Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CONE.V ·

Canada One Identifies 2.5 X 2.5 Km Alteration Footprint ON the CM1 Copper Property, Princeton, British Columbia

Exploration Programs

#250 – 750 West Pender St.

Vancouver, British Columbia, V6C 2T7

CANADA ONE IDENTIFIES 2.5 X 2.5 KM ALTERATION FOOTPRINT ON THE CM1

COPPER PROPERTY, PRINCETON, BRITISH COLUMBIA

Vancouver, B.C., November 09, 2023 - Canada One Mining Corp. (“Canada One” or

the “Company”) (TSXV: CONE) (OTC: COMCF) (FSE: AU31) completed an orientation

field program on the CM1 Copper Property (“ CM1” or the “ Property”), a 1,054 Ha land

package that was recently added to Canada One’s Flagship Copper Dome Project (now

totaling over 5800 Ha). CM1 is contiguous with the Copper Dome Project, located

immediately south of Hudbay Mineral’s active Copper Mountain Mine near Princeton,

British Columbia.

Mr. Peter Berdusco, President and CEO of Canada One, commented: “Positive

indications for copper potential on CM1 include a large alteration footprint with intensely

quartz-sericite-pyrite altered intrusions which together represent a new and distinct

magmatic hydrothermal center adjacent to the Copper Mountain Mine. CM1 is highly

prospective for porphyry copper-gold mineralization and we look forward to executing a

systematic exploration program.”

CM1 Highlights

CM1 contains geological features consistent with the distal coppery porphyry setting and

has confirmed the potential for bulk copper-gold mineralization:

 Alteration footprint measuring at least 2.5 by 2.5 kilometers

 Favorable host rocks including Nicola Group mafic volcanic rocks

 Quartz-sericite-pyrite altered quartz-feldspar porphyry intrusions

 Property contains the Ox Copper Showing (disseminated chalcopyrite-magnetite)

 Located 4 km south of the Hudbay Mineral’s producing Copper Mountain Mine

(1,132 Mt @ 0.22% Cu; 0.09 g/t Au; 0.64 g/t Ag; Total Measured and Indicated1,2)

Figure 1. Location of the newly optioned CM1, the Copper Dome Project and Copper

Mountain

Field Evaluation of CM1

An orientation field evaluation campaign was conducted on CM1 to examine alteration

and mineralization associated with the Nicola Group volcanic rocks and younger

intrusions. A total of 26 mapping station outcrops were reviewed and together outline an

alteration footprint measuring at least 2.5 x 2.5 kilometers defined by chlorite-epidote-

carbonate +/- pyrite with internal zones of quartz-sericite-pyrite alteration and zones of

calc-silicate skarn development (Figures 2 and 3).

Economic Geology of CM1

CM1 is underlain by Triassic-Jurassic Nicola group basalt-andesite composition volcanic

rocks which are intruded by hornblende-feldspar porphyry dikes that are interpreted to

belong to the Early Jurassic Copper Mountain stock of the Copper Mountain Intrusions to

the north. Recent field work has identified a large alteration footprint consisting of chlorite-

epidote-carbonate-pyrite altered Nicola Group mafic fragmental volcanic rocks. Locally,

carbonate-rich sedimentary rocks internal to the Nicola Group are altered to calc-silicate

skarn (garnet-pyroxene-epidote) (Figure 3). The Property is cut by quartz feldspar

porphyry dykes (diorite) which are overprinted by intense (texturally destructive) quartz-

sericite-pyrite alteration and are limonitic in exposed outcrops.

The Nicola Group is considered highly prospective and is host to porphyry copper-gold

deposits and mines in southern British Columbia including:

1- Copper Mountain Mine (Hudbay Minerals 3) immediately north of CM1

2- MPD Exploration/Development project north of Princeton (Kodiak Copper 4)

3- New Afton active block cave mine near Kamloops (Newgold 5) *

Figure 2. Geology and mineral occurrences of the Copper Mountain Mine (Hudbay

Minerals) and adjoining Copper Dome Project area including CM1 (Canada One Mining).

Figure 3. Examples of intense quartz-sericite-pyrite (and limonite) alteration (3A-3C) and

quartz vein stockwork development in Nicola Group Volcanic rocks (3D) from CM1.

References

1 Klue, R., Redmond, P., Alberto, L.C., Simonian, B., Humala, A., Weston, S., 2022.

COPPER MOUNTAIN MINE LIFE-OF-MINE PLAN AND 65 KT/D EXPANSION STUDY

UPDATE NI 43-101 TECHNICAL REPORT BRITISH COLUMBIA, CANADA. Report

Date: September 30, 2022. Effective Date: August 1, 2022.

2 The Copper Mountain Mine Mineral Resource Estimate includes a measured

resource 597 Mt @ 0.23% Copper, 0.10 g/t Gold, 0.71 g/t Silver, an Indicated resource

of 535 Mt @ 0.20% Copper, 0.09 g/t Gold, 0.57 g/t Silver and an inferred resource of 446

Mt @ 0.19% Copper, 0.09 g/t Gold, 0.54 g/t Silver

3 https://hudbayminerals.com/canada/default.aspx

4 https://kodiakcoppercorp.com/projects/mpd/

5 https://newgold.com/assets/#new-afton-mine

* The Company cautions that mineral deposits may not be present on CM1.

Qualified Person

All scientific and technical information in this news release has been prepared by, or

approved by Daniel MacNeil, PGeo. Mr. MacNeil is a qualified person for the purposes of

National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Contact Us

For further information, interested parties are encouraged to visit the Company’s website

at www.canadaonemining.com, or contact the Company by email at [email protected],

or by phone at 1.877.844.4661.

On behalf of the Board of Directors of

CANADA ONE MINING CORP.

Peter Berdusco

President and Chief Executive Officer

Forward-Looking Statements

This press release includes certain “forward-looking information” and “forward-looking statements” (collectively “forward-looking

statements”) within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact,

included herein, without limitation, statements relating to the future operating or financial performance of the Company, are forward

looking statements. Forward-looking statements are frequently, but not always, identified by words such as “expects”, “anticipates”,

“believes”, “intends”, “estimates”, “potential”, “possible”, and similar expressions, or statements that events, conditions, or results “will”,

“may”, “could”, or “should” occur or be achieved. Forward-looking statements in this press release relate to, among other things:

statements relating to the completion of the transaction and receipt of any required regulatory approvals. Actual future results may

differ materially. There can be no assurance that such statements will prove to be accurate, and actual results and future events could

differ materially from those anticipated in such statements. Forward looking statements reflect the beliefs, opinions and projections on

the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by

the respective parties, are inherently subject to significant business, technical, economic, and competitive uncertainties and

contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially

different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements

and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without

limitation: the timing, completion and delivery of the referenced assessments and analysis. Readers should not place undue reliance

on the forward-looking statements and information contained in this news release concerning these times. Except as required by law,

the Company does not assume any obligation to update the forward-looking statements of beliefs, opinions, projections, or other

factors, should they change, except as required by law.

TSX Venture Exchange Disclaimer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.