Cordoba Minerals Provides an Update on Pre-Feasibility Study Fieldwork at the 100%-Owned Alacran Copper-Gold- Silver Project in Colombia Metallurgical, Geotechnical and Hydrological Drilling is Well-Advanced Exploration Planned at Alacran and Montiel West to Locate
March 31, 2021
Cordoba Minerals Provides an Update on Pre-Feasibility
Study Fieldwork at the 100%-Owned Alacran Copper-Gold-
Silver Project in Colombia
Metallurgical, Geotechnical and Hydrological Drilling
is Well-Advanced
Exploration Planned at Alacran and Montiel West to Locate
Porphyry Copper Mineralization
VANCOUVER, CANADA – Eric Finlayson, President and Chief Executive Officer of
Cordoba Minerals Corp. (TSXV:CDB; OTCQB: CDBMF; otherwise “C ordoba” or “the
Company”) is pleased to provide an update on the ongoing Pre-Feasibility Study (“PFS”)
at its 100%-owned Alacran Copper-Gold-Silver Project. The Alacran project is located in
the Department of Córdoba of northern Colombia in a newly-recognized Laramide-age
porphyry copper-gold district.
“We are making excellent progress on our PFS fieldwork and we remain on track
for finalizing the study before the en d of 2021. We are pleased to see a good
correlation between the resource block model and the metallurgical holes we have
drilled. This confirms that we have a r obust mineral resource at Alacran. We are
also about to reactivate our search f or the hidden porphyry sources of
mineralization at Alacran and M ontiel West. A porphyry copper discovery would
be the platform for the next stage of growth f or the Company,” commented
Mr. Finlayson (see Figure 1 below).
Highlights:
The Mining Technical Work Plan (PTO) and Environmental Impact
Assessment (EIA), required for a Colo mbian mining licence application,
remain on schedule. The PTO is expected to be submitted in Q4 2021 and the
EIA in Q1 2022.
52 of 94 planned drill holes have been completed (see Table 1 below). These
holes are being drilled for geotechnica l, hydrological and metallurgical
testing, with some resource in-fil l holes planned to convert Inferred
Resources to the Measured & Indicated categories. Assay results from the
in-fill drilling will be announced when available.
2
All 63 excavator pits required for ge otechnical investigations have been
completed.
Drill core from four of the seven planne d metallurgical holes is now at Blue
Coast Research on Vancouver Island undergoing metallurgical test work.
Each hole sampled a different part of the orebody.
Assay data have been received for six of the metallurgical drill holes.
o Holes ACD085 and ACD086 were drilled immediately south and north
of the Alacran village (see Figure 2 below), and both showed an
excellent correlation with the anti cipated higher grade zones in the
resource block model, shown in Figures 3 and 4.
o Holes ACD088 and ACD092 both returned good correlations with
predicted high grade structures, shown in Figures 5 and 8.
o Hole ACD090 did not intersect the higher-grade interval anticipated at
the bottom of the hole, which tested the low-grade eastern edge of the
deposit (see Figure 5). The block model will be re-cast to reflect this
new information but will have no significant impact on the Alacran
resource estimate.
o Hole ACD091 tested the sparsely drilled southern part of the deposit,
encountering magnetite-rich inter vals with modest mineralization
towards the bottom of the hole (see Figure 7).
Cordoba’s exploration team is currently designing a geophysical and drilling
program to search for the porphyry sources of the Alacran and Montiel West
deposits.
Hole objective Number of
holes
completed
Meterage (m) Further
planned holes
Geotechnical 23 1,909 12
Hydrological 15 759 3
Metallurgical 6 820 4
Condemnation 8 397 1
Resource In-fill 0 0 22
Total 52 3,885 42
Table 1: Drill holes completed to date as part of the Alacran PFS work program.
The metallurgical holes were originally designed to intersect shallow material to be mined
in the first five years of production. However, with drill casing still in the holes, the decision
has been taken to deepen the holes towards t he bottom of the planned pit where the
current drill spacing and grade estimate is lower. This should help push higher-grade
areas lower within the pit and hopefully extend the pit to greater depth.
3
Hole ID From To Interval
(m)
CuEq
(%)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Cut-off
(%CuEq)
True
Thickness
(approx % of
intercept
width)
ACD085 16.4 51.7 35.3 1.04 0.78 0.37 2.05 0.3 90-100%
80.4 88.0 7.6 0.48 0.21 0.4 0.67 0.3
ACD086 0 63.4 63.4 0.62 0.37 0.33 3.94 0.3 90-100%
71.3 75.43 4.13 0.68 0.61 0.02 6.24 0.3
81.83 92.36 10.53 0.82 0.34 0.03 55.59 0.3
ACD088 0.0 16.0 16 0.51 0.44 0.09 1.68 0.3 90-100%
49.8 73.1 23.3 0.7 0.58 0.12 4.26 0.3
90.0 94.0 4 0.76 0.65 0.14 2.33 0.3
103.7 114.4 10.7 1.14 0.8 0.46 4.71 0.3
119.6 126 6.4 0.69 0.5 0.25 3.18 0.3
176.0 180.4 4.4 0.36 0.29 0.05 3.65 0.3
ACD090 16.0 18.0 2 0.49 0.27 0.33 0.75 0.3 90-100%
22.0 26.0 4 0.62 0.46 0.23 1.24 0.3
48.0 50.0 2 0.3 0.28 0.02 0.78 0.3
68.0 70.0 2 0.36 0.003 0.54 0.08 0.3
ACD091 55.5 65 9.5 0.45 0.37 0.1 1.53 0.3 90-100%
93 97.1 4.1 0.77 0.09 1.03 0.56 0.3
ACD092 47.0 55.0 8 0.69 0.50 0.26 1.37 0.3 90-100%
61.0 69.0 8 0.77 0.54 0.33 1.5 0.3
75.0 106.0 31 2.1 0.49 2.42 1.6 0.3
Table 2: Significant intercepts from recent Alacran metallurgical drilling.
* Copper-equivalent values have been calculated using a US$1,400 per ounce gold price and US$3.10 per
pound copper price and US$17.75 per ounce silver price.
Ongoing PFS engineering design work includes: mining throughput studies; investigating
pit design options; evaluating infrastructure alternatives; assessing plant options and
examining the use of thickened tailings. A comparison between mining throughput of
16,000 tonnes per day as envisaged in the 2019 Preliminary Economic Assessment and
a higher throughput of 20,000 tonnes per day has indicated that the 20,000 tonne per day
case is likely value-accretive through pulling metal production forward.
Environmental baseline studies continue including air, water, vibration, noise, fauna and
flora surveys (see Figures 9 and 10 below). Cordoba continues working with the local
communities within the area of impact, and is currently focused on developing a social
program with short-, medium- and long-term benefits to all members of the communities,
as part of fostering the Company’s social licence to operate.
4
Figure 1: Location of the Alacran and Montiel West deposits.
5
Figure 2: Location of the metallurgical holes.
6
Figure 3: Cross section through ACD085 showing excellent correlation with
predicted near surface high grade material.
N
50m
ACD085
ACD063
SJ07
ACA 003
ACA 005
7
Figure 4: Cross section through ACD086, which gave a good correlation with predicted
high grades in the north of the pit.
ACD086
N
50m
ACD010
ACD051
ACD071
ACD077
ACD060
8
Figure 5: Cross section through ACD088 showing good correlations with predicted
high grades at 50m and 100m depth.
N
50m
ACD088
ACD005