Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CIA.TO ·

Quebec Iron ORE to Ship First Vessel of High Quality Canadian Iron ORE from Sept-Îles to Asia

Corporate Updates

PRESS RELEASE

QUEBEC IRON ORE TO SHIP FIRST VESSEL OF HIGH QUALITY CANADIAN IRON

ORE FROM SEPT-ÎLES TO ASIA

Montréal, March 27, 2018 – Quebec Iron Ore Inc. (“QIO”), a Champion Iron Limited (ASX:CIA) (TSX:CIA)

(“Champion” or the “Company”) subsidiary, is pleased to announce that preparation for the first shipment

of Bloom Lake Iron Ore Mine (“Bloom Lake”) high quality iron ore is underway following the arrival of the

MV Magnus Oldendorff at the Port of Sept-Îles on March 25, 2018.

The first shipment to Asia will comprise up to 200,000 wet metric tonnes of high-grade 66% Fe iron

concentrate, part of the tonnage transported by rail to the port over the last month from QIO’s Bloom

Lake mine located near Fermont, Quebec.

The loading of the MV Magnus Oldendorff

(pictured) at the Pointe-Noire terminal

completes a historic milestone for the

Company and the Port of Sept-Îles as it

represents the first vessel loading at the

brand new terminal and also marks the

inauguration of the new conveyor linking

the stockyard to the new terminal.

For the Company, this first shipment

demonstrates QIO’s ability to deliver high

quality product to global markets. As part of

this capability, in addition to owning specialised railcars for the transportation of iron ore, Bloom Lake has

access to a fully operational rail loop on-site as well as access to substantial and modern rail and port

storage and handling infrastructure between Fermont and Pointe-Noire.

The successful delivery of iron ore concentrate to the port this month, and the subsequentfirstshipment of the

product to Asia,highlights QIO’s efficientlogisticsstrategy andconfirmsBloom Lake’s potential to become a major

supplier ofhigh qualityiron ore to global markets.

“The first vessel is being loaded almost one month ahead of our original schedule with a high quality iron

ore product fully in line with specifications and with our pilot plant test work. This is evidence of the

professionalism of all employees involved and the hard work of our stakeholders, as well as of the world

class potential of the project”, stated Executive Chairman and CEO of QIO and Champion, Michael

O’Keeffe.

Mr O’Keeffe further commented that the 200,000wmt shipment to Asia of the Bloom Lake high-grade iron

concentrate is being completed at a time where current iron ore prices of US$71 pmt for 62% Fe are 25%

higher than the estimates of US$56 pmt used by the Company in its original planning.

The first shipment is a positive start for amine that is forecast to generate more than CAD15.1 billion in

revenue over the next 20 years, underlining Bloom Lake’s potential to be one of the region’s leading long -

life iron ore mines and a major contributor to both the Quebec and Canadian economies. The QIO logistics

strategy ensures long-term access to some of the world’s largest consumers of iron ore for Bloom Lake’s

high-quality product.

The decision to restart production at the Boom Lake Mine was announced on November 15, 20 17, and

operations recommenced at the plant on February 16, 2018, ahead of schedule and within budget. With a

CAPEX of CAD 326.8 million, including CAD 157.2 million spent on upgrades ahead of the mine restart,

Bloom Lake is a large-scale project which is set to bring about a new era of prosperity to Quebec’s North

Shore region.

About Quebec Iron Ore Inc.

Founded in 2016 by the mining development company Champion Iron Limited, Quebec Iron Ore Inc. is a

100% Quebec-based entity managed by experts from Quebec. The company was mandated to direct th e

relaunch of the Bloom Lake Mine, a Champion Iron flagship project in Fermont, in northern Quebec.

About Champion Iron Limited

Champion is an iron development and exploration company, focused on developing its significant iron

resources in the south end of the Labrador Trough in the province of Québec. Following the acquisition of

its flagship asset, the Bloom Lake iron ore property, the Company implemented upgrades to the mine and

processing infrastructure and has partnered inprojects associated with improving access to global iron

markets, including rail and port infrastructure initiatives with government and other key industry and

community stakeholders. Champion’s management team includes professionals with mine development

and operations expertise, who also have vast experience from geotechnical work to green field

development, brown field management including logistics development and financing of all stages in the

mining industry.

For further information pl ease contact:

Michael O’Keeffe, Executive Chairman and CEO at Tel. +1 514-316-4858

David Cataford, COO at Tel. +1 514-316-4858

For additional information on Champion Iron Limited, please visit our website at

www.championiron.com

Forward-Looking information

This news release includes certain information that may constitute “forward-looking information” under

applicable Canadian securities legislation. All statements, other than statements of historical facts,

included in this news release that address the expected restart date of Bloom Lake as well as future

activities, events, developments or financial performance constitute forward - looking information. The use

of any of the words “will”, “expect”, “anticipate”, “intend”, “believe”, “plan”, “potential”, “outlook”,

“forecast”, “estimate” and similar expressions are intended to identify forward -looking information.

Forward-looking information is necessarily based upon a number of estimates and assumptions that, while

considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which

may cause the actual results and future events to differ materially from those expressed or implied by such

forward-looking information, including the risks identified in Champion’s final s hort form prospectus

relating to a completed equity Offering, annual information form, management’s discussion and analysis

and other securities regulatory filings made by Champion on SEDAR (including under the heading “Risk

Factors” therein). There can be no assurance that such information will prove to be accurate, as actual

results and future events could differ materially from those anticipated in such forward - looking

information. Accordingly, readers should not place undue reliance on forward -looking information. All of

Champion’s forward-looking information contained in this press release is given as of the date hereof and is

based upon the opinions and estimates of Champion’s management and information available to

management as at the date hereof. Champion disclaims any intention or obligation to update or revise any of

its forward-looking information, whether as a result of new information, future events or otherwise, except

as required by law.