Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CFE.CN ·

Cartier Silver Files NI 43-101 Technical Report by Micon for the Los Chorrillos (Gonalbert-Felizidad) Silver Project, Tupiza, Potosi Department, Southern Bolivia

Resource Estimates Technical Reports (NI 43-101)

1

20 Adelaide Street East, Suite 200, Toronto, Ontario CANADA M5C 2T6 Tel.: 1 (800) 360-8006

NEWS RELEASE

Cartier Silver Files NI 43-101 Technical Report by Micon for the Los Chorrillos

(Gonalbert-Felizidad) Silver Project, Tupiza, Potosi Department, Southern Bolivia

TORONTO, May 9, 2023 – Cartier Silver Corporation (CSE:CFE) (“ Cartier Silver ” or the

“Company ”) is pleased to announce that the Company has filed on SEDAR an independent technical

report (“ Technical Report ”) by Micon International Limited (“ Micon ”), prepared in accordance with

National Instrument 43-101 - Standards of Disclosure for Mineral Projects (" NI 43-101 "). This Technical

Report, authored by Mr. Charley Murahwi, P.Geo., Pr. Sci. Nat., FAusIMM, of Micon, supports Cartier

Silver’s planned exploration program at the Los Cho rrillos (Gonalbert-Felizidad) Silver Project (“ Los

Chorrillos” or the “Project ”), in the Potosí Department, southern Bolivia by M inera Cartier Bolivia

S.R.L., Cartier Silver’s Bolivian subsidiary. The Technical Report will also be posted on the Company’s

website, www.cartiersilvercorp.com.

In the Technical Report, Micon concludes: “In summary, the following factors qualify Los Chorrillos as a

property of merit warranting detailed investigations to unravel its full potential:

i) Favourable geological/metallogenic setting.

ii) Clear visual evidence of mineralization at surf ace and shallow underground workings offering

opportunities for both open pit and underground exploitation.

iii) Presence of a current flourishing producing ar tisanal mine, which although small, could get

better/bigger with detailed exploration and capital injection.”

Micon further noted: “The above resource/reserve potential attributes ar e enhanced by the following

infrastructural advantages:

 Proximity to established power grids, domestic paved roads, and rail transportation routes.

 Easy access to Northern Chilean seaports (Somarco and Portezuelo).

 Road and rail access to 3 Bolivian smelters – Vinto, OMSA and Karachipampa.

Overall, Micon is of the opinion that detailed exploration/investigation of the Los Chorrillos will likely yield

positive results towards establishing a much larger viable mining venture.”

A two-phase exploration program is recommended in the Technical Report. Phase I includes targeted

exploration, geoscientific studies (Induced Polarization and Magnetometry) and limited sampling and is

estimated at CDN$400,000. The Phase II exploration program, which is contingent on the successful

completion of Phase 1, includes 5,000m of diamond d rilling and is estimated to cost CDN$2,000,000.

Micon concludes that the budget under consideration is reasonable and justified and recommends that

2

Cartier Silver conduct the planned activities.

Tom Larsen, Cartier Silver’s CEO, commented: “The C ompany is very pleased with Micon’s efforts in

completing the Los Chorrillos NI 43-101 Report. The Technical Report clearly defines Cartier Silver’s

next steps to advance this project, in order to unl ock its potential unrealized value. We are already

proceeding forward with Phase I exploration on this highly prospective property.”

Qualified Person

Dr. Bill Pearson, P.Geo., a Qualified Person as defined under National Instrument 43-101 (NI 43-101),

has reviewed and approved the scientific and techni cal content of this press release. Mr. Charley

Murahwi, P.Geo., Pr. Sci. Nat., FAusIMM, of Micon International Limited, a Qualified Person as defined

under NI 43-101, is the author of the Technical Report on the Los Chorrillos Gonalbert-Felizidad) Silver

Project.

About Cartier Silver Corporation

Cartier Silver is an exploration and development Company focused on discovering and developing

its recently acquired silver property assets, inclu ding the Chorrillos Project and claims staked by th e

Company’s subsidiary, all of which are located in t he Potosi Department of southern Bolivia. The

Company also holds significant iron ore resources a t its Gagnon Holdings in the southern Labrador

Trough region of east-central Quebec, and the Big E asy gold property in the Burin Peninsula epithermal

gold belt in the Avalon Zone of eastern Newfoundland and Labrador.

For further information please visit Cartier Silver’s website at www.cartiersilvercorp.com

For further information please contact:

Thomas G. Larsen Jorge Estepa

Chief Executive Officer Vice-President

(800) 360-8006 (800) 360-8006

(416) 360-8006 (416) 360-8006

The CSE has not reviewed nor accepts responsibility for the adequacy or accuracy of this release.

Statements in this release that are not historical facts are “forward-looking statements” and readers are

cautioned that any such statements are not guarantees of future performance, and that actual developments or

results, may vary materially from those in these “forward-looking statements”.