Collective Mining Drills 486 Metres at 2.01 g/t AuEq at Apollo and Announces Plans to Drill up to 100,000 Metres in 2026 The Company has received assay results from thirteen diamond drill holes which targeted various gaps in the internal block model within the top 1,000 vertical metres of
Collective Mining Drills 486 Metres at 2.01 g/t
AuEq at Apollo and Announces Plans to Drill
up to 100,000 Metres in 2026
The Company has received assay results from thirteen diamond drill holes which
targeted various gaps in the internal block model within the top 1,000 vertical metres of
the
Apollo
system. Additionally, drilling has expanded the western side of the
Apollo
system by up to 50 metres by intersecting high-grade mineralization. Highlights of this
drilling are presented below:
486.00 metres @ 2.01 g/t gold equivalent from 54.10 metres downhole (APC-141)
144.30 metres @ 2.08 g/t gold equivalent from 324.45 metres downhole (APC105-D5).
This hole expanded the
Apollo
system to the west by up to 50 metres at an elevation
of 1,450 MASL.
Diamond drilling continues to intersect potentially interesting mineralization with two
rigs testing the Ramp Zone (located at the bottom of the
Apollo
system) and four rigs
testing the Pound target (located in the northern end of the
San Antonio
project).
The Company is finalizing plans for an 80,000 to 100,000 metre drilling campaign in 2026
across the Guayabales and
San Antonio
projects. Additionally, the Company anticipates
that it will complete a maiden resource estimate for the
Apollo
system in Q4, 2026.
TORONTO
,
Oct. 29, 2025
/CNW/ -
Collective Mining Ltd.
(NYSE: CNL) (TSX: CNL)
("Collective"
or the "Company")
is pleased to announce assays results for thirteen diamond drill holes designed
to cover various gaps existing in the internal block model from surface down to 1,000 metres below
surface at the
Apollo
system ("Apollo"). Apollo is strongly mineralized from surface to over 1,300
vertical metres, is open at depth, and is the most advanced discovery made to date within the
Company's multi-target, Guayabales Project in Caldas,
Colombia
.
Approximately 142,000 metres of diamond drilling has been completed to date at the Guayabales
and
San Antonio
projects, including 102,000 metres at
Apollo
. Numerous holes across both projects
are awaiting assay results.
Six rigs are operating at the Guayabales Project. One rig is being mobilized to conduct expansion
drilling at the outcropping zone of high-grade tungsten, gold, silver and copper; two rigs are
conducting infill drilling of the
Apollo
system at elevations ranging between 1,500MASL to
1,000MASL; two deep capacity rigs are focused on expanding both the strike and vertical
dimensions of the high-grade Ramp Zone at depth (below
Apollo
) and the final rig has commenced
drilling at Target X to follow up on the recently discovered high-grade and silver-rich vein system
announced on
September 3, 2025
.
Four rigs are also operating at the San Antonio Project and are specifically focused on the Pound
target where previously released drilling has intersected a shallower zone of gold and silver rich,
intermediate sulphidation sheeted veins and a deeper gold-copper porphyry mineralized system. Of
interest, currently advancing drill holes SAC-25 and SAC-26, which are being drilled from different
pads located approximately 500 metres apart, are cutting multiple zones of sheeted vein
mineralization hosting high levels of fine-grained sulphides which have been a reliable indicator in
prior holes for precious metal-rich mineralization.
Ari Sussman
, Executive Chairman commented: "Drilling at
Apollo
continues to add value as the
system expands in dimension and improves in grade. As an explorationist at heart, I am most keen
to see what comes next from drilling into the Ramp Zone below
Apollo
as it is our firm belief that the
Ramp Zone is the engine for the entire
Apollo
system. With ten rigs currently turning and up to
100,000 metres of drilling being planned for 2026, I am overtly confident that a lot of additional value
will be unlocked prior to announcing a maiden mineral resource estimate for
Apollo
by the end of
next year."
Details (see Table1 and Figures 1-4)
Assay results for thirteen drill holes targeting various gaps in the Company's internal block
model within the top 1,000 metres of the
Apollo
system have been received. These intercepts
have either improved the block model grades, extended the mineralized volume or upgraded
confidence in the estimation.
Drill holes collared from Pad 30 cut mineralization beginning at or near surface as follows:
APC-141 drilled to the northwest:
486.00 metres @ 2.01 g/t gold equivalent from 54.10 metres
downhole including:
16.25 metres @ 3.06 g/t gold equivalent from 309.55 metres downhole and
25.00 metres @ 4.18 g/t gold equivalent from 345.70 metres downhole and
36.60 metres @ 3.03 g/t gold equivalent from 387.70 metres downhole and
29.75 metres @ 3.01 g/t gold equivalent from 441.00 metres downhole and
32.90 metres @ 4.38 g/t gold equivalent from 502.90 metres downhole
APC-146 drilled to the southwest:
20.40 metres @ 1.14 g/t gold equivalent from 10.50 metres downhole
APC-147 drilled to the northwest:
84.55 metres @ 2.04 g/t gold equivalent from surface
including:
29.15 metres @ 3.22 g/t gold equivalent from 7.55 metres downhole
Drill holes collared from mother hole APC-103D at Pad 16, infilled numerous gaps within the
internal block model as follows:
APC103-D4 drilled to the southeast:
12.75 metres @ 2.04 g/t gold equivalent from 48.55 metres downhole and
10.10 metres @ 2.58 g/t gold equivalent from 99.0 metres downhole and
35.90 metres @ 2.20 g/t gold equivalent from 225.10 metres downhole
APC103-D5 drilled to the southwest:
13.70 metres @ 2.26 g/t gold equivalent from 15.00 metres downhole and
34.35 metres @ 1.72 g/t gold equivalent from 110.50 metres downhole and
22.60 metres @ 3.87 g/t gold and 4 g/t silver from 287.30 metres downhole and
13.15 metres @ 3.35 g/t gold and 4 g/t silver from 335.30 metres downhole
Drill holes collared from mother hole APC-105D at Pad 18 have extended the volume of the
mineralized Apollo breccia body towards the southwest margin by up to 50 metres
horizontally and 140 metres vertically.
APC105-D2 drilled to the northeast:
287.80 metres @ 1.42 g/t gold equivalent from 109.55 metres downhole
including:
29.55 metres @ 3.34 g/t gold equivalent from 109.55 metres downhole
17.30 metres @ 3.00 g/t gold equivalent from 272.40 metres downhole
25.80 metres @ 3.09 g/t gold equivalent from 325.50 metres downhole
APC105-D3 drilled to the northwest:
50.30 metres @ 1.18 g/t gold equivalent from 326.20 metres downhole including:
10.80 metres @ 3.04 g/t gold equivalent from 365.70 metres downhole
APC105-D4 drilled to the northeast:
205.80
metres @ 1.63 g/t gold equivalent from 330.65 metres downhole
including:
34.40 metres @ 2.16 g/t gold equivalent from 330.65 metres downhole
21.45 metres @ 5.61 g/t gold equivalent from 488.65 metres downhole
APC105-D5 drilled to the northeast:
144.30
metres @ 2.08 g/t gold equivalent from 324.45 metres downhole
including:
48.55 metres @ 4.66 g/t gold equivalent from 371.40 metres downhole and
20.75 metres @ 2.24 g/t gold equivalent from 570.55 metres downhole
APC105-D6 drilled to the northeast:
126.75 metres @ 1.33 g/t gold equivalent from 260.40 metres downhole including:
27.60 metres @ 3.00 g/t gold equivalent from 359.55 metres downhole and
20.00 metres @ 1.57 g/t gold equivalent from 503.30 metres downhole
APC105-D7 drilled to the northeast:
170.60 metres @ 1.54 g/t gold equivalent from 140.65 metres downhole including:
10.55 metres @ 3.85 g/t gold equivalent from 140.65 metres downhole and
35.35 metres @ 3.13 g/t gold equivalent from 275.90 metres downhole
APC105-D8 drilled to the northeast:
63.20 metres @ 1.24 g/t gold equivalent from 228.30 metres downhole including:
8.80 metres @ 3.02 g/t gold equivalent from 228.30 metres downhole and
17.20 metres @ 1.48 g/t gold equivalent from 387.95 metres downhole
43.15 metres @ 1.71 g/t gold equivalent from 471.85 metres downhole
APC105-D9 drilled to the northeast:
19.55 metres @ 2.25 g/t gold equivalent from 312.55 metres downhole
Table 1: Assays Results for Drill Holes Announced in This Release
Hole #
From
(m)
To
(m)
Length
(m)
Au
g/t
Ag
g/t
Cu
%
Zn
%
AuEq
g/t*
APC103-D4
48.55
61.30
12.75
1.94
8
0.02
0.09
2.04
and
99.00
109.10
10.10
2.58
4
0.02
-
2.58
and
225.10
261.00
35.90
2.12
7
0.03
0.04
2.20
APC103-D5
15.00
28.70
13.70
2.23
5
0.02
-
2.26
and
110.50
144.85
34.35
1.66
5
0.02
0.05
1.72
and
287.30
309.90
22.60
3.87
4
0.02
0.03
3.84
and
335.30
348.45
13.15
3.35
4
0.02
-
3.33
APC105-D2
109.55
397.35
287.80
1.33
5
0.02
0.09
1.42
Incl.
109.55
139.10
29.55
3.20
10
0.03
0.20
3.34
& Incl.
272.40
289.70
17.30
2.94
6
0.02
0.13
3.00
& Incl.
325.50
351.30
25.80
3.00
7
0.03
0.18
3.09
APC105-D3
326.20
376.50
50.30
1.12
4
0.01
0.07
1.18
Incl.
365.70
376.50
10.80
3.00
7
0.02
0.05
3.04
APC105-D4
330.65
536.45
205.80
1.40
13
0.04
0.12
1.63
Incl.
330.65
365.05
34.40
2.01
9
0.02
0.19
2.16
& Incl.
488.65
510.10
21.45
5.03
37
0.10
0.38
5.61
APC105-D5
324.45
468.75
144.30
1.86
13
0.04
0.15
2.08
Incl.
371.40
419.95
48.55
4.38
21
0.04
0.28
4.66
and
570.55
591.30
20.75
2.15
7
0.02
0.10
2.24
APC105-D6
260.40
387.15
126.75
1.17
10
0.02
0.13
1.33
Incl.
359.55
387.15
27.60
2.62
23
0.04
0.33
3.00
and
503.30
523.30
20.00
1.40
11
0.04
0.05
1.57
APC105-D7
140.65
311.25
170.60
1.39
9
0.03
0.10
1.54
Incl.
140.65
151.20
10.55
3.86
4
0.04
-
3.85
& Incl.
275.90
311.25
35.35
2.92
15
0.04
0.14
3.13
APC105-D8
228.30
291.50
63.20
0.93
17
0.06
0.11
1.24
Incl.
228.30
237.10
8.80
2.62
25
0.11
0.05
3.02
and
387.95
405.15
17.20
1.11
19
0.03
0.33
1.48
and
471.85
515.00
43.15
1.47
11
0.03
0.29
1.71
APC105-D9
312.55
332.10
19.55
2.04
14
0.02
0.20
2.25
APC-141
54.10
540.10
486.00
1.15
39
0.26
0.12
2.01
Incl.
309.55
325.80
16.25
1.22
100
0.43
0.05
3.06
& Incl.
345.70
370.70
25.00
3.80
22
0.04
0.44
4.18
& Incl.
387.70
424.30
36.60
2.57
28
0.05
0.35
3.03
& Incl.
441.00
470.75
29.75
2.81
15
0.04
0.13
3.01
& Incl.
502.90
535.80
32.90
3.90
29
0.07
0.41
4.38
APC-146
10.50
30.90
20.40
0.33
48
0.09
-
1.14**
APC-147
0.00
84.55
84.55
0.82
39
0.32
-
2.06**
Incl.
7.55
36.70
29.15
1.94
48
0.23
-
3.58**
*AuEq (g/t) is calculated as follows: (Au (g/t) x 0.97) + (Ag (g/t) x 0.015 x 0.85) + (Cu (%) x 1.44 x 0.95) + (Zn (%) x 0.39 x 0.85) utilizing metal prices of Au – US$2,200/oz, Ag –
US$33/oz, Cu – US$4.62/lb and Zn – US$1.25/lb and recovery rates of 97% for Au, 85% for Ag, 95% for Cu and 85% for Zn. Recovery rate assumptions for metals are based on
metallurgical results announced on October 17, 2023, April 11, 2024, and October 3, 2024. The recovery rate assumption for zinc is speculative as limited metallurgical work
has been completed to date. True widths are between 60%-100% of the total length and grades are uncut.
**For drillholes APC-146 and APC-147, the AuEq (g/t) calculation included WO
3
with average WO
3
for the reported intervals ranging from 0.02% to 0.22% utilizing metal prices of
WO
3
– US$15.51/lb and recovery rate of 72% for WO
3
.
Figure 1: Plan View of the Apollo System Highlighting Infill Drill Holes in this Release (CNW
Group/Collective Mining Ltd.)
Figure 2: Plan View and Section Highlighting the New Western Expansion of the Apollo System
(CNW Group/Collective Mining Ltd.)
Figure 3:
Plan View of the San Antonio Project’s Pound Target with Visual Descriptions of Drill Holes
SAC-24, SAC-25, and SAC-26, all of Which Cut Potentially Significant Mineralization. Assay Results
are Pending (CNW Group/Collective Mining Ltd.)
Figure 4: Plan View of the San Antonio and Guayabales Projects Highlighting the Pound Target and
the Apollo System (CNW Group/Collective Mining Ltd.)
About Collective Mining Ltd.
To see our latest corporate presentation and related information, please visit
www.collectivemining.com
.
Founded by the team that developed and sold Continental Gold Inc. to Zijin Mining for approximately
$2 billion
in enterprise value, Collective is a gold, silver, copper and tungsten exploration company
with projects in Caldas,
Colombia
. The Company has options to acquire 100% interest in two
projects located directly within an established mining camp with ten fully permitted and operating
mines.
The Company's flagship project, Guayabales, is anchored by the
Apollo
system, which hosts the
large-scale, bulk-tonnage and high-grade gold-silver-copper-tungsten
Apollo
system. The Company's
objectives at the Guayabales Project are to expand the newly discovered high-grade Ramp Zone
along strike and to depth and drill a series of greenfield generated targets on the property.
Additionally, the Company has launched its largest drilling campaign in history at the San Antonio
Project as it hunts for new discoveries and looks to expand upon the newly discovered porphyry
system at the Pound target. The San Antonio Project is located between two to five kilometers east-
northeast of the Guayabales Project and could potentially share infrastructure given their proximity to
each other.
Management, insiders, a strategic investor and close family and friends own 45.3% of the
outstanding shares of the Company and as a result, are fully aligned with shareholders. The
Company is listed on both the NYSE American and TSX under the trading symbol "CNL".
Qualified Person (QP) and NI43-101 Disclosure
David J Reading is the designated Qualified Person for this news release within the meaning of
National Instrument 43-101 ("NI 43-101") and has reviewed and verified that the technical information
contained herein is accurate and approves of the written disclosure of same. Mr. Reading has an
MSc in Economic Geology and is a Fellow of the Institute of Materials, Minerals and Mining and of
the Society of Economic Geology (SEG).
Technical Information
Samples were cut by Company personnel at Collective Mining's core facility in Caldas,
Colombia
.
Diamond drill core was sawed and then sampled in maximum 2 metres intervals, stopping at
geological boundaries. Drill hole core diameter is a mix of PQ, HQ and NQ depending on the depth
of the drill hole.
Core samples have been prepared and analyzed at ALS laboratory facilities in
Medellin, Colombia
and
Lima, Peru
. Blanks, duplicates, and certified reference standards are inserted into the sample
stream to monitor laboratory performance. Crush rejects and pulps are kept and stored in a secured
storage facility for future assay verification. No capping has been applied to sample composites. The
Company utilizes a rigorous, industry-standard QA/QC program.
Information Contact:
Follow Executive Chairman
Ari Sussman
(@Ariski73
)
on X
Follow Collective Mining (
@CollectiveMini1
) on X,
(Collective Mining)
on LinkedIn, and
(@collectivemining)
on Instagram
FORWARD-LOOKING STATEMENTS
This news release contains "forward-looking statements" and "forward-looking information" within the
meaning of applicable securities legislation (collectively, "forward-looking statements"). All
statements, other than statements of historical fact, are forward-looking statements and are based
on expectations, estimates and projections as at the date of this news release. Any statement that
involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives,
assumptions, future events or performance (often, but not always using phrases such as "plans",
"expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or
"believes" or variations (including negative variations) of such words and phrases, or state that
certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be
achieved) are not statements of historical fact and may be forward-looking statements. In this news
release, forward-looking statements relate, among other things, to the anticipated advancement of
mineral properties or programs; future operations; future recovery metal recovery rates; future
growth potential of Collective; and future development plans.
These forward-looking statements, and any assumptions upon which they are based, are made in
good faith and reflect our current judgment regarding future events including the direction of our
business. Management believes that these assumptions are reasonable. Forward-looking
statements involve known and unknown risks, uncertainties and other factors which may cause the
actual results, performance or achievements of the Company to be materially different from any
future results, performance or achievements expressed or implied by the forward-looking
statements. Such factors include, among others: risks related to the speculative nature of the
Company's business; the Company's formative stage of development; the Company's financial
position; possible variations in mineralization, grade or recovery rates; actual results of current
exploration activities; conclusions of future economic evaluations; fluctuations in general
macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices
of gold, precious and base metals or certain other commodities; fluctuations in currency markets;
change in national and local government, legislation, taxation, controls regulations and political or
economic developments; risks and hazards associated with the business of mineral exploration,
development and mining (including environmental hazards, industrial accidents, unusual or
unexpected formation pressures, cave-ins and flooding); inability to obtain adequate insurance to
cover risks and hazards; the presence of laws and regulations that may impose restrictions on
mining; employee relations; relationships with and claims by local communities and indigenous
populations; availability of increasing costs associated with mining inputs and labour; the speculative
nature of mineral exploration and development (including the risks of obtaining necessary licenses,
permits and approvals from government authorities); and title to properties, as well as those risk
factors discussed or referred to in the annual information form of the Company dated
March 24,
2025
. Forward-looking statements contained herein are made as of the date of this news release
and the Company disclaims any obligation to update any forward-looking statements, whether as a
result of new information, future events or results, except as may be required by applicable
securities laws. There can be no assurance that forward-looking statements will prove to be
accurate, as actual results and future events could differ materially from those anticipated in such
statements and there may be other factors that cause results not to be anticipated, estimated or
intended. Accordingly, readers should not place undue reliance on forward-looking statements.
SOURCE
Collective Mining Ltd.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/October2025/29/c5137.html
%SEDAR: 00045946E
For further information:
Investors and Media: Paul Begin, Chief Financial Officer,
[email protected], +1 (416) 451-2727
CO: Collective Mining Ltd.
CNW 06:30e 29-OCT-25