CERRADO GOLD ANNOUNCES Q3 GOLD PRODUCTION RESULTS FOR ITS MINERA DON NICOLAS

MINE IN ARGENTINA

• Q3 Production of 16,604 Gold Equivalent Ounces (“GEO”) vs 16,255 GEO in Q2 and

11,204 in Q1, 2024.

• Calandrias Norte high-grade ore supplemented by additional pits extending CIL

operation into 2025.

• Production of 3,404, GEO from Heap leach operations during the quarter with a

record of 1,644 GEO in August.

• Balance sheet continues to improve, with approximately US$12m in current liabilities

repaid since March 2024.

TORONTO, ONTARIO - Cerrado Gold Inc. [TSX.V: CERT][OTCQX: CRDOF] (“Cerrado” or the

“Company”) announces production results for the third quarter ended September, 2024 (“Q3 2024”)

from the Minera Don Nicolas Mine in Santa Cruz Province, Argentina (“MDN”). Full third quarter

financial results are expected to be released in November 2024.

Q3 Operating Highlights

• Q3 Production of 16,604 GEO vs 16,255 GEO in Q2 and 11,204 in Q1, 2024.

• Choique and Zorro pits supplemented CIL feed from Calandrias Norte during the

quarter. CIL plant will continue operating until the end of January 2025.

• Focus remains on doubling up crushing capacity at Calandrias Sur and bringing heap

leach production up to 4,500 GEO per month.

Operational results for Q3 2024 demonstrated a slight increase in production over the the previous

quarter, highlighting stabilized operations. Ore from the Calandrias Norte high-grade open pit was

exhausted but replaced by additional high-grade feed from two additional pits. In addition, the ramp

up of heap leach operations continued to improve as crushing capacity continued to climb with

record production of 1,644 GEO in August before a slight decline in September as some adjustments

were put in place to support the overall expansion of the facilities . The performance of the Heap

leach continues to depend on the crushing circuit. To maintain production rates until an additional

crushing circuit is installed , two mobile crushers were added , resulting in a total crushing capacity

of 300,00 0 tons per month . The design of a new crushing circuit is complete , and a secondary

crusher has been ordered. The secondary crusher will double the capacity with a single crushing

circuit supporting the ramp up in production from the heap leach operations. The installation of the

secondary crusher is expected to reduce fleet and operating cost s. The new circuit is expected to

-2-

operate by the end of the 4th quarter, at which time the mobile crushers will be placed on stand by.

Recovery rates are in line with expectations given ore on the pad to date.

The Company has also continued to make progress in improving its working capital position during

the quarter, partly due to the cashflow generated by high gold prices and strong production. At

quarter end, the Company’s total current liabilities (including payables, loans, and amounts due to

the Sellers) have been reduced by approximately US$12MM from the end of Q1 2024, with further

reductions expected in the coming quarters, strengthening the overall financial position of the

Company.

Mark Brennan, CEO and Chairman commented, "Production in the third quarter remained strong

over the second quarter owing to additional high -grade feed to the CIL as well as increasing

production from the heap leach facility . As crushing performance continues to improve, we expect

to see heap leach production continue its upward trajectory towards the targeted 4,500 GEO per

month with a commiserate reduction in operating costs.”

-3-

Table 1. Key Operating Information

Review of Technical Information

The scientific and technical information in this press release has been reviewed and approved by

Sergio Gelcich, P.Geo., Vice President, Exploration for Cerrado Gold Inc., who is a Qualified Person

as defined in National Instrument 43-101.

About Cerrado

Cerrado Gold is a Toronto-based gold production, development, and exploration company focused

on gold projects in South America. The Company is the 100% owner of both the producing Minera

Don Nicolás and Las Calandrias mine in Santa Cruz province, Argentin a, and the highly prospective

Monte Do Carmo development project, located in Tocantins State, Br azil under option to Amarillo

Mineração Do Brasil Ltda., a subsidiary of Hochschild Mining PLC. In Canada, Cerrado Gold is

developing it's 100% owned Mont Sorci er Iron Ore and Vanadium project located outside of

Chibougamou, Quebec.

Operating Data Unit Q1 2024 Q2 2024 Q3 2024

High Grade CIL Operations

Ore Mined ktonnes 375 303 187 85 58 43

Waste Mined ktonnes 4,530 4,043 6,529 2,618 1,791 2,120

Total Mined ktonnes 5,223 4,409 7,519 2,892 2,080 2,548

Strip ratio waste/ore 12.08 13.33 35 30.70 30.70 48.81

Mining rate tpd 14,311 12,079 20,601 32,133 22,854 27,694

Ore Milled Ktonnes 395 367 255 90 66 99

Head Grade Au g/t 4.56 4.59 4.90 3.65 7.08 4.58

Head Grade Ag g/t 10.97 5.59 9.99 10.21 12.86 7.86

Recovery Au % 91.6% 90.4% 90.5% 87.6% 91.2% 91.9%

Recovery Ag % 63.3% 62.1% 57.2% 55.7% 53.8% 62.5%

Mill Throughput tpd 1,082 1,006 698 1,001 725 1,072

Gold ounces produced oz 52,504 50,658 36,549 9,879 13,648 13,022

Silver equivalent ounces produced oz 1,167 492 560 193 187 179

Gold Geo Produced oz 53,672 51,150 37,108 10,072 13,835 13,201

Heap Leach Operations

Ore Mined ktonnes 560 804 189 230 385

Waste Mined ktonnes 1,115 2,112 519 708 885

Total Mined ktonnes 1,675 2,916 708 938 1,269

Strip ratio waste/ore 1.99 2.63 2.74 3.08 2.30

Mining rate tpd 6,837 8,703 7,868 15,377 13,798

Ore PAD Feed Ktonnes 446 950 231 285 434

Head Grade Au g/t 0.52 0.74 0.59 0.85 0.75

Head Grade Ag g/t 4.54 10.69 9.82 12.39 10.04

Recovery Au % 13.4% 29.5% 25.4% 29.4% 31.2%

Recovery Ag % 2.59% 7.85% 3.49% 9.14% 9.08%

PAD Throughput tpd 4,927 4,675 2,565 4,675 4,715

Gold ounces produced oz 1,057 6,646 1,103 2,290 3,253

Silver equivalent ounces produced oz 23 308 29 130 150

Gold Geo Produced oz 1,080 6,955 1,132 2,420 3,403

Consolidated Gold Produciton

Gold Geo Produced oz 53,672 52,230 44,063 11,204 16,255 16,604

Gold Geo Sold oz 51,923 54,100 42,086 10,331 15,818 15,937

Average realized price per gold ounce sold $/oz 1,742 1,849 2,182 1,970 2,199 2,306

Key Operating Information

Jan to Dec,

2022

2024Jan to Dec,

2023

Jan to Sept,

2024

-4-

In Argentina, Cerrado is maximizing asset value at its Minera Don Nicolas operation through

continued operational optimization and is growing production through its operations at the Las

Calandrias Heap Leach project. An extensive campaign of exploration i s ongoing to further unlock

potential resources in our highly prospective land package in the heart of the Deseado Masiff.

In Canada, Cerrado holds a 100% interest in the Mont Sorcier Iron Ore and Vanadium project, which

has the potential to produce a premium iron ore concentrate over a long mine life at low operating

costs and low capital intensity. Furthermore, its high grad e and high purity product facilitates the

migration of steel producers from blast furnaces to electric arc furnaces , contributing to the

decarbonization of the industry and the achievement of SDG goals.

For more information about Cerrado please visit our website at: www.cerradogold.com.

Mark Brennan

CEO and Chairman

Mike McAllister

Vice President, Investor Relations

Tel: +1-647-805-5662

[email protected]

Disclaimer

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS

DEFINED IN POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE

ADEQUACY OR ACCURACY OF THIS RELEASE.

This press release contains statements that constitute “forward -looking information” (collectively,

“forward-looking statements”) within the meaning of the applicable Canadian securities legislation.

All statements, other than statements of historical fact , are forward -looking statements and are

based on expectations, estimates and projections as at the date of this news release. Any statement

that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future

events or performance (often but not always using phrases such as “expects”, or “does not expect”,

“is expected”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”,

“estimates”, “believes” or “intends” or variations of such words and phrases or stating that certain

actions, events or results “may” or “could”, “would”, “might” or “will” be taken to occur or be

achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements contained in this press release include, without limitation, statements

regarding the business and operations of Cerrado, the potential for additional crushing capacity that

may be added, the performance of the heap leach pad, CIL plant life extension, anticipated

production in Q4 2024 and anticipated strengthening of the Company’s financial position. In making

the forward - looking statements contained in this press release, Cerrado has made certain

assumptions. Although C errado believes that the expectations reflected in forward -looking

statements are reasonable, it can give no assurance that the expectations of any forward -looking

statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which

-5-

may cause the actual results and future events to differ materially from those expressed or implied

by such forward -looking statements. Such factors include, but are not limited to general business,

economic, competitive, political and social uncertainties . Accordingly, readers should not place

undue reliance on the forward -looking statements and information contained in this press release.

Except as required by law, Cerrado disclaims any intention and assumes no obligation to update or

revise any forward -looking statements to reflect actual results, whether as a result of new

information, future events, changes in assumptions, changes in factors affecting such forward -

looking statements or otherwise.

.