Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CGM.V ·

European Electric Metals Completes Six Drill Holes at Rehova Copper Project

Exploration Programs

488-1090 West Georgia St. www.europeanelectricmetals.com

Vancouver B.C. Canada V6E3V7 [email protected]

Tel: 604-687-7130 TSX-V: EVX

April 9, 2018

NEWS RELEASE

European Electric Metals Completes Six Drill Holes at Rehova Copper Project

 six drill holes complete with 104 core samples now delivered to ALS Global

 drilling continues with three additional holes to be completed within Phase 1

 drill core from near surface targets in Kanisqel pit area inclu ded in the samples now

shipped and being prepared for assays

European Electric Metals Inc. (“EVX:TSXV”) (“EVX” or the “Compa ny”) is pleased to announce

that it has completed six holes within the Phase 1 drill progra m at the company’s Rehova Copper

Project located in Albania.

Core from drilling completed to date has been sent for preparat ion and assay, while drilling is

ongoing.

Three of the completed holes were shallow holes, drilled in the periphery of the Kanisqel pit, with the

aim of targeting near surface mineralization. The remaining holes targeted mineralization associated

with the historical BG deposit (formerly called Bregu i Geshtenjes).

A total of 104 core samples were delivered last week to the ALS laboratory in Bor, Serbia where the

samples will be prepared and sent for analysis to ALS laborator ies in Europe. The samples will be

assayed for multi-elements including copper, gold, silver, coba lt, lead and zinc. The Company

included external control samples (blank and standards). ALS will employ their own internal QAQC

and control sampling.

The drill rig is now moving to a new location within BG, its seventh hole. The Company plans to drill

three more holes during Phase 1 which includes an exploration h ole to test an IP chargeability

anomaly that will test both vertical and lateral extensions of the BG deposit.

While no historic mining took place at BG, Kanisqel was historically mined by open-pit methods.

Rehova is located 115 kilometres southeast of Tirana (200 km by road) and is on the electrical power

grid. The property contains four historical volcanogenic massiv e sulphide deposits. These are

surrounded by exploration areas of interest that have not yet been systematically tested using modern

exploration techniques and tec hnology. The four known deposits, called BG, Kanisqel, Ciflig and

Dushku i Trashe, comprise the Rehova copper mine, a historically producing mining operation which

was operated by the Albanian state copper enterprise. These deposits are relatively close to each other

(200 m to 500 m) which made mineral delivery to a single processing facility possible.

Prior to the start of production in 1980, the Albanian Geologic al Survey had defined combined

mineralization in the four deposits of 3.43 million tons grading 2.17 per cent copper* and by the time

operations stopped in 1990, had 2.87 million tons grading 2.14 per cent copper* remaining. The

majority of the remaining mineralization was reported as 2.09 m illion tons grading 2.15 per cent

copper* and were from Bregu, which was not mined and has exploration potential beyond the historic

drilling. Underground development workings had been started at Bregu as the deposit was being

prepared for mining when the state-run mining enterprise shut down its operations country-wide.

Ciflig and Dushku i Trashe were mined by underground method whi le Rehova-Kanisqel was mined

by open pit and to a limited extent by underground. The materia ls mined were sent to a processing

plant nearby with an annual cap acity of 60,000 tonnes per year. It should be noted that the largest

deposit, Bregu, has not been mined.

* The tonnage and grade estimates stated above are historic in nature and were obtained from

information provided by the Albanian government. The AGS histor ical calculations classify the

estimates in a combination of C1 and C2 categories, being based on the Russian deposit reporting

system and are roughly equivalent to the National Instrument 43 -101 inferred and indicated

categories. These historical estimates are not compliant with NI 43-101 and should not be relied upon.

No qualified person has done sufficient work to classify the hi storical estimates as current mineral

resources; and European Electric Metals is not treating the his torical estimates as current mineral

resources. European Electric Metals is including the historical estimates for information purposes

only and offers no assurances as to the reliability of the estimates. European Electric Metals will need

to undertake a comprehensive review of available data, includin g planned drilling by European

Electric Metals, to verify the historic estimates and classify them as current resources.

About European Electric Metals Inc.

European Electric Metals Inc. (“EVX”) is a Canadian listed comp any, with projects in Europe. The

largest shareholder of EVX is the European Bank for Reconstruct ion and Development (“EBRD”).

The goal of EVX is to become a major source of battery metals such as copper, nickel and cobalt, and

the company seeks to do so within safe, stable and logistically attractive European jurisdictions. The

company's projects are ideally l ocated with excellent road, por t and grid power availability, and in

close proximity to European countries that are poised to experi ence dramatic growth in the electric-

vehicle-manufacturing industry. There is a strong battery-manufacturing industry within Europe with

many more projects in the pipeline.

On behalf of the Company,

Fred Tejada, Chief Executive Officer and Director

Forward-Looking Statements. This news release contains “forward -looking” statements and

information relating to the Company and the Rehova Project that are based on the beliefs of Company

management, as well as assumptions made by and information curr ently available to Company

management. Such statements reflect the current risks, uncertai nties and assumptions related to

certain factors including but not limited to, without limitatio ns, exploration and development risks,

expenditure and financing requirements, general economic conditions, changes in financial markets,

the ability to properly and efficiently staff the Company’s ope rations, the sufficiency of working

capital and funding for continued operations, title matters, co mmunity relations, operating hazards,

political and economic factors, competitive factors, metal pric es, relationships with vendors,

governmental regulations and ove rsight, permitting, seasonality and weather, technological change,

industry practices, and one-time events. Should any one or more risks or uncertainties materialize or

change, or should any underlying assumptions prove incorrect, a ctual results and forward-looking

statements may vary materially from those described herein. The Company does not undertake to

update forward-looking statements or forward-looking information, except as required by law.

488-1090 West Georgia St. www.europeanelectricmetals.com

Vancouver B.C. Canada V6E3V7 [email protected]

Tel: 604-687-7130

On Behalf of the Company,

Fred Tejada, Chief Executive Office and Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSXV) accepts responsibility for the adequacy or accuracy of this release.