Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CLIC.V ·

Comet Lithium Submits Permit to Drill at Liberty

Exploration Programs Permits & Approvals

COMET LITHIUM SUBMITS PERMIT TO DRILL

AT LIBERTY

ROUYN-NORANDA, QC

,

Sept. 20, 2023

/CNW/ - Comet Lithium Corporation (TSXV: CLIC)

("

Comet Lithium"

or the

"Company"

), is pleased to announce that it has initiated the planning and

permitting process of its first drill program on its 100%-owned Liberty property located in

James

Bay

, Québec, adjacent to Winsome Resources' Adina project.

On

August 28, 2023

, the Company announced the identification of numerous pegmatite outcrops and

glacial boulders on the Liberty property. Following phase one of the ground exploration program, the

extension of the Adina trend was also covered with a soil survey (C-horizon). A total of 272 samples

were taken with an average spacing of ~100 metres between samples, to mitigate the challenges

posed by the scarcity of outcrops and the presence of lakes.

The Company has been evaluating the inaugural drill program based not only on the structural

lineament pattern connecting the Adina trend with the Liberty property, but also using its most recent

field data. The recently acquired data has allowed the Company to observe favorable pegmatite and

structural features grouped around east-west, north to north-east and north-east orientation.

At this stage, multiple drill holes collars have been planned inside a carefully established corridor

about one kilometre wide inside the Trieste volcanic formation. This environment, which is composed

mainly of amphibolite injected by different granitic and pegmatitic phases, hosts spodumene bearing

pegmatite forming the Adina trend.

It is expected that each hole, will be drilled following a north-west orientation with a 45-degree dip

and has been strategically positioned to intersect a magnetic contrast which could correspond to

pegmatite swarms. As the Company gains more in-depth knowledge with sampling results, incoming

LiDAR data and a geophysics program, holes will be prioritized and drilled accordingly. It is also

important to note that there is no historical drilling that has taken place on the Company's Liberty

property.

Mr.

Mansoor Jan

, Comet Lithium's new Interim CEO and President, stated: "We strongly believe it is

necessary to initiate this early-stage drill program on the Liberty property considering that Winsome

Resources, our neighbor, has successfully extended the spodumene bearing pegmatite intrusion less

than one kilometre west of the property boundary. We are confident that the interpretation work

completed so far will allow us to identify the continuity of pegmatites of the same type inside the

Liberty property."

Comet Lithium's technical team will optimize and potentially expand the drill program by incorporating

output from LiDAR survey and insight generated from additional geophysical work.

COMET LITHIUM SUBMITS PERMIT TO DRILL AT LIBERTY (CNW Group/Comet Lithium Corp.)

Q

u

alified Person

Martin Demers

, P. Geo (ogq #770, APEGNB L5980, PGO #3785), registered in the Provinces of

Québec,

New-Brunswick

, and

Ontario

a consultant to Comet Lithium, is a qualified person

under

National Instrument 43

101

- Standards of Disclosure for Mineral Projects.

He has reviewed the

technical contents of this news release and has approved the disclosure of the technical information

contained herein.

About Comet Lithium Corporation

Comet Lithium is a dynamic lithium-focused exploration company active in the prolific

James Bay

District of

Quebec

. Comet Lithium's flagship asset is its 100%-owned Liberty Property contiguous to

Winsome Resources' Adina deposit, a growing high-grade discovery. Comet Lithium is advancing

Liberty to first-ever drilling.

Forward-Looking Statements

This news release contains statements that may constitute "forward-looking information" within the

meaning of applicable Canadian securities legislation. Forward-looking information may include,

among others, statements regarding the future plans, costs, objectives or performance of Comet

Lithium, or the assumptions underlying any of the foregoing. In this news release, words such as

"may", "would", "could", "will", "likely", "believe", "expect", "anticipate", "intend", "plan", "estimate"

and similar words and the negative form thereof are used to identify forward-looking statements.

Forward-looking statements should not be read as guarantees of future performance or results, and

will not necessarily be accurate indications of whether, or the times at or by which, such future

performance will be achieved. No assurance can be given that any events anticipated by the

forward-looking information will transpire or occur, including the exploration programs, the results

therefor and development (including results from the ground samples collected on the Liberty

property, results for the LIDAR survey or geophysics program, the drill program and any future

exploration programs on he Liberty property, or if it does so, what benefits Comet Lithium will

derive from the Liberty property and any such exploration programs. Forward-looking information is

based on information available at the time and/or management's good-faith belief with respect to

future events and are subject to known or unknown risks, uncertainties, assumptions and other

unpredictable factors, many of which are beyond Comet Lithium's control. These risks, uncertainties

and assumptions include, but are not limited to the risks relating to the capital market conditions, risk

that the Company might not be able to obtain the capital resources necessary to complete a drill

program or any exploration program on the Liberty property, as well those risks, uncertainties and

assumptions described under "Financial Instruments" and "Risk and Uncertainties in Comet Lithium's

Annual Report for the fiscal year ended

December 31, 2022

, a copy of which is available on

SEDAR+ at

www.sedarplus.ca

, and could cause actual events or results to differ materially from

those projected in any forward-looking statements. Comet Lithium does not intend, nor does it

undertake any obligation, to update or revise any forward-looking information contained in this news

release to reflect subsequent information, events or circumstances or otherwise, except if required

by applicable laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

the release

.

Website:

CometLithium.com

SOURCE

Comet Lithium Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2023/20/c1459.html

%SEDAR: 00035962E

For further information:

Comet Lithium Corporation, Mansoor Jan, Interim President & CEO

147

Québec Avenue

Rouyn-Noranda, Québec, J9X 6M8 Email: [email protected], Website:

CometLithium.com; MarketSmart Communications Inc., Adrian Sydenham, Toll-free: 1-877-261-

4466, Email: [email protected]

CO: Comet Lithium Corp.

CNW 08:00e 20-SEP-23