Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

COR.V ·

Camino Intersects 1.31% Copper over 82.5 Meters at Adriana

Drill Results

Suite 500, 666 Burrard Street, Vancouver, BC V6C 3P6

Phone: 604-566-8778 | Fax: 604-558-4784 | Email: [email protected]

______________________________________________________________________________

NEWS RELEASE

#25-2017

October 2, 2017 TSX Venture Symbol: COR

CAMINO INTERSECTS 1.31% COPPER OVER 82.5 METERS AT ADRIANA

Camino Minerals Corporation (“Camino” or the “Company”) (COR: TSX -V) is pleased

to report results for eight diamond drill holes completed on the Adriana Zone at its Los

Chapitos Project (“Chapitos”), located in southern Peru.

Select drill highlights for the Adriana Zone include:

• DCH-024 intersected 1. 31% copper over 82.5 meters, including 2. 16% copper

over 31.7 meters;

• DCH-034 intersected 0.85% copper over 94.95 meters, including 2. 81% copper

over 6.2 meters and 3.16% copper over 6.15 meters.

Drill holes DCH-024 and DCH-034 were approximately 100 meter step out holes to the

southeast and northwest respectively from hole DCH -012, which i ntersected 0.93%

copper over 96.5 meters, including 2.03% copper over 19.5 meters and 5.01% copper

over 4.5 meters. The most recent drilling continues to add to our understanding of the

structural and lithological controls of the copper mineralization at Chapitos. The

current interpretation suggests the block of very high -grade mineralization formed at

the intersection of the feeder structure and a bed of brecciated volcaniclastic. This high-

grade mineralization remains open along strike in both directions.

Drilling elsewhere on the Adriana Zone continues to confirm the earlier results and

extends the mineralization . Holes DCH -028 and DCH -030 confirmed that the

mineralization below the discovery outcrop extends to depth and is dipping steeply to

the west . Holes DCH -026, DCH -029, and DCH -031, along with hole DCH -024 (all

drilled on the Section 205 from Pad-2A), have expanded the zone of bulk tonnage style

mineralization, within which is hosted zones of higher grade mineralization. The

drilling to date is beginning to outline a substantial body of copper mineralization that

2

currently measures over 400 meters by 150 meters which is open at depth and in both

directions along trend.

Work continues on the project with step out drilling underway at the Katty Zone and

additional drilling being planned for the Adriana Zone. The Company also expects to

receive authorization in October to initiate field activities at the Atajo Zone located on a

separate trend six kilometers to the southwest of the Adriana Zone. The Company

recently received approval of its environmental assessment and negotiated a

community access agreement as part of the permit application for drilling at the Atajo

Zone.

Kenneth C. McNaughton , M.A.Sc., P.Eng., is the Qualified Person (QP) responsib le for

the Chapitos project.

Updated drill section s and summary presentation can be found on the company

website at www.caminominerals.com.

Table 1: Selected Diamond Drill Results (1,2)

Hole

Number

Pad #

Dip/Azimuth

(degrees)

From

(meters)

To

(meters)

Interval

(meters)

Total

Copper

(%)

Acid

Soluble

Copper

(%)

Adriana Zone

DCH-024 Pad-2A 66.50 75.50 9.00 0.36 0.21

-63/205 111.50 137.00 25.50 0.91 0.34

Incl. 113.00 122.00 9.00 1.98 0.78

226.00 308.50 82.50 1.31 0.17

Incl. 263.50 295.20 31.70 2.19 0.11

DCH-026 Pad-2A 196.00 217.00 21.00 0.74 0.69

Incl. -57.5/205 203.50 211.00 7.50 1.15 1.08

248.00 266.50 18.50 0.44 0.19

DCH-028 Pad-2 94.50 134.00 39.50 0.22 0.08

-45/270 161.00 185.50 24.50 1.10 0.67

Incl. 167.50 171.80 4.30 2.54 1.29

DCH-029 Pad-2A 209.00 246.00 37.00 0.31 0.11

Incl. -52/205 231.50 236.20 4.70 0.72 0.23

DCH-030 Pad-2 104.50 127.00 22.50 0.64 0.50

-45/305 137.50 154.00 16.50 0.51 0.12

DCH-031 Pad-2A 61.90 71.00 9.10 0.20 0.09

-70/205 134.80 152.00 17.20 0.16 0.04

3

Hole

Number

Pad #

Dip/Azimuth

(degrees)

From

(meters)

To

(meters)

Interval

(meters)

Total

Copper

(%)

Acid

Soluble

Copper

(%)

Adriana Zone

351.90 356.50 4.60 0.37 0.01

DCH-032 Pad-1 55.00 84.20 29.20 0.21 0.13

-45/190 100.50 111.30 10.80 0.18 0.06

148.80 157.80 9.00 0.14 0.04

DCH-034 Pad-1 44.00 63.50 19.50 0.22 0.12

-60/190 63.50 158.45 94.95 0.85 0.43

Incl. 101.50 115.00 13.50 0.99 0.60

and 125.60 131.80 6.20 2.81 1.43

and 152.30 158.45 6.15 3.16 0.43

(1)True thickness to be determined.

(2)All samples were submitted for preparation and analysis by ALS Chemex at its facilities in Lima, Peru. All samples

were analyzed using multi-digestion with ICP finish and fire assay with AA finish for gold. Samples over 1%

copper were reanalyzed using four acid digestion with an ore grade ICP finish. Mineralized samples were

analyzed for acid soluble copper by being agitated at room temperature in a 5% sulphuric acid solution with the

copper content measured by AA. One in 20 samples was blank, one in 20 was a standard sample, and one in 20

samples had a sample cut from assay rejects assayed as a field duplicate at ALS Chemex in Lima, Peru.

About Camino Minerals Corporation

Camino is a discovery-oriented mineral exploration company . The Company is focused

on the acqu isition and develo pment of high -grade copper and precious metal projects.

For more information, please refer to Camino’s website at www.caminominerals.com.

For further information and investor inquiries, contact:

Ken McNaughton

President and Chief Executive Officer

Phone (604) 566-8778

[email protected]

http://www.caminominerals.com

Cautionary Note Regarding Forward-Looking Statements and Information

This News Release contains “forward -looking information” and “forward looking statements”

within the meaning of applicable Canadian and United States securities legislation. Statements

contained herein that are not based on historical or current fact, including without limitation

statements containing the words “anticipates,” “believes,” “may,” “continues,” “estimates,”

“expects,” and “will” and words of similar import, constitute “forward -looking statements”

within the meaning of the U.S. Private Securities Litigation Reform Act of 1995.

4

Forward-looking information may include, but is not limited to, information with respect to our

planned exploration activities, the adequacy of our financial resources, the estimation of

mineral reserves and resources, the results of future exploration and drilling. Wherever

possible, words such as “plans”, “expects”, “projects”, “assumes”, “budget”, “strategy”,

“scheduled”, “estimates”, “forecasts”, “anticipates”, “believes”, “intends”, “targets” and similar

expressions or statements that certain actions, events or results “may”, “could”, “would”,

“might” or “will” be taken, occur or be achieved, or the negative forms of any of these terms

and similar expressions, have been used to identify forward -looking statements and

information.

Forward-looking information is subject to a variety of known and unknown risks, uncertainties

and other factors that could cause actual events or results to differ from those expressed or

implied by the forward- looking inform ation, including, without limitation, those risks

identified in the Company’s annual disclosure materials, filed with the securities regulatory

authorities in Canada and available at www.sedar.com. Readers are encourag ed to read these

materials. P rospective investors should not place undue reliance on forward -looking

information.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.