Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

CDB.V ·

Cordoba Minerals Reports Additional In-fill Drilling Results from the Alacran Copper- Gold-Silver Project in Colombia ACD174 Reports 140.9 Metres of 0.70% Copper Equivalent 1 (0.42% Copper, 0.5 g/t Gold and 2.71 g/t Silver)

Drill Results

Cordoba Minerals Reports Additional In-fill

Drilling Results from the Alacran Copper-

Gold-Silver Project in Colombia

ACD174 Reports 140.9 Metres of 0.70% Copper Equivalent

1

(0.42% Copper, 0.5 g/t Gold and

2.71 g/t Silver)

ACD177* Reports 223.00 Metres of 0.60% Copper Equivalent

1

(0.47% Copper, 0.25 g/t Gold and

3.85 g/t Silver)

Vancouver, British Columbia--(Newsfile Corp. - May 9, 2023) - Sarah Armstrong-Montoya, President

and Chief Executive Officer of

Cordoba Minerals Corp. (TSXV: CDB) (OTCQB: CDBMF)

(otherwise "Cordoba" or the "Company")

, is pleased to report the latest assay results received from

the ongoing in-fill drilling program at the Alacran Copper-Gold-Silver Project.

Highlights:

Significant intercepts returned from the latest in-fill drill holes include (Table 1):

ACD174 - 140.9 metres ("m") from 15.6 m to 156.5 m with 0.42% copper ("Cu"), 0.50 g/t

gold ("Au") and 2.71 g/t silver ("Ag"), or 0.70% copper equivalent1 ("CuEq"), including:

13.80 m from 59.0 m to 72.8 m with 1.34% Cu, 4.05 g/t Au and 7.95 g/t Ag, or 3.74%

CuEq1.

ACD177* - 223.00 m from 27.00 m to 250.00 m with 0.47% Cu, 0.25 g/t Au and 3.85 g/t Ag,

or 0.60% CuEq

1

, including:

90.25 m from 79.25 m to 169.50 m with 0.80% Cu, 0.33 g/t Au and 6.84 g/t Ag, or

0.98% CuEq

1

,

27.50 m from 222.5 m to 250.00 m with 0.36% Cu, 0.28 g/t Au and 2.01 g/t Ag, or

0.52% CuEq

1

.

ACD181 - 104.45 m from 61.55 m to 166.00 m with 0.58% Cu, 0.23 g/t Au and 2.40 g/t Ag, or

0.69% CuEq

1

, including:

44.11 m from 101.54 m to 145.65 m with 0.86% Cu, 0.42 g/t Au and 3.61 g/t Ag, or

1.08% CuEq

1

.

"As we move towards the end of the in-fill drilling program, I am pleased that the assay results continue

to demonstrate the quality of the Alacran mineral resource model," commented Sarah Armstrong-

Montoya, President and CEO of Cordoba. "We continue to see high-grade mineralization in the north

and central parts of the Alacran Deposit, which could be accessible during the early mining years."

Additional drill holes further confirm the overall life of mine resource grades at the Alacran

Deposit.

ACD174 and ACD177 tested the central part of the Alacran Deposit (Figure 1), and returned grades

that are typical of the overall life of mine resource grade.

ACD174 returned 0.7% CuEq

1

over 140.9 m from 15.6 m to 156.5 m (Figure 2). The hole demonstrates

the local enrichment caused by the north-south trending structures. These structures intersect carbonate

rich parts of the "Unit 2" stratigraphy, and result in preferential replacement of carbonates by sulfides,

resulting in higher grades of 1.39% Cu, 0.46 g/t Au and 8.85 g/t Ag between 62 m and 63.8 m (Figure 7).

ACD177 returned 0.60% CuEq

1

over 223.00 m from 27.00 m to 250.00 m (Figure 3), and further

demonstrates both the broad intercept and local enrichment in the north-south trending structures, which

intersected the carbonate rich portions of the "Unit 2" stratigraphy.

Drill holes ACD181, ACD187, and ACD189 have identified a 20 m thick sill in the east end of the

Alacran Deposit (Figure 1). Although these drill holes intersected the sill, each drill hole also intersected

the lower and higher grade mineralization on either side of the sill (Figures 4, 5, 6 and 8). The local

volumes of mineralized material may be affected.

The ongoing drilling program will focus on the peripheral in-fill areas in the south of the Alacran Deposit

where lower grades are expected as predicted by the Pre-Feasibility block model. The final

hydrogeological, geotechnical, and infrastructure sterilization holes are expected to be completed within

the next few weeks.

Table 1: Drill results of the latest drill holes from the Alacran Deposit second phase in-fill

drilling program.

Hole

From

(m)

To

(m)

Interval

2

(m)

Cu

(%)

Au

(g/t)

Ag

(g/t)

CuEq

1

(%)

ACD174

15.60

156.50

140.90

0.42

0.50

2.71

0.70

Including

15.60

33.30

17.70

0.33

0.24

1.01

0.46

Including

59.00

72.80

13.80

1.34

4.05

7.95

3.74

Including

119.70

156.50

36.80

0.74

0.22

5.57

0.85

ACD175

*

4.61

77.75

73.14

0.81

0.58

7.34

1.14

Including

*

4.61

29.70

25.09

0.33

0.65

8.45

0.75

Including

43.30

77.75

34.45

1.43

0.69

9.30

1.80

ACD176

40.69

68.60

27.91

1.05

0.11

4.08

1.06

ACD177

*

27.00

250.00

223.00

0.47

0.25

3.85

0.60

Including

79.25

169.50

90.25

0.80

0.33

6.84

0.98

Including

222.5

250.00

27.50

0.36

0.28

2.01

0.52

ACD178

*

12.10

77.50

65.40

0.74

0.40

3.69

0.95

Including

*

12.10

28.30

16.20

1.81

0.49

6.86

2.01

Including

55.95

69.40

13.45

1.19

0.64

7.09

1.54

ACD179

37.60

171.70

134.10

0.53

0.13

2.87

0.58

Including

37.60

79.00

41.40

0.64

0.16

1.96

0.70

Including

103.70

136.10

32.40

0.90

0.30

5.73

1.05

Including

161.60

171.70

10.10

0.64

0.01

5.59

0.63

ACD180

93.80

126.00

32.20

0.28

0.17

1.27

0.37

ACD181

61.55

166.00

104.45

0.58

0.23

2.40

0.69

Including

101.54

145.65

44.11

0.86

0.42

3.61

1.08

ACD182

*

10.90

200.80

189.90

0.29

0.15

2.07

0.37

Including

68.10

83.65

15.55

0.75

0.57

4.21

1.06

Including

*

90.45

134.70

44.25

0.47

0.18

3.47

0.57

Including

180.50

200.80

20.30

0.35

0.11

2.99

0.41

ACD183

*

6.90

78.10

71.20

0.78

0.49

3.81

1.04

Including

*

6.90

27.40

20.50

1.88

0.38

6.84

2.01

Including

57.71

78.10

20.39

1.19

0.65

6.28

1.54

ACD184

*

11.75

73.85

62.10

0.36

0.14

0.82

0.42

ACD185

*

40.90

148.00

107.10

0.34

0.29

1.62

0.50

Including

103.60

130.00

26.40

0.82

0.48

4.15

1.08

ACD186

*

18.10

95.60

77.50

0.36

0.07

2.61

0.39

Including

*

18.10

49.90

31.80

0.66

0.11

4.93

0.71

Including

86.00

95.60

9.60

0.73

0.16

5.21

0.81

ACD187

63.50

152.40

88.90

0.59

0.27

3.05

0.73

Including

63.50

82.45

18.95

1.18

0.55

4.17

1.45

Including

105.17

141.15

35.98

0.69

0.27

4.42

0.83

ACD188

107.85

139.00

31.15

0.27

0.16

1.47

0.35

ACD189

61.00

127.00

66.00

0.52

0.20

3.53

0.63

Including

61.00

84.00

23.00

0.97

0.33

6.33

1.13

Including

109.00

127.00

18.00

0.64

0.17

4.41

0.72

ACD190

78.80

161.40

82.60

0.23

0.13

1.68

0.30

Including

118.50

161.40

42.90

0.36

0.09

2.85

0.41

ACD191

*

7.00

81.65

74.65

0.34

0.07

1.17

0.37

ACD192

19.00

68.70

49.70

0.46

0.22

1.27

0.57

ACD193

62.40

146.38

83.98

0.26

0.14

1.51

0.34

Including

86.90

104.29

17.39

0.57

0.32

3.14

0.74

Hole

From

(m)

To

(m)

Interval

2

(m)

Cu

(%)

Au

(g/t)

Ag

(g/t)

CuEq

1

(%)

1

Copper equivalent ("CuEq") is calculated using the formula CuEq=((Copper%*Copper recovery)+100*

((gold grade*gold price*gold recovery)/31.10305)/((copper%*copper price*copper

recovery)*2204.62)+100*((silver grade*silver price*silver recovery)/31.10305)/((copper%*copper

price*copper recovery)*2204.62) using the following assumptions: Metal prices of US$3.25/lb copper,

US$1,600.00/oz gold, and US$20.00/oz silver, copper recovery of 92.5% (fresh and transition zone

only), gold recovery of 78.1% and silver recovery of 62.9%.

Comprehensive metallurgical test programs

have been completed which has led to the creation of head grade/recovery algorithms by principal rock

type. Details are outlined with the

Pre-Feasibility Study

.

2

Intervals are reported as core length only. True widths are estimated to be between 75% and 100% of

the core length.

*

Drill hole has partial core recovery due to poor ground conditions, which is why the from-to lengths do

not equate to the sampled intervals.

Figure 1: Plan view of the latest significant intercepts from the ongoing in-fill drilling program.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_004full.jpg

Figure 2: Cross Section A-A' of ACD174

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_005full.jpg

Figure 3: Cross Section B-B' of ACD177

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_006full.jpg

Figure 4: Cross Section C-C' of ACD181

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_007full.jpg

Figure 5: Cross Section C-C' of ACD187

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_008full.jpg

Figure 6: Cross Section C-C' of ACD189

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_009full.jpg

Figure 7: ACD174 at 62.5 m down hole - a fossiliferous limestone bed that is highly replaced by

semi-massive sulfides consisting of pyrite, chalcopyrite and trace magnetite. The sample

outlines some of the bivalves whose carbonate shells have been preferentially replaced. The

host limestone protolith shows pervasive chlorite alteration. This sample was part of 1.8 m

interval between 62 m and 63.8 m that returned 1.39% Cu, 0.46 g/t Au and 8.85 g/t Ag.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_010full.jpg

Figure 8: ACD187 at 80.05 m shows a grayish green fine tuff with extensive chalcopyrite

mineralization, epidote and chlorite alteration. This sample was part of a 1.2 m interval between

79.1 m and 80.3 m that returned 1.87% Cu, 1.56 g/t Au and 8.29 g/t Ag.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/3116/165285_221b9cd244d7a83e_011full.jpg

Technical Information & Qualified Person

The technical information in this release has been reviewed, verified and approved by Mark Gibson,

P.Geo., a Qualified Person for the purpose of National Instrument 43-101 -

Standards of Disclosure for

Mineral Project

("NI 43-101"). Mr. Gibson is the Chief Operating Officer of Cordoba and of Ivanhoe

Electric Inc., Cordoba's majority shareholder, and is not considered independent under NI 43-101. Mr.

Gibson verified the data disclosed which includes a review of the sampling, analytical and test data

underlying the information and opinions contained therein.

Quality Assurance/Quality Control

Cordoba uses ALS Minerals Laboratory in Medellin, Colombia, ALS Minerals Laboratory in Lima, Peru,

and SGS Colombia S.A.S in Medellin, Colombia. These labs operate in accordance with ISO/IEC

17025.

Cordoba employs a comprehensive industry standard Quality Assurance/Quality Control (QA/QC)

program. PQ and HQ diamond drill core is cut lengthwise into 3 fractions, 1/4 is sent to geochemistry,

half is sent to metallurgy, and 1/4 is left behind in a secure facility for future assay verification.

Some sample shipments are delivered to ALS Minerals Laboratory in Medellin, Colombia where the

samples are prepared. Analysis occurs at the ALS Minerals Laboratory in Lima, Peru.

Alternate sample shipments are delivered to SGS Colombia S.A.S in Medellin, Colombia where the

samples are prepared and analyzed.

Both analytical labs determine the gold by a 50 g fire assay with an AAS finish. An initial multi- element

suite comprising copper, molybdenum, silver, and additional elements are analyzed by four-acid

digestion with an ICP-MS finish. All samples with copper values over 10,000 ppm and gold greater than

10 ppm are subjected to an overlimit method for higher grades, which also uses a four-acid digest with

an ICP-ES finish, and fire test with gravimetric finish. Certified reference materials, blanks, and

duplicates are randomly inserted at the geologist's discretion and QA/QC geologist's approval into the

sample stream to control laboratory performance (15%).

About Cordoba

Cordoba Minerals Corp. is a mineral exploration company focused on the exploration, development and

acquisition of copper and gold projects. Cordoba is jointly developing the Alacran Project with JCHX

Mining Management Co., Ltd., located in the Department of Cordoba, Colombia. Cordoba also holds a

51% interest in the Perseverance Copper Project in Arizona, USA, which it is exploring through a Joint

Venture and Earn-In Agreement. For further information, please visit

www.cordobaminerals.com

.

ON BEHALF OF THE COMPANY

Sarah Armstrong-Montoya, President and Chief Executive Officer

Information Contact

Ran Li +1-604-689-8765

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this

release.

Forward-Looking Statements

This news release includes "forward-looking statements" and "forward-looking information" within the

meaning of Canadian securities legislation. All statements included in this news release, other than

statements of historical fact, are forward-looking statements including, without limitation, but not

limited to, statements with respect to the Alacran Deposit and development thereof; geological

interpretations; results of the current exploration and interpretations thereof; mineralization potential;