Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CIA.TO ·

Champion Iron Acquires 735 Specialized Iron Ore Railcars for Bloom Lake Mine

Mergers & Acquisitions

March 15, 2017

Champion Iron Acquires 735 Specialized Iron Ore Railcars

for Bloom Lake Mine

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE

UNITED STATES

Montréal, Québec, Canada: Champion Iron Limited (ASX: CIA, TSX: CIA) (“Champion” or the

“Company”) is pleased to announce that the Bloom Lake Mine (“Bloom Lake”) is a step closer to

recommencement of mining operations following the acquisition of a fleet of railcars capable of

carrying iron ore from its mine near Fermont to the port at Sept-Iles, Québec.

C

hampion Chairman and CEO Michael O’Keeffe said: “Owning our own fleet of railcars will deliver

substantial strategic and cost benefits as we bring Bloom Lake back into full- scale production. The

acquisition is also a major step towards financing the Bloom Lake restart.”

S

ociété de voitures de chemin de fer du Lac Bloom Inc., a wholly-owned subsidiary of the Company,

acquired 735 specialized iron ore railcars from Canadian Iron Ore Railcar Leasing LP , for

consideration of US$30.1 million. The fleet is operational and ready for deployment.

Th

e Company is paying 6% of the acquisition price as a down -payment with the balance to be

financed by a three year seller note at a rate of LIBOR plus 1.75% per annum . The acquisition price

was detailed in the “ Capital Expenditure s Including Working Capital ” component of the recently

announced Feasibility Study results for Bloom Lake announced by the Company on February 16,

2017.

T

he Feasibility Study demonstrates that recommencing iron ore mining operations at Bloom Lake is

financially viable. With Mineral Reserves estimated to 411.7 million tonnes and forecast to generate

more than $15 billion in revenue over the next 20 years, Bloom Lake has the potential to be one of

the region’s leading long-life iron ore mines and a major contributor to the national economy.

Blo

om Lake already has rail loop infrastructure, with access to end markets via rail and port. The rail

access consists of ; a 31.9km rail spur on -site that is operational and connects to the Quebec North

Shore & Labrador (QNS&L) railway at the Wabush Mines facilities in Wabush, Labrador; a second

segment using the QNS&L railway between Wabush to the Arnaud junction in Sept -Îles; and a final

segment from Arnaud to Pointe -Noire port facilities in Sept -Iles where the concentrate will be

unloaded, stockpiled and then loaded on vessels for export.

For further information please contact:

Michael O’Keeffe, Executive Chairman and CEO at Tel. +1 514-316-4858

David Cataford, VP Engineering at Tel. +1 514-316-4858

About Bloom Lake

On April 11, 2016, the Company, through its subsidiary, Québec Iron Ore Inc., acquired the Bloom Lake assets

from affiliates of Cliffs Natural Resources Inc. that were subject to restructuring proceedings under the

Companies’ Creditors Arrangement Act (Canada). Québec Iron Ore Inc. is 63.2% owned by the Company, with

the remaining 36.8% equity interest owned by Ressources Québec, acting as a mandatory of the Government

of Quebec.

The Bloom Lake property is located on the south end of the Labrador Trough, approximately 13 km north of

Fermont, Quebec, and 10 km north of the Mount -Wright iron ore mining operation of Arcelor Mittal Mines

Canada. The Bloom Lake Mine is an open pit truck and shovel operation , with a concentrator. From the site,

iron concentrate can be transported by rail, initially on the Bloom Lake Railway, to a ship loading port in Sept -

Iles, Québec.

The Bloom Lake Mine has already been authorized for operation under the federal and provincial

environmental authorities . The project was subject to an environmental impact assessment process under

Section 31 of the Provincial Environment Quality Act, which led to the first decree issued by the Quebec

government in 2008 authorizing mining activities at the Bloom Lake site . An updated positive Feasibility Study

on Bloom Lake is being completed and will be available under the Company’s profile on SEDAR

(www.sedar.com) at the end of March, 2017.

About Champion

Champion is an iron development and exploration company, focused on developing its significant iron

resources in the south end of the Labrador Trough in the province of Québec. Following the acquisition of its

flagship asset, the Bloom Lake iron ore property, the Company’s main focus is to implement upgrades to the

mine and processing infrastructure it now owns while also adva ncing projects associated with improving

access to global iron markets, including rail and port infrastructure initiatives with government and other key

industry and community stakeholders.

Champion’s management team includes professionals with mine devel opment and operations expertise who

also have vast experience from geotechnical work to green field development, brown field management

including logistics development and financing of all stages in the mining industry.

For additional information on Champion Iron Limited, please visit our website at www.championiron.com

This news release includes certain information that may constitute "forward -looking information" under

applicable Canadian securities legislation. All statements, other than statements of historical facts, included in

this news release that address future activities, events, developments or financial performance constitute

forward-looking information. The use of any of the words "will", "expect", “anticipate”, “intend”, "believe",

"plan", "potential", “outlook”, “forecast”, “estimate” and similar expressions are intended to identify forward-

looking information. Forward- looking information is necessarily based upon a number of estimates and

assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and

other factors which may cause the actual results and future events to differ materially from those expressed or

implied by such forward- looking information, including the risks identified in Champion’s annual information

forms, management’s discussion and analysis and o ther securities regulatory filings made by Champion on

SEDAR (including under the heading "Risk Factors" therein). There can be no assurance that such information

will prove to be accurate, as actual results and future events could differ materially from t hose anticipated in

such forward -looking information. Accordingly, readers should not place undue reliance on forward- looking

information. All of Champion’s forward -looking information contained in this press release is given as of the

date hereof and is based upon the opinions and estimates of Champion’s management and information

available to management as at the date hereof. Champion disclaims any intention or obligation to update or

revise any of its forward -looking information, whether as a result of new information, future events or

otherwise, except as required by law.