Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

COR.V ·

Camino Commences Discovery Drilling at the Los Chapitos Copper Project, Peru

Exploration Programs

Camino Commences Discovery Drilling at the Los Chapitos Copper Project,

Peru

VANCOUVER, BC / ACCESSWIRE / September 7, 2021 / Camino Corp. (TSXV:COR)

(OTC PINK:CAMZF) (WKN:A116E1) ("Camino" or the "Company") is pleased to announce

that core drilling has commenced at the high-grade copper and gold Lidia Zone at its Los

Chapitos copper project near the coastal town of Chala in Arequipa Department, Peru ("Los

Chapitos"). On August 27, 2021, Camino received the necessary Start of Operations certificate

from the Ministry of Energy and Mines in addition to the drilling permit that was received at the

beginning of August. Camino is initially focusing its drilling towards new discoveries and is

targeting mineralization extensions at the Lidia Zone, 4 km north from previous drill intercepts

along a major controlling fault structure. The Lidia Zone is a vein system with rock chip samples

of artisanal workings channel samples returning grades up to 9.3 g/t gold (Au) and up to 5.1%

copper (Cu) (see news release dated August 10, 2021).

"We commenced our 2021 drilling campaign at Los Chapitos with a traditional Pachamama

mother earth ceremony. We recognize that the copper that we use for our technologically

intensive lifestyles comes from concentrated copper endowments in the earth's crust. Peru has a

particularly large endowment of copper mineralization as the second largest copper producer in

the world," said Jay Chmelauskas, CEO of Camino. "We are testing the geological endowment at

Los Chapitos by drilling at new locations that demonstrate the potential for large new

discoveries."

"Drilling has advanced to a depth of 76 metres and nearing the target mineralization zone," said

Chief Geologist, Jose Bassan. "We are starting to see trace chalcopyrite in a rock assemblage of

volcanic Andesitic Tuff with moderate alteration and the presence of epidote, chlorite, hematite,

magnetite and carbonates, plus evidence of magnetite replacement by specularite. We are within

the same metallogenic system previously drilled along the Diva Trend fault system that had

significant copper intercepts at Adriana (see news release dated August 10, 2021)."

Photo 01: Alteration assemblage Chlorite + Epidote + Hematite + Feldspar-K + Magnetite

(DCH0688-75 depth 71.00 m)

(weak +, moderate ++, strong +++ alteration)

Photo 02: Andesite porphyritic, pervasive alteration Chlorite +++ Epidote ++ Magnetite

+ Chalcopyrite (trace) DCH0688-75 depth 71.50 m

Photo 03: Lidia Zone Copper & Gold Drill Targets at Los Chapitos

Options

The Company has recently granted incentive stock options to various directors, officers,

employees, and consultants to purchase up to 5,500,000 common shares of the Company on or

before September 1, 2026, at an exercise price of $0.18 per share in accordance with its stock

option plan.

About Camino Minerals Corporation

Camino is a discovery and development stage copper exploration company. The Company is

focused on advancing its high-grade Los Chapitos copper project located in Peru towards

potential resource delineation and new discoveries. In addition, the company has commenced

field studies at its copper and silver Plata Dorada project. Camino has also recently acquired the

Maria Cecilia copper porphyry project. The Company seeks to acquire a portfolio of advanced

copper assets that have the potential to deliver copper into an electrifying copper intensive global

economy. For more information, please refer to Camino's website at www.caminocorp.com.

Jose Bassan MAusIMM (CP) 227922, MSc. Geologist, a Qualified Person as defined by NI 43-

101, has reviewed and approved the technical contents of this document. Mr. Bassan has

reviewed and verified relevant data supporting the technical disclosure, including sampling and

analytical test data.

ON BEHALF OF THE BOARD For further information, please contact:

/S/ "Jay Chmelauskas" Camino Investor Relations

President and CEO [email protected]

Tel: (604) 608-4513

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

Cautionary Note Regarding Forward Looking Statements: Certain disclosures in this release

constitute forward-looking information. In making the forward-looking disclosures in this

release, the Company has applied certain factors and assumptions that are based on the

Company's current beliefs as well as assumptions made by and information currently available

to the Company. Forward-looking information in the release includes the prospectivity of future

exploration work on the Los Chapitos projects the ability to complete the necessary permit

requirements for drilling, or that actual results of exploration and engineering activities are

consistent with management's expectations. Although the Company considers these assumptions

to be reasonable based on information currently available to it, they may prove to be incorrect,

and the forward-looking information in this release is subject to numerous risks, uncertainties

and other factors that may cause future results to differ materially from those expressed or

implied in such forward-looking information. Such risk factors include, among others, that

actual results of the Company's exploration activities will be different than those expected by

management, that the Company will be unable to obtain or will experience delays in obtaining

any required approvals and the state of equity and commodity markets. Readers are cautioned

not to place undue reliance on forward-looking statements. The Company does not intend, and

expressly disclaims any intention or obligation to, update or revise any forward-looking

statements whether as a result of new information, future events or otherwise, except as required

by law.

SOURCE: Camino Minerals Corp.