Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CDPR.V ·

Cerro de Pasco Resources is Granted Historic Authorization and Starts Drilling Quiulacocha Tailings First Phase Geophysics Study completed

Exploration Programs Permits & Approvals

Cerro de Pasco Resources is Granted Historic

Authorization and Starts Drilling Quiulacocha Tailings

First Phase Geophysics Study completed

MONTRÉAL, August 2 7, 2024 (GLOBE NEWSWIRE) -- Cerro de Pasco Resources Inc. (CSE: CDPR)

(OTCPK: GPPRF) (FRA: N8HP) (“CDPR” or the “Company”) is pleased to inform that it has received

the required authorization for the Initiation of Exploration Activities from the Peruvian Mi nistry of

Energy and Mines. This represents the first -ever such authorization to be granted in Peru for a new

mining exploration project within a tailings storage facility.

Accordingly, the Company is now installing its first drill rig to begin its Phase I drilling program at the

Quiulacocha Tailings Project (“QT Project”).

The Company has in parallel completed first phase Geophysical Studies to outline the bottom

surface of the tailings deposit.

Guy Goulet comments: “This is a significant milestone for the country: This is the first ever drilling

authorization granted for a new mining exploration project over tailings in the history of Peru, not

related to a beneficiation concession. It is also a very exciting stage for CDPR as we will finally

discover the true value of the QT tailings and be able to produce a Master Plan for the entire

Quiulacocha tailings resource. CDPR will update the market with drill results as soon as they

become available. "

Drilling Program

CDPR has hired Ingetrol Comercial S.A.C., a Peruvian subsidiary of Grupo Ingetrol, to perform the

Phase I Drilling campaign. Over a period of approximately eight weeks, Ingetrol will carry out 40 drill

holes to gather more than 1,000 tailings samples, facilitating comprehensive data acquisition

throughout the entire depth of the Quiulacocha tailings.

Laboratory Testing

Inspectorate Services Perú S.A.C., a Peruvian subsidiary of Bureau Veritas, will conduct the

geochemical and metallurgical testing program in Lima, Peru and Antofagasta, Chile. The tailings

samples, taken at every meter, will be dispatched to the Bureau Veritas lab in Lima for a 60-element

ICP Analysis and other assays. Subsequently, the tailings samples will be combined into

representative composites and sent to Antofagasta, Chile, for metallurgical testing.

This extensive laboratory program will determine the mineral resource estimate and metallurgical

methods for the reprocessing of the Quiulacocha tailings.

Geophysics

CDPR has enlisted Geomain Ingenieros S.A.C., a Peruvian company specializing in geophysical

applications for mineral exploration and engineering, to conduct Phase 1 geophysics. Geomain

Ingenieros S.A.C. has successfully completed over 9,000 m of geophysical surveys on the dry portion

of the Quiulacocha tailings. The preliminary interpretation of the geophysical profiles indicates that

the tailings deposit surpasses 40 meters in depth in certain locations, exceeding the original

expectations.

The Quiulacocha Tailings

CDPR is the titleholder of the concession located in Peru called “El Metalurgista” , which grants it the

right to explore and exploit the Quiulacocha Tailings located within its assigned area. The

enforceability of these rights has been formally confirmed by the General Mining Bureau of Peruvian

Ministry of Energy and Mines.

The Quiulacocha Tailings Storage Facility covers approximately 115 hectares and is estimated to hold

approximately 75 million tonnes of material processed from the 1920s to 1990s.

Initially these tailings resulted from the mining 16+ million tonnes of copper -silver-gold

mineralization with reported historical grades of up to 10% Cu, 4 g/t Au and over 300 g/t Ag and later

from the mining of 58+ million tonnes of zinc-lead-silver mineralized material with average historical

grades of 7.41% Zn, 2.77% Pb and 90.33 g/t Ag.

With minimal mining costs due to surface -level material and current reprocessing capacity at

adjacent plants, CDPR's Quiulacocha Project stands out as one of Peru's key mining initiatives. This

endeavor not only promises economic benefits but also aims to restore the environment and create

employment opportunities, aligning with the local community's needs.

Technical Information

Mr. Alfonso Palacio Castilla, MIMMM/Chartered Engineer (CEng) and Project Superintendent for

CDPR, has reviewed and approved the scientific and technical information contained in this news

release. Mr. Palacio is a Qualified Person for the purposes of reporting in compliance with NI 43-101.

About Cerro de Pasco Resources

Cerro de Pasco Resources Inc. is focused on the development of its principal 100% owned asset, the

El Metalurgista mining concession, comprising silver -rich mineral tailings and stockpiles extracted

over a century of operation from the Cerro de Pasco open pit mine in Central Peru. The company’s

approach at El Metalurgista entails the reprocessing and environmental remediation of mining waste

and the creation of numerous opportunities in a circular economy. The asset is one of the world’s

largest above-ground resources.

Forward-Looking Statements and Disclaimer

Certain information contained herein may constitute “forward-looking information” under Canadian

securities legislation. Generally, forward-looking information can be identified using forward-looking

terminology such as “plans” , “seeks” , “expects” , “estimates” , “intends” , “anticipates” , “believes” ,

“could” , “might” , “likely” or variations of such words, or statements that certain actions, events or

results “may” , “will” , “could” , “would” , “might” , “will be taken” , “occur” , “be achieved” or other similar

expressions.

Forward-looking statements, including the expectations of CDPR’s management regarding the

realization, timing and scope of its drilling program, the completion of a resource report as well as

the business and the expansion and growth of CDPR’s operations, are based on CDPR’s estimates

and are subject to known and unknown risks, uncertainties and other factors that may cause the

actual results, level of activity, performance or achievements of CDPR to be materially different from

those expressed or implied by such forward-looking statements or forward-looking information.

Forward-looking statements are subject to business and economic factors and uncertainties and

other factors, that could cause actual results to differ materially from these forward -looking

statements, including the relevant assumptions and risks factors se t out in CDPR’s public

documents, available on SEDAR+ at www.sedarplus.ca. There can be no assurance that such

statements will prove to be accurate, as actual results and future events could differ materially from

those anticipated in such statements. Although CDPR believes that the assumptions and factors

used in preparing the forward-looking statements are reasonable, undue reliance should not be

placed on these statements and forward -looking information. Except where required by applicable

law, CDPR disclaims any intention or obligation to update or revise any forward -looking statement,

whether as a result of new information, future events or otherwise.

Further Information

Guy Goulet, CEO

Telephone: +1-579-476-7000

Mobile: +1-514-294-7000

[email protected]