Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CNC.V ·

Canada Nickel Confirms Discovery at Mann Northwest Property

Exploration Programs

1

Canada Nickel Confirms Discovery at Mann Northwest Property

Highlights

• First eight holes drilled at Mann Northwest intersected multi-hundred metre intervals of

mineralized peridotite and minor dunite across combined strike length of 2.7 kilometres

• Target remains open in all directions

• Mann Northwest target geophysical footprint of 6.0 km2 is more than triple the size of

Crawford project footprint

• Hole MAN23-02 returned 0.26% Ni over core length of 210 metres including 0.31% nickel over

33 metres. Hole ended with 0.52 g/t Pt+Pd over 29 metres

TORONTO, August 22, 2023 – Canada Nickel Company Inc. (" Canada Nickel" or the "Company") (TSXV:

CNC) (OTCQX: CNIKF) today released drilling results from a further three holes and assay results from the

first five of eight holes drilled on its Mann Northwest Property located in the prolific Timmins Nickel District

in Ontario.

Mark Selby, CEO of Canada Nickel commented, “Our regional exploration program continues to deliver with

today’s confirmation of another discovery at Mann Northwest, part of Canada Nickel’s Timmins Nickel

District. Mann Northwest has a target footprint more than three times that of Crawford and is one of eleven

properties with a target footprint larger than Crawford. T hree additional holes extended the strike length

of mineralization by more than 1,100 metres to 2,650 metres, and assays from first five holes confirm ed

grades in line with expectations.”

Mann Northwest Property

The Mann property is located 22 k ilometres east of Crawford, 20 kilometres south of Cochrane, and 45

kilometres northeast of Timmins. Canada Nickel has an ability to earn an 80% interest in the property owned

by Noble Minerals (see press release November 22, 2021). Drilling began at Mann Northwest, which has a

target footprint of 6.0 km2, - compared to Crawford target footprint of 1.6 km2 (see Figure 1).

Drilling started in the Northwest zone, with a total of eight holes drilled, all of them intersecting mineralized

sections of predominantly well serpentinized peridotite and minor dunite. T his release discloses assay

results from the first five drillholes, assays for the other three drillholes are pending (Table 1)

The first five holes delineated mineralization along 1,150 metres of strike length and a width of at least 500

metres. The additional three holes, extended the potential strike length to 2,650 metres. The target remains

open in all directions.

2

MAN23-01 drilled to the southwest and intersected peridotite from top to bottom only interrupted by 23.5

metres of pyroxenite with 0.44 g/t Pt+Pd. Initial samples were taken for mineralogical testing (QEMSCAN),

confirming samples are very well serpentinized with varying amounts of Heazlewoodite and Pentlandite.

MAN23-02 intersected 348.5 metres at 0.23% Ni in peridotite and finished in 28.9 metres of 0.52g/t Pt+Pd

in pyroxenite.

MAN23-03 drilled to the northeast and intersected mineralized peridotite at the top and dunite at the

bottom, with an average grade of 0.23% Ni over 291.5 metres. The hole ended in dunite at 402 metres only

interrupted by diabase dykes near the bottom.

MAN23-04 drilled near the southern end of the target and intersected 301.5 metres of peridotite with 0.18%

Ni, followed by 16 metres of 0.41 metres of Pt+Pd in pyroxenite.

MAN23-05 drilled to the southwest and intersected a sequence of peridotite with minor dunite and

pyroxenite. The hole assayed 366.5 metres of 0.20 Ni, including 11.0 metres of 0.44 g/t Pt+Pd. Hole ended

in mineralized peridotite.

MAN23-13 drilled to the southwest approximately 750 metres northwest of MAN23-05. The hole

intersected 404.5 metres of interlayered dunite, peridotite and pyroxenite with predominantly moderate

to strong serpentinization.

MAN23-14 drilled to the northeast collaring and terminating in mineralized dunite with intervals of

peridotite. The hole is moderate to well mineralized and moderate to well serpentinized across core

length of 390.0 metres.

MAN23-15 drilled to the northeast testing a fold hinge of a major structure, it intersected 415 metres of a

sequence of dunite, peridotite, pyroxenite and gabbro. The hole has sections of very well mineralized and

well serpentinized ultramafic.

Table 1: Mann drilling downhole composite

Hole ID From To Length Ni Co Pt+Pd Pd Pt Cr Fe S

(m) (m) (m) (%) (%) (g/t) (g/t) (g/t) (%) (%) (%)

MAN23-01 19.8 432.0 412.2 0.19 0.01 0.047 0.028 0.019 0.37 6.99 0.03

including 310.6 334.1 23.5 0.04 0.01 0.445 0.245 0.200 0.42 4.97 0.01

and 351.0 432.0 81.0 0.24 0.01 0.007 0.003 0.004 0.32 7.11 0.01

MAN23-02 24.6 373.1 348.5 0.23 0.01 0.04 0.025 0.015 0.37 6.76 0.07

Including 35.8 246.0 210.2 0.26 0.01 0.041 0.026 0.015 0.38 6.34 0.07

Including 208.5 241.5 33.0 0.31 0.01 0.057 0.038 0.019 0.45 6.21 0.09

and 373.1 402.0 28.9 0.03 0.01 0.523 0.294 0.229 0.36 5.79 0.02

MAN23-03 36.0 327.5 291.5 0.23 0.01 0.011 0.005 0.006 0.23 5.93 0.07

and 379.0 402.0 23.0 0.22 0.01 0.009 0.003 0.006 0.15 6.17 0.16

MAN23-04 18.0 319.5 301.5 0.18 0.01 0.02 0.009 0.011 0.33 7.26 0.05

and 319.5 335.5 16.0 0.01 0.01 0.414 0.238 0.176 0.33 5.75 0.01

MAN23-05 35.5 402.0 366.5 0.20 0.01 0.032 0.019 0.013 0.44 6.75 0.06

including 235.0 246.0 11.0 0.04 0.01 0.444 0.272 0.172 0.38 4.24 0.03

3

Figure 1. Plan View of Mann Northwest with completed drilling.

Table 2: Drillhole Orientation

Hole ID Zone Easting (mE) Northing (mN) Azimuth (⁰) Dip (⁰) Length (m)

MAN23-01 NW 495641 5412486 235 -50 432

MAN23-02 NW 495967 5412226 235 -50 402

MAN23-03 NW 495967 5412226 35 -50 402

MAN23-04 NW 496257 5411972 235 -50 402

MAN23-05 NW 495360 5412699 225 -50 402

MAN23-13 NW 494930 5413340 240 -50 444

MAN23-14 NW 494429 5413990 62 -50 420

MAN23-15 NW 494845 5413725 60 -50 450

4

Other Updates

Canada Nickel also announces today that, subject to the approval of the TSX Venture Exchange, it has

agreed to issue an aggregate of 61,982 common shares of the Company at a deemed issue price of $1.15

per common share in satisfaction of an aggregate of $71,280 in obligations due to a service provider of the

Company. Such common shares will be subject to a four-month hold period under applicable securities

laws.

The Company also announces that it has entered into an amending agreement to the previously announced

option agreement dated February 2, 2022, pursuant to which the Company and the optionor thereunder

agreed to accelerate the option for the Company to acquire a 100% interest in certain mining claims located

in the Province of Ontario. Under the amending agreement, the Company agreed to advance the balance

of the previously announced share and cash payments due thereunder in full satisfaction of the option

without the need to incur any additional exploration expenditures.

Assays, Quality Assurance/Quality Control and Drilling and Assay

Edwin Escarraga, MSc, P.Geo., a "qualified person" as defined by National Instrument 43-101, is responsible

for the on-going drilling and sampling program, including quality assurance (QA) and quality control (QC).

The core is collected from the drill in sealed core trays and transported to the core logging facility. The core

is marked and sampled at 1.5 metre lengths and cut with a diamond blade saw. One set of samples is

transported in secured bags directly from the Canada Nickel core shack to Actlabs Timmins, while a second

set of samples is securely shipped to SGS Lakefield for preparation, with analysis performed at SGS Burnaby

or SGS Callao (Peru). All are ISO/IEC 17025 accredited labs. Analysis for precious metals (gold, platinum and

palladium) are completed by Fire Assay while analysis for nickel, cobalt, sulphur and other elements are

performed using a peroxide fusion and ICP -OES analysis. Certified standards and blanks are inserted at a

rate of 3 QA/QC samples per 20 core samples making a batch of 60 samples that are submitted for analysis.

Qualified Person and Data Verification

Stephen J. Balch P.Geo. (ON), VP Explora tion of Canada Nickel and a "qualified person" as is defined by

National Instrument 43 -101, has verified the data disclosed in this news release, and has otherwise

reviewed and approved the technical information in this news release on behalf of Canada Nic kel

Company Inc.

The magnetic images shown in this press release were created from Canada Nickel's interpretation of

datasets provided by the Ontario Geological Survey.

About Canada Nickel Company

Canada Nickel Company Inc. is advancing the next generation of nickel-sulphide projects to deliver nickel

required to feed the high growth electric vehicle and stainless steel markets. Canada Nickel Company has

applied in multiple jurisdictions to trademark the terms NetZero Nickel TM, NetZero Cobalt TM, NetZero

IronTM and is pursuing the development of processes to allow the production of net zero carbon nickel,

cobalt, and iron products. Canada Nickel provides investors with leverage to nickel in low political risk

jurisdictions. Canada Nickel is currently anchored by its 100% owned flagship Crawford Nickel- Cobalt

Sulphide Project in the heart of the prolific Timmins-Cochrane mining camp. For more information, please

visit www.canadanickel.com.

5

For further information, please contact:

Mark Selby

CEO

Phone: 647-256-1954

Email: [email protected]

Cautionary Statement Concerning Forward-Looking Statements

This press release contains certain information that may constitute "forward-looking information" under

applicable Canadian securities legislation. Forward looking information includes, but is not limited to, the

carbon capture approach could allow product ion of Net Zero nickel and generation of an additional

tonnes of CO2 credits per tonne of nickel produced after offsetting all emissions, the potential to turn

nickel mine into a generator of carbon credits rather than generator of carbon emissions, the production

of estimated average of 710,000 tonnes of carbon credits annually and 18 million total tonnes of CO2 of

credits over expected life of mine at Crawford, the ability to monetize carbon credits, the ability to

quantify carbon capture, emission estima tes, the brucite content of the deposit, the scalability of the

process, the metallurgical results, the timing and results of the feasibility study including the viability of

the inclusion of the IPT Carbonation Process and related facilities as part of th e project, the results of

Crawford’s PEA, including statements relating to net present value, future production, estimates of cash

cost, proposed mining plans and methods, mine life estimates, cash flow forecasts, metal recoveries,

estimates of capital and operating costs, timing for permitting and environmental assessments,

realization of mineral resource estimates, capital and operating cost estimates, project and life of mine

estimates, ability to obtain permitting by the time targeted, size and ranking of project upon achieving

production, 5 economic return estimates, the timing and amount of estimated future production and

capital, operating and exploration expenditures and potential upside and alternatives. Readers should

not place undue reliance on forwardlooking statements. Forward-looking statements involve known and

unknown risks, uncertainties and other factors which may cause the actual results, performance or

achievements of Canada Nickel to be materially different from any future results, perfor mance or

achievements expressed or implied by the forward -looking statements. The PEA results are estimates

only and are based on a number of assumptions, any of which, if incorrect, could materially change the

projected outcome. There are no assurances th at Crawford will be placed into production. Factors that

could affect the outcome include, among others: the actual results of development activities; project

delays; inability to raise the funds necessary to complete development; general business, economic,

competitive, political and social uncertainties; future prices of metals or project costs could differ

substantially and make any commercialization uneconomic; availability of alternative nickel sources or

substitutes; actual nickel recovery; conclusion s of economic evaluations; changes in applicable laws;

changes in project parameters as plans continue to be refined; accidents, labour disputes, the availability

and productivity of skilled labour and other risks of the mining industry; political instability, terrorism,

insurrection or war; delays in obtaining governmental approvals, necessary permitting or in the

completion of development or construction activities; mineral resource estimates relating to Crawford

could prove to be inaccurate for any reaso n whatsoever; additional but currently unforeseen work may

be required to advance to the feasibility stage; and even if Crawford goes into production, there is no

assurance that operations will be profitable. Although Canada Nickel has attempted to identify important

6

factors that could cause actual actions, events or results to differ materially from those described in

forward-looking statements, there may be other factors that cause actions, events or results to differ

from those anticipated, estimated or intended. Forward-looking statements contained herein are made

as of the date of this news release and Canada Nickel disclaims any obligation to update any forward -

looking statements, whether as a result of new information, future events or results or otherwise, except

as required by applicable securities laws. Neither TSX Venture Exchange nor its Regulation Services

Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.