other than as required by applicable law.