Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CGM.V ·

Tirex to Acquire Up to 100% of Gold and Lead-Zinc-Silver Project in Kosovo

Mergers & Acquisitions

7

488-1090 West Georgia St. Tel: 604-687-7130 www.tirexresources.com

Vancouver B.C. [email protected]

Canada V6B 1L8 TXX: TSX-V

March 30, 2017 - NR 05-2017

NEWS RELEASE

NEWS RELEASE

Tirex to Acquire Up to 100% of Gold and Lead-Zinc-Silver Project in Kosovo

• adjacent to three past producing lead-zinc-silver mines

• on-strike with the Slivovo gold discovery

• exploration license valid for 6 years including with extensions

Tirex Resources Ltd. (“Tirex”) is pleased to announce that it has signed a Memorandum of Understanding

(“Agreement”) to acquire up to 100% of Cerovina Property in Kosovo adjacent to and north of its Romovista

Property. Tirex geologists visited the Cerovina Property and visually confirmed the presence of copper, lead,

zinc mineralization and zones with quartz veinlets in thinly bedded clastic sediments. Cerovina has an area of

3,136 hectares and is on strike and adjoining the Slivovo gold discovery which is controlled by Byrnecut

International Ltd., a private Australian company. A few kilometers to the west of the property boundary are

past producing lead-zinc-silver mines of Kishnica (*historic reserve of 4.12 million tons @ 4.75% Pb, 1.02%

Zn and 64.11 g/t Ag), Hajvalia (*historic reserve of 1.1 million tons @ 9.65% Pb, 18.26% Zn and 126.4 g/t

Ag) and Badovc mine (*historic reserve of 7. 62 million tons @ 5.2% Pb, 3.13% Zn and 70.7 g/t Ag).

Together with Artana mine to the east , these mines used to produce in the past 200,000 tons per year which

were processed at the Kishnica processing plant together with materials from Artana mine farther to the east

of Cerovina (*information provided by Artana mine staff). The tonnages and grades quoted above are

“historic reserve” (not compliant with NI 43 -101). For clarity, these mines are not on Tirex property but are

examples of nearby mines that suggest the exploration potential for similar mineralization on the property.

Slivovo exploration is fully funded by Brynecut and it is rapidly advancing towards the completion of a pre-

feasibility study. The Peshter Gossan is the main body of high grade gold mineralizat ion on the Slivovo JV.

It is approximately 125m long x 25 -40m thick and 50 -75m wide. Drilling at Peshter Gossan has shown

significant gold intercepts such as SLV004 –126.5 meters @ 6.2 g/t gold; 15.0 g/t silver (drillhole SLV004)

and 12.0 meters @ 12.2 g/t gold; 8.02 g/t silver (drillhole SLV005) ((information taken from

www.avrupaminerals.com).

Cerovina Property

The Cerovina Property is covered by an exploration license valid for up to 6 years including extensions. A

regional-scale structure trending north -south passing through or close to the Slivovo gold discovery extends

through the eastern part of the property. Additional to the proximity to Slivovo, approximately 2 to 4 kms to

the west are the Kishnica, Hajvalia and Badovc lead-zinc-silver mines.

Tirex believes that due to its proximity to the Slivovo gold discovery and past producing mines there is

excellent potential for gold and lead-zinc-silver mineralization. Tirex will review existing information on the

property and will make plans for exploration.

Page 2 of 2

Tirex President, Mr. Fred Tejada, P.Geo, states, “This second property acquisition positions Tirex as a major

explorer in Kosovo. The presence of several past producing mines nearby and the significant Slivovo

discovery of Avrupa give confidence to Tirex that it is in the right geological jurisdiction and looks forward

to positive exploration results in the future.”

Terms of the Agreement

Under the Agreement, Tirex has the option to earn 80% interest on the property by spending €2.0 million

within 5 years and paying a total of €60,000 to the claim owner within 3 years after signing of the

Agreement. If the claimowner decides not to participate in funding the development of the project after Tirex

has earned its interest, the claimowner’s interest will be reduced to a 2.5% NSR.

On Behalf of Tirex Resources Ltd.

Spiro Kletas

CEO and Director

Forward-Looking Statements. This Tir ex News Release may contain certain "forward -looking" statements

and information relating to Tirex. Such statements include but are not limited to statements about the Award,

the production arrangements and the timing of the mine development, mill construc tion and ore production.

Often forward -looking statements or information include words such as "plans", expects", "intends",

"anticipates", "estimates" "forecasts", or variations of such words and phrases or statements that certain

actions, events or resul ts "may", "could", "would", "might" or will be taken occur or be achieved. Although

forward-looking statements and information contained in this release are based on the beliefs of Tirex

management, which we consider to be reasonable, as well as assumptions made by and information currently

available to Tirex management, there is no assurance that the forward -looking statement or information will

prove to be accurate. The assumptions made include assumptions about Tirex's ability to move forward with

the licensing. The forward-looking statements and information contained in this release are subject to current

risks, uncertainties and assumptions related to certain factors including, without limitations, obtaining all

necessary approvals, feasibility of mine and plant development, exploration and development risks,

expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic

factors, competitive factors, general economic conditions, relationships with vendors a nd strategic partners,

governmental regulation and supervision, seasonality, technological change, industry practices, and one-time

events as well as risks, uncertainties and other factors discussed in our quarterly and annual and interim

management's discussion and analysis. Should any one or more of these risks or uncertainties materialize or

change, or should any underlying assumptions prove incorrect, actual results and forward-looking statements

and information may vary materially from those described herein. Accordingly, readers should not place

undue reliance on forward -looking statements and information contained in this release. We undertake no

obligation to update forward -looking statements or information except as required by law. All resource s or

reserves estimates quoted in this news release are historical, uncategorized and not NI 43 -101 compliant and

should not be relied upon.

"Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of th e TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release."