Wednesday, September 16, 2026
MiningNewsTerminal
Wednesday, September 16, 2026 Admin

CMIL.V ·

Capella Expands Copper-Gold Portfolio with Earn-In Agreement on the Solana IOCG Project, Southern Spain

Mergers & Acquisitions

Capella Expands Copper-Gold Portfolio with

Earn-In Agreement on the Solana IOCG

Project, Southern Spain

VANCOUVER, BC

,

Jan. 15, 2026

/CNW/ -

Capella Minerals Ltd.

(TSXV: CMIL) (FRA: N7D2)

("

Capella

" or the "

Company

") is pleased to announce that it has signed a binding Letter of Intent

("LOI") with Verde Minerals Ltd ("Verde") with respect to an Earn-In Agreement (the "Agreement")

on the Solana Iron Oxide Copper-Gold ("IOCG") project in southern

Spain

. The Solana IOCG project

is located 80 km NW of the regional centre / port of Almeria and 20km E of the Alquife iron mine,

and is a district-scale (35+km in length) project which includes the former producing

Cerro de Gallo

and Solana high-grade vein-hosted copper-gold deposits and the copper-rich Conde Xiquena

haematite mine.

The Solana project consists of a series of laterally-extensive, NNW-trending haematite-rich copper-

gold veins hosted dominantly within Proterozoic-age meta-sedimentary rocks and underlain by felsic

intrusions. Whilst future exploration programs at Solana will evaluate the resource potential of the

extensive high-grade vein systems, the Company's primary focus will be on the evaluation of buried

IOCG-type deposits which the Company interprets to be source for the outcropping copper-gold

veins.

Highlights

The district-scale Solana project consists of a 35+km long belt of high-grade, NNW-trending and

haematite-rich copper-gold veins, including the former

Cerro de Gallo

, Solana, and Conde

Xiquena mining operations which ceased operations in the 1920's. The individual copper-gold

veins are laterally-extensive (kilometre-scale), and a cumulative strike extent exceeding 50km

have been mapped to date (Figures 1 - 3). Host rocks are dominantly Proterozoic-age meta-

sedimentary rocks with underlying felsic intrusions.

The Solana project lies within the Betic fold and thrust belt of south-eastern

Spain

, which is

linked tectonically to the collision between the Eurasian plate and the African plate (and with the

formation of the Rif and Atlas Mountain chains in northern

Morocco

).

Previous exploration work completed at Solana (2010-2013) included a 1,775 line km heliborne

magnetic / radiometric survey (covering the central portion of the current project area), stream

sediment sampling and a mapping exercise including the assaying of 1,300 rock chip samples,

and a limited drill campaign in which only three short diamond drill holes were successfully

completed. Geophysical surveys (including an initial magneto-telluric - or AMT - survey and a

gravity survey planned for 2026) are expected to provide additional information on the buried

source of the high-grade haematite-gold-copper mineralization mapped at surface.

Strong community support exists for new mining projects and a favourable location with respect

to both infrastructure (railways, highways, and ports) along with proximity to major renewable

energy sources (including the nearby Andasol solar and Cuerva wind energy farms) are key

attributes of the project. The Minas de Alquife mine, which was historically

Europe's

second

largest open-pit iron ore operation, is located approximately 20km due W of Solana along the

same regional structural corridor and is currently being assessed by its third-party owners for

re-opening.

The Project currently consists of one granted Investigation Permit (Filabres 1; covering 14.6

km

2

) and two Exploration Permit applications (Filabres PE 1 & 2; covering 212 km

2

in total).

The Company expects exploration activities to commence immediately at Solana, with initial drill

target definition in early-2026 to be followed up by first-pass diamond drilling in late-2026. Seasoned

geologist

John Gray

has been designated Project Manager for Solana.

Eric Roth

, Capella's President and CEO, commented

: "I am extremely pleased to be announcing

the incorporation of the Solana Iron-Oxide Copper-Gold project in to Capella's exploration and

development portfolio. The Solana project represents a new geological target type for southern

Spain

, with only limited historical exploration having been completed since the closure of operating

mines in the 1920's. Indeed, whilst most exploration companies operating in the Iberian Peninsula

have focused on the Cretaceous-age Pyrite Belt of southwestern

Spain

, the Solana IOCG project

represents a new concept for potential copper-gold discoveries. I sincerely look forward to keeping

all stakeholders updated as we move forward with exploration at Solana".

Figure 1. Regional geological setting of the Solana project (Spanish Geological Survey – IGME;

LHS), together with an overview of the former Cerro de Gallo mining operations (and an interior view

of the main mine access at Cerro de Gallo)(RHS). (CNW Group/Capella Minerals Limited)

Figure 2. Haematite-rich copper-gold veining from the Cerro de Gallo area. (CNW Group/Capella

Minerals Limited)

Figure 3. Filabres 1 Investigation Permit and Filabres PE 1 & 2 Exploration Permit applications with

mapped haematite-rich copper-gold veins and copper and gold assays at the Solana Project. (CNW

Group/Capella Minerals Limited)

Terms of the LOI

Capella will have the option to acquire an initial 75% interest in the Solana project from Verde's

100%-owned Spanish subsidiary Cobre y

Oro Andaluz

("CyOA") through the following staged

earn-in agreement:

Phase I - Capella will have earned-in to an initial 30% interest in the project by completing

the minimum exploration commitment (as stipulated by the Andalucia mining authorities) on

each granted permit within 12 months. Capella's minimum spend on the granted Filabres 1

permit for 2026 will be

Euro 290,000

.

Phase II – Capella will have earned-in to a 51% interest in the project by completing the

minimum exploration expenditure on each granted permit within 24 months of their

respective grant dates.

Phase III - Capella will have earned-in to a 75% interest in the project by completing the

minimum exploration expenditure on each granted permit, and completing a Pre feasibility

Study, within 72 months of their respective grant dates.

After Capella has completed the earn-in to 75%, Verde will have the option to either

maintain its 25% interest in the project by funding its pro-rata share of project expenditures,

or dilute out to a 2% NSR using a standard industry dilution formula.

Capella to provide Verde with a refundable

Euro 70,000

environmental bond to be lodged with

the Andalucia government for the granted Filabres 1 permit

Capella to pay Verde the amount of

Euro 115,000

upon signing this LOI. In addition, Capella will

make annual payments of

Euro 50,000

to Verde upon the first of either i) the relinquishment of

all properties that form of this agreement or ii) Capella completes all items required as per

Phase III of the Agreement.

Seasoned geologist

John Gray

has been designated Project Manager for Solana.

The binding LOI with Verde remains subject to acceptance by the TSX Venture Exchange.

Qualified Persons and Disclosure Statement

The technical information in this news release relating to the Solana copper-gold project has been

prepared in accordance with Canadian regulatory requirements set out in NI 43-101, and approved

by

Eric Roth

, the Company's President & CEO, a Director, and a Qualified Person under NI 43-101.

Mr. Roth holds a Ph.D. in Economic Geology from the University of

Western Australia

, is a Fellow of

the Australian Institute of Mining and Metallurgy (AusIMM) and is a Fellow of the Society of

Economic Geologists (SEG). Mr. Roth has 35 years of experience in international minerals

exploration and mining project evaluation.

On Behalf of the Board of Capella Minerals Ltd.

"Eric Roth"

___________________________

Eric Roth

, Ph.D., FAusIMM

President & CEO

About Capella Minerals Ltd

Capella is a Canadian exploration and development company with a focus on generating gold-copper

projects globally.

Capella announced on

September 2, 2025

, the signing of a Definitive Agreement with Turkish mining

company, Tümad Madencilik Sanayi Ve Ticaret A.S. ("Tümad"), for a staged earn-in on the

Company's portfolio of precious and base metal projects in Scandinavia. Tümad's minimum Year 1

investment commitment includes

12,000m

of diamond drilling on the Company's gold-copper projects

in the Central Lapland Greenstone Belt of northern

Finland

(

4,000m

) and copper-cobalt-zinc VMS

projects in central

Norway

(

8,000m

).

Capella also retains a carried 10% interest through to production on the Løkken copper-cobalt-zinc

VMS project of central

Norway

through a partnership with Teako Minerals Corp. ("Teako"). In

addition, Capella holds Net Smelter Royalties on the Savant Gold Project in

Ontario, Canada

(BeMetals Corp.) and the Central Finland Lithium Projects (Grit Metals Corp.), as a result of the

recent divestiture of non-core assets.

For additional information you are cordially invited to visit the Capella Minerals Ltd website at

www.capellaminerals.com

, or to contact

Karen Davies

, VP Communications and Corporate

Development, at Tel: +1.604.314.2662.

Cautionary Notes and Forward-looking Statements

This news release contains forward-looking information within the meaning of applicable securities

legislation. Forward-looking information is typically identified by words such as: believe, expect,

anticipate, intend, estimate, postulate and similar expressions, or are those, which, by their nature,

refer to future events. Such statements include, without limitation, statements regarding the future

results of operations, performance and achievements of Capella, including the timing, completion

of and results from the exploration and drill programs described in this release. Although the

Company believes that such statements are reasonable, it can give no assurances that such

expectations will prove to be correct. All such forward-looking information is based on certain

assumptions and analyses made by Capella in light of their experience and perception of historical

trends, current conditions and expected future developments, as well as other factors management

believes are appropriate in the circumstances. This information, however, is subject to a variety of

risks and uncertainties and other factors that could cause actual events or results to differ

materially from those projected in the forward-looking information. Important factors that could

cause actual results to differ from this forward-looking information include those described under

the heading "Risks and Uncertainties" in Capella's most recently filed MD&A. Capella does not

intend, and expressly disclaims any obligation to, update or revise the forward-looking information

contained in this news release, except as required by law. Readers are cautioned not to place

undue reliance on forward-looking information.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the

TSXV) accepts responsibility for the adequacy or accuracy of this release.

SOURCE

Capella Minerals Limited

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2026/15/c5969.html

%SEDAR: 00023195E

For further information:

Capella Contacts: Eric Roth, Email: [email protected], Karen

Davies, +1.604.314.2662

CO: Capella Minerals Limited

CNW 07:30e 15-JAN-26