Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CGM.V ·

Tirex Resources Receives Mining License FOR Rehova Copper Project

Permits & Approvals

488-1090 West Georgia St. Tel: 604-687-7 130 www.tirexresources.com

Vancouver B.C. [email protected]

Canada V6E3V7 TXX: TSX-V

February 28, 2017 - NR 03-2017

NEWS RELEASE

TIREX RESOURCES RECEIVES MINING LICENSE FOR REHOVA COPPER PROJECT

 the license was issued after Tirex deposited mining guarantee and environmental fund

 the license has a 25-year term

 Rehova is a high grade past producing copper mine

Tirex Resources Ltd. (“Tirex” or “the Company”) reporte d in its most recent news release that it received

approval of the mining license application for the Rehova mining property (“Rehova”) in Albania. Tirex is

pleased to announce that the license ha s now been issued to the Compan y by National Business Center. The

mining license is valid for 25 years and can be extended for another 10 years.

The approval of the license will finally allow Tirex to move ahead with its plans on Rehova which include

drilling during the first year to update the historic resources to current resources compliant with National

Instrument 43-101 while also targeting expansion of the known mineralized zones. Additionally, drilling will

target to test for gold, silver and zinc mineraliza tion as the focus of past state-run drilling programs was

primarily copper. As part of the go forward planni ng at Rehova, Tirex will purchase state records from the

Albanian Geological Survey. These records include hist orical results from all the holes drilled by the state

run mining enterprise that formed the basis for their hi storical modeling, additional holes drilled by the state

run mining enterprise in the later part of Rehova’s operations or prior to its closure but not incorporated into

the historical model, and also exploration data from the areas surrounding Rehova.

Rehova is located 114 kms straight distance southeast of Tirana or 200 kms by road and is on the electrical

power grid. The mining property contains four historical VMS deposits. These are surrounded by exploration

areas of interest that have not yet been systemati cally tested using modern exploration techniques and

technology. The four known deposits called Bregu i Geshtenjes (“B&G”), Rehova -Kanisqel, Çiflig and

Dushku i Trashe comprise the Rehova Copper Mine, a historically producing mining operation which was

formerly operated by the Albanian state copper enterp rise. These deposits are relatively close to each other

(200m-500m apart) which made ore delivery to a single processing facility possible.

Prior to the start of production in 1980 the Albanian Geological Survey (“AGS”) had defined combined

mineralization in the four deposits of 3.43 million t ons grading 2.17% copper and by the time operations

stopped in 1990 had 2.87 million tons grading 2.14% c opper remaining. The majority of the remaining

mineralization consisting of 2.09 m illion tons grading 2.15% copper were from B&G, which was not mined

and has exploration potential beyond the historic dr illing. Underground developm ent workings had been

started at B&G as the deposit was being prepared for mining when the state run mining enterprise shut down

its mining operations country-wide at the time of the collapse of communism.

The tonnage and grade estimates stated above are hist oric in nature and were obtained from information

provided by the Albanian government. The AGS histor ical calculations classify the estimates in a

Page 2 of 3

combination of C1 & C2 categories, being based on the Russian deposit reporting system and are roughly

equivalent to the NI 43-101 inferred and indicated cat egories. These historical estimates are not compliant

with NI 43-101 and should not be re lied upon. No qualified person has done sufficient work to classify the

historical estimates as current mineral resources; and Tirex is not treating the historical estimates as current

mineral resources. Tirex is including the historical estimates for information purposes only, and offers no

assurances as to the reliability of th e estimates. Tirex will need to un dertake a comprehensive review of

available data, including planned drilling by Tirex to verify the historic estimates and classify them as current

resources.

Tirex also plans to explore for similar VMS deposits elsewhere in the Rehova region. Planned exploration,

designed to vector in on similar VMS deposits, will c onsist of ground Induced Polarization/Resistivity and

ground electromagnetic geophysical surveys along with geological mapping and sampling. Several prospects

had been identified by the AGS prior to the closure of the mine and Tirex intends to evaluate the potential of

developing multiple deposits of various sizes that will feed a central mill that produces potentially copper,

gold, silver and/or zinc.

Fred Tejada, P.Geo., a Qualified Person under National Instrument 43- 101, has reviewed and approved the

scientific and technical information in this press release.

On Behalf of Tirex Resources Ltd.

Spiro Kletas

CEO and Director

Forward-Looking Statements. This Tirex News Release may contai n certain "forward-looking" statements

and information relating to Tirex. Such statements in clude but are not limited to statements about the Award,

the production arrangements and the timing of the mine development, mill constr uction and ore production.

Often forward-looking statements or information incl ude words such as "plans", expects", "intends",

"anticipates", "estimates" "forecasts", or variations of such words and phrases or statements that certain

actions, events or results "may", "could", "would", "mi ght" or will be taken occur or be achieved. Although

forward-looking statements and information contained in this release are based on the beliefs of Tirex

management, which we consider to be reasonable, as well as assumptions made by and information currently

available to Tirex management, there is no assurance th at the forward-looking statement or information will

prove to be accurate. The assumptions made include assu mptions about Tirex's ability to move forward with

the licensing. The forward-looking statements and informa tion contained in this release are subject to current

risks, uncertainties and assumptions related to certain factors including, without limitations, obtaining all

necessary approvals, feasibility of mi ne and plant development, expl oration and development risks,

expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic

factors, competitive factors, general economic conditions , relationships with vendor s and strategic partners,

governmental regulation and supervision, seasonality, t echnological change, industry practices, and one-time

events as well as risks, uncertainties and other factor s discussed in our quarterly and annual and interim

management's discussion and analysis. Should any one or more of these risks or uncertainties materialize or

change, or should any underlying assumptions prove inco rrect, actual results and forward-looking statements

and information may vary materially from those desc ribed herein. Accordingly, readers should not place

undue reliance on forward-looking statements and inform ation contained in this release. We undertake no

obligation to update forward-looking statements or information except as required by law. All resource

estimates quoted in this news releas e are historical, uncategorized and not NI 43-101 compliant and should

not be relied upon. Tirex has not verified these histor ical resources and has not reviewed the assumptions,

parameters and methods used to prepare the histor ical resource estimate. No Qualified Person has done

sufficient work to classify the histor ical estimates as current and Tirex is not treating the historical estimates

as current mineral resources or reserves but considers them as historically relevant and material information.

Page 3 of 3

A feasibility study has not been completed and ther e is no certainty the proposed operation will be

economically viable or will commence.

"Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsib ility for the adequacy or accuracy of this news

release."